Rinnai RL94I, RL75I Écartements par rapport à lappareil, Fixation du chauffe-eau

Page 52

Écartements par rapport à l'appareil

 

Jusqu'à matières

Jusqu'à

 

 

 

 

 

matières

 

 

 

 

 

combustibles

 

 

 

 

 

non-combustibles

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RL75i

R98LSi

RL75i

R98LSi

 

 

 

 

 

 

 

 

 

 

RL94i

RL94i

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Dessus du

6 pouces **

12 pouces

2 pouces**

2 pouces

 

 

 

 

chauffe-eau

(152 mm)

(305 mm)

(51 mm)

(51 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

Arrière du

0 (zero)

0 (zero)

0 (zero)

0 (zero)

 

Sur le côté

 

 

to side

 

 

chauffe-eau

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Avant du

6 pouces

6 pouces

6 pouces

6 pouces

 

 

 

 

chauffe-eau

(152 mm)

(152 mm)

(152 mm)

(152 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

Côtés du

2 pouces

2 pouces

1/2 pouce

1/2 pouce

 

 

 

 

chauffe-eau

(51 mm)

(51 mm)

(13 mm)

(13 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Par rapport

12 pouces

12 pouces

12 pouces

2 pouces

 

 

 

 

au plancher/

(305 mm)

(305 mm)

(305 mm)

(51 mm)

 

 

 

 

sol

 

 

 

 

 

to floor/groundVers le sol

Ventilation

0 (zero)

4 pouces*

0 (zero)

0 (zero)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Vers le haut to top

Verstol'avantfront

*4 pouces (102 mm) pour zone confinée ; 1 pouce (26 mm) pour zone ouverte.

**0 pouces des composants de ventilation et de la canalisation de vidange condensat. L'espacement pour des interventions doit faire 24 pouces (610 mm) sur l'avant du chauffe-eau. Pour installation en placard : espacement de 6 pouces (152 mm) à l'avant.

Fixation du chauffe-eau

1.Identifiez l'emplacement d'installation et confirmez que là les espacements requis seront respectés.

2.Fixez bien le chauffe-eau au mur en utilisant n'importe lesquels des trous des supports d'installation murale placés en haut et en bas du chauffe-eau. Assurez-vous que la résistance des fixations est suffisante pour supporter le poids de l'appareil. Reportez-vous au poids des modèles de chauffe-eau dans la section des spécifications.

Supports

d'installation

murale

52

Manuel – Chauffe-eau d’intérieur série VB LS

Image 52
Contents REU-VB2528FFUD-US Table of Contents Specifications RL75i RL94i R98LSiConsumer Safety Information Safety DefinitionsSafety Behaviors and Practices Safety Features Description of OperationTemperature Controller MC-91-1US & MCC-91-1USFeatures Available on Temperature Controllers FeaturesOperating Instructions MC-91 MCC-91 MC-100 BC-100 MC-502 DescriptionTemperature Controller Settings How to Set the TemperatureModel Temperature Settings Available ºF Temperature Options Without a Temperature Controller Setting the Sound Volume Voice PromptRe-setting the Maximum Temperature RL75 and RL94 only MCC-91 Temperature ControllerSetting the Water Volume Using the Water Smart / Bath Fill FunctionOverview Setting Controller to Mute Setting the ClockFilling the Tub Models MC-91 and MCC-91Maintenance Error Codes Code Fault RemedyCode Accessing Operating Information Trouble Shooting for Common IssuesWater Quality Flushing the Heat Exchanger Error Code LC or Circulating PumpInstallation Instructions General InstructionsClearances from Appliance Attachment of the Water HeaterGas Piping Electrical ConnectionGeneral Instructions Pipe Sizing Procedure Example Isolation Valves Installation Instructions Pressure Relief Valve Installation InstructionsPressure Relief Valve Maintenance Water PipingPressure Relief Valve Requirements Piping RequirementsFreeze Protection Freeze Protection When the water heater or external piping has frozenManual draining of the water heater Freeze Protection Piping KEYRecommended Piping for Basic Installation Rinnai Water HeaterRecommended Piping for Circulation Systems For this applicationIntake / Exhaust Guidelines Venting InstructionsCondensate Maximum Vent Length Vent Products Manufacturer Product PartsDescription Canadian Installations US Installations Flue Terminal Clearances ANS Z21.10.3, CSAAdditional Clearances Vent Terminal Inside CornerFlue Installation Concentric Venting RL75i, RL94i Flue Installation R98LSi, R98LSi-ASME Air Intake AssemblyExhaust Pipe Assembly Venting Clearances to CombustiblesHorizontal with Concentric Termination Vertical TerminationsConnecting Multiple Water Heaters High Altitude InstallationsNumber Connected Accessories Necessary Water Heaters GuidelinesCanada only Temperature Controller Installation ConfigurationsLocation Cable Lengths and SizeMounting the Controller Outline of RemoteFor Your Safety Read Before Operating Operating InstructionsPressure Drop Curve Technical DataOutlet Flow Data Temperature Setting ReplacementSpace Heating PumpsDimensions RL75i, RL94i R98LSi, R98LSi-ASMELadder Diagram for RL75i and RL94i Ladder Diagram for R98LSi and R98LSi-ASME HOTLimited Warranty Warranty InformationConsumer Support What will Rinnai do? State Regulations Important In the State of Massachusetts 248 CMR 4.00Instructions d’installation Instructions dutilisationInstructions dutilisation Temp. d’eauOptions de température sans contrôleur à distance Plages de température avec un contrôleur de températureModel Plages de température disponible ºF Entretien NettoyageInstructions générales Écartements par rapport à lappareil Fixation du chauffe-eauTuyauterie de gaz Installation à altitude élevéeInstructions générales Tuyauterie deau Valve à Bille / Valve de dégagement de pression RL75i, RL94iQualité de leau Soupape de sûretéTuyauterie recommandée pour installation de base LégendeConsignes pour aspiration/évacuation Instructions de ventilationCondensat Longueur maximum de ventilation 12.5 m 10.7 mConstructeur Produit Pièces Produits de ventilationHorizontale Espacements pour terminaison de cheminée ANS Z21.10.3, CSA Nest PAS PermiseInstallation de conduit de cheminée RL75i, RL94i Installation de conduit de cheminée R98LSi, R98LSi-ASME Ensemble de prise dairMontage du tuyau dévacuation Terminaisons horizontalesTerminaison horizontale concentrique Terminaisons verticalesInstructions dutilisation VanneMa ualmanuelleValveDiagramme en escalier RL75i, RL94i PhaseDiagramme en escalier R98LSi, R98LSiASME Phase TRE NEU RALSupport à la clientèle Informations sur la garantieQuest-ce qui est couvert ? Combien de temps dure la couverture ?Que fait Rinnai pour exercer la garantie ? VB Series Indoor LS Manual VB Series Indoor LS Manual VB Series Indoor LS Manual VB2528FFU VB2735FFU VA3237FFU