Rinnai RL75I Using the Water Smart / Bath Fill Function, Overview, Setting the Water Volume

Page 9

Using the Water Smart / Bath Fill Function

Overview

This function is exclusive to the BC-100V temperature controller. The bath fill function allows the consumer to fill a tub with a preset volume of water at a preset temperature. This is done by pressing the bath fill button on the BC-100V controller while no hot water is flowing and then opening only the hot water tap. The water heater will stop the hot water flow when the preset volume has been reached. The hot water tap should then be closed and the bath fill button pressed.

The temperature settings for the bath fill function are limited to those in the table below.

Bath Fill Temperature Settings

Available

ºF 98 100 102 104 106 108

ºC 37 38 39 40 41 42

ºF 110 112 114 116 118 120

ºC 43 44 46 47 48 49

Setting the Water Volume

The default volume is set to 25 gallons. The volume can be set between 10 and 120 gallons.

1. Press the “Priority” button on the temperature controller. The green Priority light will glow indicating that this controller is controlling the temperature and that the Rinnai water heater is ready to supply hot water.

2. Press the “Water Smart Bath Fill” button to set the water volume and temperature.

3. Press the “Temp” ▲ or ▼ buttons to obtain the desired temperature setting.

4.Press the “Water Vol.”▲ or ▼ buttons to obtain the desired water volume in gallons.

5.Press the “Water Smart Bath Fill” button.

VB Series Indoor LS Manual

9

Image 9
Contents REU-VB2528FFUD-US Table of Contents RL75i RL94i R98LSi SpecificationsSafety Definitions Consumer Safety InformationSafety Behaviors and Practices Safety Features Description of OperationMC-91-1US & MCC-91-1US Temperature ControllerFeatures Features Available on Temperature ControllersOperating Instructions MC-91 MCC-91 MC-100 BC-100 MC-502 DescriptionHow to Set the Temperature Temperature Controller SettingsModel Temperature Settings Available ºF Setting the Sound Volume Voice Prompt Temperature Options Without a Temperature ControllerRe-setting the Maximum Temperature RL75 and RL94 only MCC-91 Temperature ControllerUsing the Water Smart / Bath Fill Function Setting the Water VolumeOverview Setting the Clock Setting Controller to MuteFilling the Tub Models MC-91 and MCC-91Maintenance Code Fault Remedy Error CodesCode Trouble Shooting for Common Issues Accessing Operating InformationWater Quality Circulating Pump Flushing the Heat Exchanger Error Code LC orGeneral Instructions Installation InstructionsAttachment of the Water Heater Clearances from ApplianceElectrical Connection Gas PipingGeneral Instructions Pipe Sizing Procedure Example Pressure Relief Valve Installation Instructions Isolation Valves Installation InstructionsPressure Relief Valve Maintenance Water PipingPiping Requirements Pressure Relief Valve RequirementsFreeze Protection When the water heater or external piping has frozen Freeze ProtectionManual draining of the water heater KEY Freeze Protection PipingRinnai Water Heater Recommended Piping for Basic InstallationFor this application Recommended Piping for Circulation SystemsVenting Instructions Intake / Exhaust GuidelinesCondensate Maximum Vent Length Manufacturer Product Parts Vent ProductsFlue Terminal Clearances ANS Z21.10.3, CSA Description Canadian Installations US InstallationsInside Corner Additional Clearances Vent TerminalFlue Installation Concentric Venting RL75i, RL94i Air Intake Assembly Flue Installation R98LSi, R98LSi-ASMEExhaust Pipe Assembly Venting Clearances to CombustiblesVertical Terminations Horizontal with Concentric TerminationHigh Altitude Installations Connecting Multiple Water HeatersNumber Connected Accessories Necessary Water Heaters GuidelinesCanada only Configurations Temperature Controller InstallationLocation Cable Lengths and SizeOutline of Remote Mounting the ControllerOperating Instructions For Your Safety Read Before OperatingTechnical Data Pressure Drop CurveOutlet Flow Data Replacement Temperature SettingSpace Heating PumpsRL75i, RL94i R98LSi, R98LSi-ASME DimensionsLadder Diagram for RL75i and RL94i HOT Ladder Diagram for R98LSi and R98LSi-ASMEWarranty Information Limited WarrantyConsumer Support What will Rinnai do? Important In the State of Massachusetts 248 CMR 4.00 State RegulationsInstructions dutilisation Instructions d’installationTemp. d’eau Instructions dutilisationPlages de température avec un contrôleur de température Options de température sans contrôleur à distanceModel Plages de température disponible ºF Nettoyage EntretienInstructions générales Fixation du chauffe-eau Écartements par rapport à lappareilInstallation à altitude élevée Tuyauterie de gazInstructions générales Valve à Bille / Valve de dégagement de pression RL75i, RL94i Tuyauterie deauSoupape de sûreté Qualité de leauLégende Tuyauterie recommandée pour installation de baseInstructions de ventilation Consignes pour aspiration/évacuationCondensat 12.5 m 10.7 m Longueur maximum de ventilationProduits de ventilation Constructeur Produit PiècesHorizontale Nest PAS Permise Espacements pour terminaison de cheminée ANS Z21.10.3, CSAInstallation de conduit de cheminée RL75i, RL94i Ensemble de prise dair Installation de conduit de cheminée R98LSi, R98LSi-ASMEMontage du tuyau dévacuation Terminaisons horizontalesTerminaisons verticales Terminaison horizontale concentriqueVanneMa ualmanuelleValve Instructions dutilisationPhase Diagramme en escalier RL75i, RL94iPhase TRE NEU RAL Diagramme en escalier R98LSi, R98LSiASMEInformations sur la garantie Support à la clientèleQuest-ce qui est couvert ? Combien de temps dure la couverture ?Que fait Rinnai pour exercer la garantie ? VB Series Indoor LS Manual VB Series Indoor LS Manual VB Series Indoor LS Manual VB2528FFU VB2735FFU VA3237FFU