Freeze Protection

Manual draining of the water heater

If the water heater is not going to be used during a period of possible freezing weather, it is recommended that the water inside the water heater be drained.

To manually drain the water:

1.

Shut off cold water supply and gas supply.

Hot water

2.

Turn off the temperature controller.

outlet

 

3.Disconnect the power to the water heater.

4.Open hot water drain plug at the hot water outlet.

5.Remove water filter to drain the cold water.

If an isolation kit is installed, remove the drain caps on both isolation valves and open both valves above the caps (blue and red valve handles).

To resume normal operation:

1.Confirm that all water drain plugs are removed, that the gas supply is turned off, and that all taps are closed.

2.Screw in the hot water drain plug.

3.Screw in the water filter in the cold water inlet.

If the isolation kit was used to drain the unit, replace the drain caps and close both isolation valves (blue and red valve handles).

4.Open the cold water supply.

5.Open a tap and confirm that water flows, and then close.

6.Turn on the power.

7.After confirming that the temperature controller is off, turn on the gas supply.

8.Turn on the temperature controller.

Hot water

Water

drain plug *

filter

Cold water inlet

*Use a wrench or other tool to unscrew the hot water drain plug.

Running a low volume of water through the water heater to prevent freezing

If the temperature exceeds the ability of the water heater to freeze protect itself, or if power is lost, the following steps may prevent the water heater and external piping from freezing. (Units connected with MSA or EZConnect should be drained to prevent freezing if not in use.)

1.Turn the water heater off.

2.Close the gas supply valve.

3.Reduce the flow to about 0.1 gal/min or to where the stream is about 0.2 inches thick.

ON! COLD

HOT

0.1gal/min or about 0.2 inch thick

When the water heater or external piping has frozen

1.Do not operate the water heater if it or the external piping is frozen.

2.Close the gas and water valves and turn off the power.

3.Wait until the water thaws. Check by opening the water supply valve.

4.Check the water heater and the piping for leaks.

22

VB Series Indoor LS Manual

Image 22
Contents REU-VB2528FFUD-US Table of Contents Specifications RL75i RL94i R98LSiSafety Behaviors and Practices Safety Features Consumer Safety InformationSafety Definitions Description of OperationTemperature Controller MC-91-1US & MCC-91-1USOperating Instructions Features Available on Temperature ControllersFeatures MC-91 MCC-91 MC-100 BC-100 MC-502 DescriptionTemperature Controller Settings How to Set the TemperatureModel Temperature Settings Available ºF Re-setting the Maximum Temperature RL75 and RL94 only Temperature Options Without a Temperature ControllerSetting the Sound Volume Voice Prompt MCC-91 Temperature ControllerSetting the Water Volume Using the Water Smart / Bath Fill FunctionOverview Filling the Tub Setting Controller to MuteSetting the Clock Models MC-91 and MCC-91Maintenance Error Codes Code Fault RemedyCode Accessing Operating Information Trouble Shooting for Common IssuesWater Quality Flushing the Heat Exchanger Error Code LC or Circulating PumpInstallation Instructions General InstructionsClearances from Appliance Attachment of the Water HeaterGas Piping Electrical ConnectionGeneral Instructions Pipe Sizing Procedure Example Pressure Relief Valve Maintenance Isolation Valves Installation InstructionsPressure Relief Valve Installation Instructions Water PipingPressure Relief Valve Requirements Piping RequirementsFreeze Protection Freeze Protection When the water heater or external piping has frozenManual draining of the water heater Freeze Protection Piping KEYRecommended Piping for Basic Installation Rinnai Water HeaterRecommended Piping for Circulation Systems For this applicationIntake / Exhaust Guidelines Venting InstructionsCondensate Maximum Vent Length Vent Products Manufacturer Product PartsDescription Canadian Installations US Installations Flue Terminal Clearances ANS Z21.10.3, CSAAdditional Clearances Vent Terminal Inside CornerFlue Installation Concentric Venting RL75i, RL94i Exhaust Pipe Assembly Flue Installation R98LSi, R98LSi-ASMEAir Intake Assembly Venting Clearances to CombustiblesHorizontal with Concentric Termination Vertical TerminationsNumber Connected Accessories Necessary Water Heaters Connecting Multiple Water HeatersHigh Altitude Installations GuidelinesCanada only Location Temperature Controller InstallationConfigurations Cable Lengths and SizeMounting the Controller Outline of RemoteFor Your Safety Read Before Operating Operating InstructionsPressure Drop Curve Technical DataOutlet Flow Data Space Heating Temperature SettingReplacement PumpsDimensions RL75i, RL94i R98LSi, R98LSi-ASMELadder Diagram for RL75i and RL94i Ladder Diagram for R98LSi and R98LSi-ASME HOTLimited Warranty Warranty InformationConsumer Support What will Rinnai do? State Regulations Important In the State of Massachusetts 248 CMR 4.00Instructions d’installation Instructions dutilisationInstructions dutilisation Temp. d’eauOptions de température sans contrôleur à distance Plages de température avec un contrôleur de températureModel Plages de température disponible ºF Entretien NettoyageInstructions générales Écartements par rapport à lappareil Fixation du chauffe-eauTuyauterie de gaz Installation à altitude élevéeInstructions générales Tuyauterie deau Valve à Bille / Valve de dégagement de pression RL75i, RL94iQualité de leau Soupape de sûretéTuyauterie recommandée pour installation de base LégendeConsignes pour aspiration/évacuation Instructions de ventilationCondensat Longueur maximum de ventilation 12.5 m 10.7 mConstructeur Produit Pièces Produits de ventilationHorizontale Espacements pour terminaison de cheminée ANS Z21.10.3, CSA Nest PAS PermiseInstallation de conduit de cheminée RL75i, RL94i Montage du tuyau dévacuation Installation de conduit de cheminée R98LSi, R98LSi-ASMEEnsemble de prise dair Terminaisons horizontalesTerminaison horizontale concentrique Terminaisons verticalesInstructions dutilisation VanneMa ualmanuelleValveDiagramme en escalier RL75i, RL94i PhaseDiagramme en escalier R98LSi, R98LSiASME Phase TRE NEU RALQuest-ce qui est couvert ? Support à la clientèleInformations sur la garantie Combien de temps dure la couverture ?Que fait Rinnai pour exercer la garantie ? VB Series Indoor LS Manual VB Series Indoor LS Manual VB Series Indoor LS Manual VB2528FFU VB2735FFU VA3237FFU