Rinnai Comprehensive Manual for RL94I Water Heater

Page 20

Water Piping

Isolation Valves and Pressure Relief Valve (RL75i and RL94i)

The isolation valves provide the ability to isolate the water heater from the structure’s plumbing and allow quick access to flush the heat exchanger. Check with local codes to determine if a pressure and temperature relief valve is required. The included valves meet American National Standard (ANSI Z21.10.3) / Canadian Standard (CSA 4.3) and are ANSI/NSF 61 approved for potable water.

Isolation Valve (Cold)

107000081

 

 

Isolation Valve (Hot)

107000083

 

 

Pressure Relief Valve (PRV)

107000085

 

 

Isolation Valves Installation Instructions:

1.Wrap the ends of the threaded water inlet & outlet on the tankless water heater,as well as the threaded end of the approved pressure relief valve with a minimum of 5 wraps of Teflon® tape.

2.Screw the pressure relief valve into the 3/4” threads opposite the wing handle on the HOT water service valve. (RED drain handle) (see Pressure Relief Valve Section for proper installation requirements)

3.Loosen the 3/4” union nut on the HOT water valve and connect to the HOT water outlet on the tankless water heater. If nut is removed, ensure that you realign the tailpiece accurately to the valve and that the black washer is positioned such that the raised metal edge of the valve is inside the washer.

4.Align the direction of the HOT water drain to the desired position.

5.Tighten the union assembly to the HOT water valve using approximately 15 foot lbs of torque.

6.Repeat steps 3-5 for the COLD water valve. (BLUE drain handle) for connection to the COLD water inlet on the tankless water heater.

7.Connect the INLET on the COLD water valve to the MAIN SOURCE of the water supply.

8.Connect the OUTLET on the HOT water valve to the HOT WATER plumbing system.

9.Ensure that both drain valve lever handles are in the closed position (perpendicular to the drain portion of the body).

Pressure Relief Valve Installation Instructions:

The PRV must be connected by the threaded connection opposite the wing handle on the hot water valve (designated by the RED drain handle) or the threaded connection on the side of the relocation fitting above the hot water valve. Installation must maintain a ¾” port size with no shut off valve or line restriction in-between the appliance and the PRV. The discharge line from the PRV should pitch downward and terminate 6” above drains where discharge will be clearly visible. The discharge end of the line shall be plain (unthreaded) and a minimum of ¾” in diameter. The discharge line material must be suitable for water at least 180º Fahrenheit and can be no more than 30 feet in length and contain no more than 4 elbows or bends. No valve of any type may be installed in the discharge line of the pressure relief valve.

Pressure Relief Valve Maintenance:

For proper care of this approved pressure relief valve, it is recommended that the valve is manually operated once a year. In doing so, it will be necessary to

take precautions with regard to the discharge of potentially scalding hot water under pressure. Ensure discharge has a place to flow. Contact with your body or other property may cause damage or harm. Please note that only the PRV in this package is certified by CSA International as an approved item.

20

VB Series Indoor LS Manual

Image 20
Contents REU-VB2528FFUD-US Table of Contents Specifications RL75i RL94i R98LSiConsumer Safety Information Safety DefinitionsSafety Behaviors and Practices Safety Features Description of OperationTemperature Controller MC-91-1US & MCC-91-1USFeatures Available on Temperature Controllers FeaturesOperating Instructions MC-91 MCC-91 MC-100 BC-100 MC-502 DescriptionModel Temperature Settings Available ºF How to Set the TemperatureTemperature Controller Settings Temperature Options Without a Temperature Controller Setting the Sound Volume Voice PromptRe-setting the Maximum Temperature RL75 and RL94 only MCC-91 Temperature ControllerOverview Using the Water Smart / Bath Fill FunctionSetting the Water Volume Setting Controller to Mute Setting the ClockFilling the Tub Models MC-91 and MCC-91Maintenance Error Codes Code Fault RemedyCode Water Quality Trouble Shooting for Common IssuesAccessing Operating Information Flushing the Heat Exchanger Error Code LC or Circulating PumpInstallation Instructions General InstructionsClearances from Appliance Attachment of the Water HeaterGeneral Instructions Electrical ConnectionGas Piping Pipe Sizing Procedure Example Isolation Valves Installation Instructions Pressure Relief Valve Installation InstructionsPressure Relief Valve Maintenance Water PipingFreeze Protection Piping RequirementsPressure Relief Valve Requirements Manual draining of the water heater When the water heater or external piping has frozenFreeze Protection Freeze Protection Piping KEYRecommended Piping for Basic Installation Rinnai Water HeaterRecommended Piping for Circulation Systems For this applicationCondensate Venting InstructionsIntake / Exhaust Guidelines Maximum Vent Length Vent Products Manufacturer Product PartsDescription Canadian Installations US Installations Flue Terminal Clearances ANS Z21.10.3, CSAAdditional Clearances Vent Terminal Inside CornerFlue Installation Concentric Venting RL75i, RL94i Flue Installation R98LSi, R98LSi-ASME Air Intake AssemblyExhaust Pipe Assembly Venting Clearances to CombustiblesHorizontal with Concentric Termination Vertical TerminationsConnecting Multiple Water Heaters High Altitude InstallationsNumber Connected Accessories Necessary Water Heaters GuidelinesCanada only Temperature Controller Installation ConfigurationsLocation Cable Lengths and SizeMounting the Controller Outline of RemoteFor Your Safety Read Before Operating Operating InstructionsOutlet Flow Data Technical DataPressure Drop Curve Temperature Setting ReplacementSpace Heating PumpsDimensions RL75i, RL94i R98LSi, R98LSi-ASMELadder Diagram for RL75i and RL94i Ladder Diagram for R98LSi and R98LSi-ASME HOTConsumer Support Warranty InformationLimited Warranty What will Rinnai do? State Regulations Important In the State of Massachusetts 248 CMR 4.00Instructions d’installation Instructions dutilisationInstructions dutilisation Temp. d’eauModel Plages de température disponible ºF Plages de température avec un contrôleur de températureOptions de température sans contrôleur à distance Entretien NettoyageInstructions générales Écartements par rapport à lappareil Fixation du chauffe-eauInstructions générales Installation à altitude élevéeTuyauterie de gaz Tuyauterie deau Valve à Bille / Valve de dégagement de pression RL75i, RL94iQualité de leau Soupape de sûretéTuyauterie recommandée pour installation de base LégendeCondensat Instructions de ventilationConsignes pour aspiration/évacuation Longueur maximum de ventilation 12.5 m 10.7 mHorizontale Produits de ventilationConstructeur Produit Pièces Espacements pour terminaison de cheminée ANS Z21.10.3, CSA Nest PAS PermiseInstallation de conduit de cheminée RL75i, RL94i Installation de conduit de cheminée R98LSi, R98LSi-ASME Ensemble de prise dairMontage du tuyau dévacuation Terminaisons horizontalesTerminaison horizontale concentrique Terminaisons verticalesInstructions dutilisation VanneMa ualmanuelleValveDiagramme en escalier RL75i, RL94i PhaseDiagramme en escalier R98LSi, R98LSiASME Phase TRE NEU RALSupport à la clientèle Informations sur la garantieQuest-ce qui est couvert ? Combien de temps dure la couverture ?Que fait Rinnai pour exercer la garantie ? VB Series Indoor LS Manual VB Series Indoor LS Manual VB Series Indoor LS Manual VB2528FFU VB2735FFU VA3237FFU