NOTICE BEFORE INSTALLATION

Rinnai direct-vent appliance must be installed by a state qualified or licensed contractor and a properly trained Rinnai Installer. If you are not properly trained, you must not install this unit.

IMPORTANT: In the State of Massachusetts (248 CMR 4.00 & 5.00)

For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:

1.INSTALLATION OF CARBON MONOXIDE DETECTORS. At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors

a.In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent floor level.

b.In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.

2.APPROVED CARBON MONOXIDE DETECTORS. Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.

3.SIGNAGE. A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half (1/2) inch in size, "GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL

OBSTRUCTIONS".

4.INSPECTION. The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a)1 through 4.

46

VB Series Indoor LS Manual

Image 46
Contents REU-VB2528FFUD-US Table of Contents Specifications RL75i RL94i R98LSiSafety Behaviors and Practices Safety Features Consumer Safety InformationSafety Definitions Description of OperationTemperature Controller MC-91-1US & MCC-91-1USOperating Instructions Features Available on Temperature ControllersFeatures MC-91 MCC-91 MC-100 BC-100 MC-502 DescriptionTemperature Controller Settings How to Set the TemperatureModel Temperature Settings Available ºF Re-setting the Maximum Temperature RL75 and RL94 only Temperature Options Without a Temperature ControllerSetting the Sound Volume Voice Prompt MCC-91 Temperature ControllerSetting the Water Volume Using the Water Smart / Bath Fill FunctionOverview Filling the Tub Setting Controller to MuteSetting the Clock Models MC-91 and MCC-91Maintenance Error Codes Code Fault RemedyCode Accessing Operating Information Trouble Shooting for Common IssuesWater Quality Flushing the Heat Exchanger Error Code LC or Circulating PumpInstallation Instructions General InstructionsClearances from Appliance Attachment of the Water HeaterGas Piping Electrical ConnectionGeneral Instructions Pipe Sizing Procedure Example Pressure Relief Valve Maintenance Isolation Valves Installation InstructionsPressure Relief Valve Installation Instructions Water PipingPressure Relief Valve Requirements Piping RequirementsFreeze Protection Freeze Protection When the water heater or external piping has frozenManual draining of the water heater Freeze Protection Piping KEYRecommended Piping for Basic Installation Rinnai Water HeaterRecommended Piping for Circulation Systems For this applicationIntake / Exhaust Guidelines Venting InstructionsCondensate Maximum Vent Length Vent Products Manufacturer Product PartsDescription Canadian Installations US Installations Flue Terminal Clearances ANS Z21.10.3, CSAAdditional Clearances Vent Terminal Inside CornerFlue Installation Concentric Venting RL75i, RL94i Exhaust Pipe Assembly Flue Installation R98LSi, R98LSi-ASMEAir Intake Assembly Venting Clearances to CombustiblesHorizontal with Concentric Termination Vertical TerminationsNumber Connected Accessories Necessary Water Heaters Connecting Multiple Water HeatersHigh Altitude Installations GuidelinesCanada only Location Temperature Controller InstallationConfigurations Cable Lengths and SizeMounting the Controller Outline of RemoteFor Your Safety Read Before Operating Operating InstructionsPressure Drop Curve Technical DataOutlet Flow Data Space Heating Temperature SettingReplacement PumpsDimensions RL75i, RL94i R98LSi, R98LSi-ASMELadder Diagram for RL75i and RL94i Ladder Diagram for R98LSi and R98LSi-ASME HOTLimited Warranty Warranty InformationConsumer Support What will Rinnai do? State Regulations Important In the State of Massachusetts 248 CMR 4.00Instructions d’installation Instructions dutilisationInstructions dutilisation Temp. d’eauOptions de température sans contrôleur à distance Plages de température avec un contrôleur de températureModel Plages de température disponible ºF Entretien NettoyageInstructions générales Écartements par rapport à lappareil Fixation du chauffe-eauTuyauterie de gaz Installation à altitude élevéeInstructions générales Tuyauterie deau Valve à Bille / Valve de dégagement de pression RL75i, RL94iQualité de leau Soupape de sûretéTuyauterie recommandée pour installation de base LégendeConsignes pour aspiration/évacuation Instructions de ventilationCondensat Longueur maximum de ventilation 12.5 m 10.7 mConstructeur Produit Pièces Produits de ventilationHorizontale Espacements pour terminaison de cheminée ANS Z21.10.3, CSA Nest PAS PermiseInstallation de conduit de cheminée RL75i, RL94i Montage du tuyau dévacuation Installation de conduit de cheminée R98LSi, R98LSi-ASMEEnsemble de prise dair Terminaisons horizontalesTerminaison horizontale concentrique Terminaisons verticalesInstructions dutilisation VanneMa ualmanuelleValveDiagramme en escalier RL75i, RL94i PhaseDiagramme en escalier R98LSi, R98LSiASME Phase TRE NEU RALQuest-ce qui est couvert ? Support à la clientèleInformations sur la garantie Combien de temps dure la couverture ?Que fait Rinnai pour exercer la garantie ? VB Series Indoor LS Manual VB Series Indoor LS Manual VB Series Indoor LS Manual VB2528FFU VB2735FFU VA3237FFU