Rinnai RL94I, RL75I installation manual Diagramme en escalier R98LSi, R98LSiASME, Phase TRE NEU RAL

Page 66

Diagramme en escalier (R98LSi, R98LSiASME)

PHASE

TRE

 

NEU RAL

CONTACT DE

FROST SENSING

3A(FUSE)ADÉTECTION DE GEL SWITCH

ANTI-FOUDRE

 

 

ANTI-FOUDRE

 

 

 

VARISTOR

VARISTOR

 

 

 

 

 

TERRE

RELAIS 1

 

ALLUMAGE

 

IG

 

 

 

 

ALIMENTATION À

 

 

DÉCOUPAGE

 

PG

170 V CC

12 V CC

E

D

12,6 V

5 V CC

40 V CC

 

 

A

B

C

SG

DÉTECTEUR

A

 

 

B

 

WATERFLOW

 

 

 

D'ÉCOULEMENT

 

 

 

 

SENSOR

CIRCUIT

 

 

 

QS

 

 

 

DÉTECTEUR D'É-

 

 

 

 

COULEMENT

 

 

 

DISPOSITIF DE

A

 

 

 

 

WATERFLOW

SG

 

 

 

CONTRÔLE D'É-

 

 

 

COULEMENTCONTROLDEVICE

CIRCUIT DISPOSITIF

 

 

 

M

 

 

 

DE CONTRÔLE

 

 

 

 

D'ÉCOULEMENT

 

CPU

 

CIRCUIT DE CONTRÔLE

A

SG

 

 

BY-PASSFLOW

 

UNITÉ

 

D'ÉCOULEMENT DE

 

 

DÉRIVATIONCONTROLDEVICE

 

 

 

CENTRAL

 

 

DISPOSITIF DE

 

CENTRALE

 

 

 

PROCESSING

 

M

CONTRÔLE DÉ-

 

UNITDE

 

COULEMENT DE

 

TRAITEMENT

 

 

 

 

 

MODÈLE DE DÉVIATION SEULEMENT

SG

 

 

 

A

RELAIS 1

CIRCUITRELAY

DE

 

 

COMMANDEDRIVING

 

 

 

 

DE RELAIS

 

 

 

SV0

CIRCUIT

 

 

FUS THER.

CIRCUIT DE

 

 

 

 

 

 

 

SOLENOIDCOMMANDE

 

 

INTERRUPTEUR

SV1

DRIVINGD'ÉLECTRO-

 

 

OVERHEAT

 

CIRCUITVANNE

 

 

DE SURCHAUF-

SV2

 

 

 

 

SWITCH

 

 

 

 

FE

 

 

 

 

 

 

SV3

 

 

 

 

OUTGOINGTHERMISTANCEWATERDE

B

SG

 

 

THERMISTOR

 

 

 

 

 

SORTIE D'EAU

 

 

 

 

THERMISTANCEHEAT EXCHANGERD'ÉCHA-

CIRCUIT DE

 

 

 

THERMISTOR

 

 

 

 

GEUR THERMIQUE

THERMISTOR

 

 

 

 

THERMISTANCE

 

 

AIR TEMPERATURE

CIRCUIT

 

 

 

THERMISTANCE DE

 

 

 

 

THERMISTOR

 

 

 

 

 

TEMPÉRATURE D'AIR

 

 

SG

 

 

 

 

 

 

A B C

CIRCUITD'ALIMENTA-

TIOND'ÉLECTRO-

VANNEÀ

MODULATION

SG

D E

CIRCUIT DE

COMMANDE DE VENTILATEUR

PG

A

FLAMECIRCUIT DE DÉTECTIONDETECTING

CIRCUITFLAMME

SG

TERRE

A B

REMOTECIRCUIT DE CONTRÔLEUR À

CONTROLLER

DISTANCE

CIRCUIT

SG

MODULATINGÉLECTRO-

VANNE À

SOLENOID

MODULATION

VALVE

POV

VEBTILATEUR DE

COMBUSTION

COMBUSTION

FAN

VENTI-

LATEURFAN

FLAME ROD

ÉLECTRODE DE FLAMME

CONTRÔLEURREMOTE À

CONTROLLERDISTANCE

MODÈLE D'INTÉRIEUR UNIQUEMENT

SG

 

