GE 5500 Masonry Wall Construction, Brick, Frame, Stucco and Shingle Construction, Case Angles

Page 25

Masonry Wall Construction (Cont.)

The wall case should be installed during construction and lintels should be used to support the blocks above the wall case. The wall case will not support the concrete block. The installation instructions show how the wall case must be secured to the masonry and caulked. Do not remove the cardboard stiffener supplied with the wall case until ready to install the chassis. See page 29 for details of installation in masonry wall.

For existing masonry construction, wall openings must be made by removing concrete blocks to achieve the proper size opening. Consult the builder, architect, or owner to determine the necessity for lintels to support the block above the wall case.

Anchor bolts are normally required to secure the case to the wall and shims may be required to prevent distortion of the wall case when securing the wall case to the wall. Field supplied case angles can be used to position and secure the wall case to the wall and to cover oversized wall openings.

Brick, Frame, Stucco and Shingle Construction

For new construction, the opening for the wall case should be framed and the wall case inserted into the opening during construction. Lintels should be used when the building material is heavy and is not self supporting (such as brick). The wall case will fit an opening of six courses of standard brick or five courses of jumbo brick. Wall framing in this type construction is normally on 16" centers and the wall case will fit a framed opening spanning three 16" O.C. 2" x 4" stud spaces.

For existing construction the indoor and outdoor wall will need to be cut out, allowing for clearances of 1/8" on all sides of the wall case. Work should begin on the inside wall. Cut the correct dimensions and mark (using drill holes) the outside wall from each corner of the inside cutout. Studding that interferes with the opening must be removed and a suitable frame constructed to secure the wall case and provide adequate support for case and chassis.

Preparation of the Wall Case for All Types of Construction

As shipped, the RAB71 or RAB77 is ready for installation. Do not remove the stiffener from inside the wall case or the weather closure panel from the outside face of the wall case until the outdoor grille and chassis are ready to be installed.

Installation of Wall Case in Wall Opening

1.Position the wall case into the wall. The room side edge of the RAB71 or RAB77 wall case should be at least flush with the finished wall for line cord installations and permanent connection installations when no sub-base is used, and should project into the room at least 2-3/8" when a sub- base is used. If the minimum exterior dimensions are not met, refer to page 27 and 28. The outside edge of the wall case should extend at least 1/4" beyond the outside wall. This is necessary for proper caulking, to prevent sealing the drain holes in the rear flange of the wall case, and to facilitate the installation of an accessory drain, if used.

The wall case should be level from side to side and from level to 1/4 bubble tilt to the outdoors. The condensate disposal system in the unit is designed to dissipate the condensate water generated during cooling operation in accordance with ARI standards and actually uses this water for maximum unit efficiency. A level unit will also insure proper performance of the Internal Condensate Removal (ICR) system optional on heat pump units.

2.The wall case should be secured to the wall at both sides. Use a minimum of two screws or other fastening device on each side. See Figure 2 page 26. Mark the wall case on each side 2" from the bottom and 2" from the top at a point where basic wall structure is located. Drill wall case and use fasteners appropriate for wall construction. All holes for fasteners in the side of the wall case must be at least 2" up from the bottom of the wall case. Never locate screws or put other holes in the bottom of the wall case. The only exception is when an RAD10 drain kit is installed to connect to an internal drain system. See page 36 for RAD10 Drain Kit information.

If the wall opening is greater than the case dimensions, spacers must be used on the sides between the wall case and the wall support structure to prevent distorting the wall case.

3.Caulk or gasket the entire opening on the outside between the wall case and exterior wall surface (4 sides) to provide total water and air seal.

4.Caulk or gasket room-side opening between wall case and interior wall surface (4 sides). Opening beneath or around the wall case can allow outdoor air to leak into the room resulting in increased operating costs and improper room temperature control.

Care should be taken in location of electrical supply entry in relationship to wall sleeve to assure access to receptacle or junction box once unit is installed.

Refer to page 42 for maximum power cord length.

Permanent connected units close to finished floor must allow for conduit clearance.

Case Angles

In some installations such as curtain walls, window walls, or where the structural material of the wall is insufficient to support or fasten wall case to, the use of case angles may be used. Case angles are pieces of steel or other material of similar structural strength that are formed to a 90° angle, with holes to fasten the case angle to the wall case and to the structural component of the wall surrounding the wall case.

The following describes the procedure when field fabricated and installed case angles are applied.

1.Position case angles around top and sides of wall case at the desired location. Position case angles vertically on each side of wall case to provide a level installation.

2.Mark wall case through holes in case angles. The lowest hole on the sides of the wall case must be a minimum of 2" above the bottom of the case.

3.For RAB71 wall case drill 5/32" diameter holes at locations marked on wall case in Step 2, and assemble angles to wall case using #10 x 1/2" self tapping screws. For RAB77 wall case follow the same procedure except use a #10 x 1/2" bolt, washer and nut to attach case angles to case. Install screws or bolts from outside wall case.

4.Do not drill any holes in bottom of wall case. Do not distort wall case.

5.Do not use case angles for a lintel.

