Rinnai RL75I, RL94I installation manual Canada only

Page 35

CANADA ONLY

Water Heater High Altitude Installation Setting Procedure

610 - 1372 m (2001 - 4500 ft) for Canada Only / Procédure Reglage de Chaffeau á' Haute Altitude 610 - 1372 m (2001 - 4500 ft) pour Canada Seulement

All settings/adjustments must be performed by a qualified Service Technician / Tous reglages/ajustements doivent être exécutés par un Technicien d'entretien qualifié.

1.Turn off the power source and gas supply to the water heater / Coupez l`alimentation de gaz et électrique.

2.Remove the front cover from the water heater/ Enlever la couverture de devant du chauffe-eau.

3.Set the switches 2 and 3 to the values shown in the table below for your altitude. The default setting for the appliance is 0-2000 ft (0-610 m) with switches No. 2 and No. 3 in the OFF posi- tion / Régler les micro-commutateurs 2 et 3 aux valeurs montrées dans la table au dessous pour votre altitude. Le reglage de défaut pour l'appareil est 0-2000 ft (0-610 m) avec les commu- tateurs No 2 et No 3 sur la position OFF.

4.Turn on the gas and power to the water heater / Ouvrez l`alimentatation de gaz et électrique.

5.Open a fixture or fixtures to flow water through the water heater at the maximum flow rate ob- tainable (at least three gallons per minute) / Ouvrir un accessoire ou accessoires pour couler de l'eau par le chauffe-eau au débit maximum procurable (au moins trois gallons par minute).

Switch

 

0-2000 ft

2001-4500 ft

micro-

(0-610 m)

(610-1372 m)

commutateur

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No 2

 

 

 

OFF

 

OFF

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No 3

 

 

 

OFF

 

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Switch No.

Switch No.

 

 

 

 

 

ON

 

 

 

 

 

ON

 

 

 

 

O

O

1

 

 

 

 

 

1

 

 

 

 

 

 

 

F

 

 

2

 

 

F

 

 

2

 

 

 

 

 

 

 

 

 

 

F

 

 

 

 

F

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

 

3

 

 

 

 

 

 

 

4

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

5

 

 

 

 

 

 

 

6

 

 

 

 

 

 

6

 

 

 

 

 

 

 

7

 

 

 

 

 

 

7

 

 

 

 

 

 

 

8

 

 

 

 

 

 

8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The conversion shall be carried out by a manufacturer’s authorized rep- resentative, in accordance with the requirements of the manufacturer, provincial or territorial authorities having jurisdiction and in accordance with the requirements of the CAN/ CGA-B149.1 or CAN/CGA-B149.2 Installation Codes / La conversion sera exécuté par un représentant du fabricant autorisé, conformément aux conditions du fabricant, les autorités provinciaux ou territoriaux ayant la juridiction et conformément aux con- ditions du CAN/CGA-B149.1 ou CAN/CGA-B149.2 Codes d'Installa- tion.

VB Series Indoor LS Manual

35

Image 35
Contents REU-VB2528FFUD-US Table of Contents RL75i RL94i R98LSi SpecificationsDescription of Operation Consumer Safety InformationSafety Definitions Safety Behaviors and Practices Safety FeaturesMC-91-1US & MCC-91-1US Temperature ControllerMC-91 MCC-91 MC-100 BC-100 MC-502 Description Features Available on Temperature ControllersFeatures Operating InstructionsModel Temperature Settings Available ºF How to Set the TemperatureTemperature Controller Settings MCC-91 Temperature Controller Temperature Options Without a Temperature ControllerSetting the Sound Volume Voice Prompt Re-setting the Maximum Temperature RL75 and RL94 onlyOverview Using the Water Smart / Bath Fill FunctionSetting the Water Volume Models MC-91 and MCC-91 Setting Controller to MuteSetting the Clock Filling the TubMaintenance Code Fault Remedy Error CodesCode Water Quality Trouble Shooting for Common IssuesAccessing Operating Information Circulating Pump Flushing the Heat Exchanger Error Code LC orGeneral Instructions Installation InstructionsAttachment of the Water Heater Clearances from ApplianceGeneral Instructions Electrical ConnectionGas Piping Pipe Sizing Procedure Example Water Piping Isolation Valves Installation InstructionsPressure Relief Valve Installation Instructions Pressure Relief Valve MaintenanceFreeze Protection Piping RequirementsPressure Relief Valve Requirements Manual draining of the water heater When the water heater or external piping has frozenFreeze Protection KEY Freeze Protection PipingRinnai Water Heater Recommended Piping for Basic InstallationFor this application Recommended Piping for Circulation SystemsCondensate Venting InstructionsIntake / Exhaust Guidelines Maximum Vent Length Manufacturer Product Parts Vent ProductsFlue Terminal Clearances ANS Z21.10.3, CSA Description Canadian Installations US InstallationsInside Corner Additional Clearances Vent TerminalFlue Installation Concentric Venting RL75i, RL94i Venting Clearances to Combustibles Flue Installation R98LSi, R98LSi-ASMEAir Intake Assembly Exhaust Pipe AssemblyVertical Terminations Horizontal with Concentric TerminationGuidelines Connecting Multiple Water HeatersHigh Altitude Installations Number Connected Accessories Necessary Water HeatersCanada only Cable Lengths and Size Temperature Controller InstallationConfigurations LocationOutline of Remote Mounting the ControllerOperating Instructions For Your Safety Read Before OperatingOutlet Flow Data Technical DataPressure Drop Curve Pumps Temperature SettingReplacement Space HeatingRL75i, RL94i R98LSi, R98LSi-ASME DimensionsLadder Diagram for RL75i and RL94i HOT Ladder Diagram for R98LSi and R98LSi-ASMEConsumer Support Warranty InformationLimited Warranty What will Rinnai do? Important In the State of Massachusetts 248 CMR 4.00 State RegulationsInstructions dutilisation Instructions d’installationTemp. d’eau Instructions dutilisationModel Plages de température disponible ºF Plages de température avec un contrôleur de températureOptions de température sans contrôleur à distance Nettoyage EntretienInstructions générales Fixation du chauffe-eau Écartements par rapport à lappareilInstructions générales Installation à altitude élevéeTuyauterie de gaz Valve à Bille / Valve de dégagement de pression RL75i, RL94i Tuyauterie deauSoupape de sûreté Qualité de leauLégende Tuyauterie recommandée pour installation de baseCondensat Instructions de ventilationConsignes pour aspiration/évacuation 12.5 m 10.7 m Longueur maximum de ventilationHorizontale Produits de ventilationConstructeur Produit Pièces Nest PAS Permise Espacements pour terminaison de cheminée ANS Z21.10.3, CSAInstallation de conduit de cheminée RL75i, RL94i Terminaisons horizontales Installation de conduit de cheminée R98LSi, R98LSi-ASMEEnsemble de prise dair Montage du tuyau dévacuationTerminaisons verticales Terminaison horizontale concentriqueVanneMa ualmanuelleValve Instructions dutilisationPhase Diagramme en escalier RL75i, RL94iPhase TRE NEU RAL Diagramme en escalier R98LSi, R98LSiASMECombien de temps dure la couverture ? Support à la clientèleInformations sur la garantie Quest-ce qui est couvert ?Que fait Rinnai pour exercer la garantie ? VB Series Indoor LS Manual VB Series Indoor LS Manual VB Series Indoor LS Manual VB2528FFU VB2735FFU VA3237FFU