66

Manuel – Chauffe-eau d’intérieur série VB LS

Image 66
Contents REU-VB2528FFUD-US Table of Contents Specifications RL75i RL94i R98LSiSafety Behaviors and Practices Safety Features Consumer Safety InformationSafety Definitions Description of OperationTemperature Controller MC-91-1US & MCC-91-1USOperating Instructions Features Available on Temperature ControllersFeatures MC-91 MCC-91 MC-100 BC-100 MC-502 DescriptionHow to Set the Temperature Temperature Controller SettingsModel Temperature Settings Available ºF Re-setting the Maximum Temperature RL75 and RL94 only Temperature Options Without a Temperature ControllerSetting the Sound Volume Voice Prompt MCC-91 Temperature ControllerUsing the Water Smart / Bath Fill Function Setting the Water VolumeOverview Filling the Tub Setting Controller to MuteSetting the Clock Models MC-91 and MCC-91Maintenance Error Codes Code Fault RemedyCode Trouble Shooting for Common Issues Accessing Operating InformationWater Quality Flushing the Heat Exchanger Error Code LC or Circulating PumpInstallation Instructions General InstructionsClearances from Appliance Attachment of the Water HeaterElectrical Connection Gas PipingGeneral Instructions Pipe Sizing Procedure Example Pressure Relief Valve Maintenance Isolation Valves Installation InstructionsPressure Relief Valve Installation Instructions Water PipingPiping Requirements Pressure Relief Valve RequirementsFreeze Protection When the water heater or external piping has frozen Freeze ProtectionManual draining of the water heater Freeze Protection Piping KEYRecommended Piping for Basic Installation Rinnai Water HeaterRecommended Piping for Circulation Systems For this applicationVenting Instructions Intake / Exhaust GuidelinesCondensate Maximum Vent Length Vent Products Manufacturer Product PartsDescription Canadian Installations US Installations Flue Terminal Clearances ANS Z21.10.3, CSAAdditional Clearances Vent Terminal Inside CornerFlue Installation Concentric Venting RL75i, RL94i Exhaust Pipe Assembly Flue Installation R98LSi, R98LSi-ASMEAir Intake Assembly Venting Clearances to CombustiblesHorizontal with Concentric Termination Vertical TerminationsNumber Connected Accessories Necessary Water Heaters Connecting Multiple Water HeatersHigh Altitude Installations GuidelinesCanada only Location Temperature Controller InstallationConfigurations Cable Lengths and SizeMounting the Controller Outline of RemoteFor Your Safety Read Before Operating Operating InstructionsTechnical Data Pressure Drop CurveOutlet Flow Data Space Heating Temperature SettingReplacement PumpsDimensions RL75i, RL94i R98LSi, R98LSi-ASMELadder Diagram for RL75i and RL94i Ladder Diagram for R98LSi and R98LSi-ASME HOTWarranty Information Limited WarrantyConsumer Support What will Rinnai do? State Regulations Important In the State of Massachusetts 248 CMR 4.00Instructions d’installation Instructions dutilisationInstructions dutilisation Temp. d’eauPlages de température avec un contrôleur de température Options de température sans contrôleur à distanceModel Plages de température disponible ºF Entretien NettoyageInstructions générales Écartements par rapport à lappareil Fixation du chauffe-eauInstallation à altitude élevée Tuyauterie de gazInstructions générales Tuyauterie deau Valve à Bille / Valve de dégagement de pression RL75i, RL94iQualité de leau Soupape de sûretéTuyauterie recommandée pour installation de base LégendeInstructions de ventilation Consignes pour aspiration/évacuationCondensat Longueur maximum de ventilation 12.5 m 10.7 mProduits de ventilation Constructeur Produit PiècesHorizontale Espacements pour terminaison de cheminée ANS Z21.10.3, CSA Nest PAS PermiseInstallation de conduit de cheminée RL75i, RL94i Montage du tuyau dévacuation Installation de conduit de cheminée R98LSi, R98LSi-ASMEEnsemble de prise dair Terminaisons horizontalesTerminaison horizontale concentrique Terminaisons verticalesInstructions dutilisation VanneMa ualmanuelleValveDiagramme en escalier RL75i, RL94i PhaseDiagramme en escalier R98LSi, R98LSiASME Phase TRE NEU RALQuest-ce qui est couvert ? Support à la clientèleInformations sur la garantie Combien de temps dure la couverture ?Que fait Rinnai pour exercer la garantie ? VB Series Indoor LS Manual VB Series Indoor LS Manual VB Series Indoor LS Manual VB2528FFU VB2735FFU VA3237FFU