25

Image 25
Contents Architects and Engineers Design Data Manual Quick Reference Series Heat Pump with Backup Resistance Heat3500 Series Control Panel Series Cooling with Electric HeatEER COP Series Control PanelNewest Innovation from GE Cooling With Resistance HeatImportant Notice Table of ContentsIntroduction Components of the Zoneline System Optional Accessories of the Zoneline SystemDeluxe Series shown UPC Zoneline Features Model SeriesFeatures and Benefits Fan Cycle Switch SmartFan Fan Only Setting HIGH/LOWCompressor Restart Delay Electronic Temperature LimitingUp-Front Air Filters Easy Clean Air Discharge AreaConcealed Manual Vent Control Corrosion Protection OptionalCooling Temperature Limits Auxiliary Control SwitchesHeating Temperature Limits 3500 SeriesDiagnos SeriesCentral Desk Control Resistance Heat Models Remote Thermostat ControlHeat Pump Models RAK806 Universal Control Cover LabelSee RAK806 Universal Control cover Label on Feature SeriesRemote Control Low Voltage Wiring For Use With Mechanical 4-Wire Systems OnlyR1, R2, and R3 Special order, 100 piece minimum orderBalance Point Heat Pumps and Energy SavingsHeat pump condensate Heat Pump Operation Zoneline 5500 Series Heat pump defrost Zoneline 5500 SeriesZoneline 5500 Series Heat Source Logic Air Distribution Application CommentsRecommendation High Wall Mount For unitsDimensions Sub-Base Wall CaseRAK204 Window, Curtain and Panel Wall Construction Wall Case Installation DataGeneral Masonry Wall Construction Installation of Wall Case in Wall OpeningBrick, Frame, Stucco and Shingle Construction Preparation of the Wall Case for All Types of ConstructionFastening Wall Case Framing for Wall CaseRoom Cabinet Wall Section Detailed Side ViewWall Case Room Wall Case CabinetCabinet Wall Case RoomWall Case Receptacle By OthersCaulk Wall Case Installation Cord SET ConnectedCorner and lap joints be additionally sealed Page Holes by Installer Recommend 2 to Adjustable CaulkShown with Access Covers Removed Alternates Small TOP ViewChaseway Option RAK204 Series SUB-BASE Installation and Electrical DataType B Screw Green Ground Metal Case Screw Clip Type D Type a To Secure Side ChannelsCooling Condensate Condensate Disposal SystemsWall Case with RAD10 Drain KIT Typical InstallationRear Grille Wall Case Room CabinetGasket Cabinet Bottom Tube Cover Plate NUT Molded Case RAB77 only DetailUSE Type a Screws for Both RAB71 and RAB77 New Ducted Installations Ducted InstallationsReplacements of Existing Ducted Units Ducted Application ConsiderationsDuct Adapter Extension has 1/2 Insulation Ducted Application AZ2500/3500 SeriesDucted Detailed Side Views AZ2500/3500 Series Sub-Base InstallationSample Calculations Exterior Grilles230/208 Volt Unit Installation Line Cord Connected Units Power Connection For Deluxe Series 2500230/208 Volt Unit Installation Permanent Connected Units 265 or 277 Volt Unit Installation Permanent Connected Units230/208 Volt Installations Power Connection Kits For Premium SeriesReplacement of Existing Chassis Maximum Connected Load For Deluxe Series 2500 Heat Pump Performance Data Cooling Performance DataLatent System Capacity Normal Yearly Operating Data Formula for Calculating Operating Costs Using Above DataTypical 2500 Series Schematic Diagram Typical 2500 Series Wiring DiagramDrive Board Unit Typical 3500 Series Schematic Diagram Typical 3500 Series Wiring DiagramBoard Unit Typical 5500 Series Schematic Diagram Typical 5500 Series Wiring DiagramSuggested Bid Form Specifications Page Alternate specification for molded wall case Deluxe Line Dry Air 25 & 3500 Series Receptacles/Sub-Bases Kit Number Description For Additional Information Refer to Complete Accessory ListElectrical Wiring Installation General Installation SuggestionsReplacement Installations New InstallationsCategory Alphabetical IndexZoneline

5500 specifications

The GE 5500 is a sophisticated gas turbine that represents a benchmark in the realm of power generation technology. Known for its impressive performance and efficiency, the GE 5500 has garnered attention in various industries, particularly in energy production. Designed for combined-cycle applications, this turbine effectively leverages both gas and steam cycles to optimize electricity generation.

One of the standout features of the GE 5500 is its advanced aerodynamics, which enhance the efficiency of the combustion process. The turbine employs state-of-the-art combustion technology that allows for high operational flexibility and minimizes emissions, meeting stringent environmental standards. This is particularly important in today’s energy landscape, where sustainability is a crucial focus.

The GE 5500 is equipped with a robust control system that utilizes digital twin technology. This innovative approach allows operators to simulate and analyze the performance of the turbine virtually, leading to improved operational efficiency and reduced downtime. Additionally, this turbine features an integrated health monitoring system that provides real-time data on performance metrics, allowing for predictive maintenance and enhancing overall reliability.

The materials used in the construction of the GE 5500 are engineered to withstand high temperatures and stress levels, ensuring longevity and durability. This includes high-performance alloys that maintain structural integrity even under extreme operating conditions.

Installation and maintenance of the GE 5500 are streamlined through its modular design, which simplifies access to components and reduces service time. This efficiency translates into lower operational costs, making the GE 5500 an economically favorable choice for utilities and independent power producers.

Furthermore, the GE 5500 can be integrated into a variety of power plant configurations, whether for peaking power or baseload operations, which adds to its versatility. Its ability to quickly ramp up production makes it particularly valuable in an energy market characterized by fluctuating demand.

Overall, the GE 5500 gas turbine is a remarkable engineering feat that combines cutting-edge technology with practical design. Its efficiency, reliability, and adaptability position it as a leading choice for power generation needs, meeting the requirements of modern energy systems while contributing to a more sustainable future.