Rinnai RL94I Flue Installation R98LSi, R98LSi-ASME, Air Intake Assembly, Exhaust Pipe Assembly

Page 32

Flue Installation (R98LSi, R98LSi-ASME)

Air Intake Assembly

1

The air intake system consists of a field supplied 4 inch diameter stainless steel, Schedule 40 PVC, ABS or CPVC pipe. A maximum 6 feet of semi-rigid flexible aluminum ducting can also be used. Foil wrapped dryer vent and cell core products are not authorized.

2

The air intake has a zero clearance to combustibles.

Air Intake Connection

3

4

1.

Drill 2 small holes at the end of the air intake

 

pipe.

 

 

2.

Slide the pipe over the air intake terminal.

 

 

3.

Using a level, ensure the pipe is straight up and

 

 

 

down.

 

 

4.

With self tapping screws, attach the pipe to the air

 

 

 

intake terminal.

 

 

5.

Apply a bead of silicone around the pipe and air

 

 

 

intake terminal, ensuring an air tight connection.

 

 

Exhaust Pipe Assembly

Refer to the manufacturer’s installation instructions for the specific exhaust vent system.

Venting Clearances to Combustibles

 

Enclosed

Unenclosed

Vent Size

 

 

Horizontal &

Horizontal &

 

 

 

 

4" (102 mm)

4" (102 mm)

1" (26 mm)

 

 

 

Horizontal Terminations

The air intake must be located in relation to the exhaust as shown below. The air intake must angle 1/4 inch per foot to the termination to prevent entry of rain.

6

 

Vent

 

8

 

Optional

 

Intake

EXHAUST

Intake

COMBUSTION AIR /

INTAKE

 

SLOPE INTAKE AND EXHAUST

The vent termination and air

TOWARD OUTSIDE TERMINATION

MINIMUM 1/4" PER FOOT

intake must be in the same

 

pressure zone and face the

 

same direction.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

32

VB Series Indoor LS Manual

 

 

 

 

 

 

 

 

 

 

Image 32
Contents REU-VB2528FFUD-US Table of Contents Specifications RL75i RL94i R98LSiConsumer Safety Information Safety DefinitionsSafety Behaviors and Practices Safety Features Description of OperationTemperature Controller MC-91-1US & MCC-91-1USFeatures Available on Temperature Controllers FeaturesOperating Instructions MC-91 MCC-91 MC-100 BC-100 MC-502 DescriptionModel Temperature Settings Available ºF How to Set the TemperatureTemperature Controller Settings Temperature Options Without a Temperature Controller Setting the Sound Volume Voice PromptRe-setting the Maximum Temperature RL75 and RL94 only MCC-91 Temperature ControllerOverview Using the Water Smart / Bath Fill FunctionSetting the Water Volume Setting Controller to Mute Setting the ClockFilling the Tub Models MC-91 and MCC-91Maintenance Error Codes Code Fault RemedyCode Water Quality Trouble Shooting for Common IssuesAccessing Operating Information Flushing the Heat Exchanger Error Code LC or Circulating PumpInstallation Instructions General InstructionsClearances from Appliance Attachment of the Water HeaterGeneral Instructions Electrical ConnectionGas Piping Pipe Sizing Procedure Example Isolation Valves Installation Instructions Pressure Relief Valve Installation InstructionsPressure Relief Valve Maintenance Water PipingFreeze Protection Piping RequirementsPressure Relief Valve Requirements Manual draining of the water heater When the water heater or external piping has frozenFreeze Protection Freeze Protection Piping KEYRecommended Piping for Basic Installation Rinnai Water HeaterRecommended Piping for Circulation Systems For this applicationCondensate Venting InstructionsIntake / Exhaust Guidelines Maximum Vent Length Vent Products Manufacturer Product PartsDescription Canadian Installations US Installations Flue Terminal Clearances ANS Z21.10.3, CSAAdditional Clearances Vent Terminal Inside CornerFlue Installation Concentric Venting RL75i, RL94i Flue Installation R98LSi, R98LSi-ASME Air Intake AssemblyExhaust Pipe Assembly Venting Clearances to CombustiblesHorizontal with Concentric Termination Vertical TerminationsConnecting Multiple Water Heaters High Altitude InstallationsNumber Connected Accessories Necessary Water Heaters GuidelinesCanada only Temperature Controller Installation ConfigurationsLocation Cable Lengths and SizeMounting the Controller Outline of RemoteFor Your Safety Read Before Operating Operating InstructionsOutlet Flow Data Technical DataPressure Drop Curve Temperature Setting ReplacementSpace Heating PumpsDimensions RL75i, RL94i R98LSi, R98LSi-ASMELadder Diagram for RL75i and RL94i Ladder Diagram for R98LSi and R98LSi-ASME HOTConsumer Support Warranty InformationLimited Warranty What will Rinnai do? State Regulations Important In the State of Massachusetts 248 CMR 4.00Instructions d’installation Instructions dutilisationInstructions dutilisation Temp. d’eauModel Plages de température disponible ºF Plages de température avec un contrôleur de températureOptions de température sans contrôleur à distance Entretien NettoyageInstructions générales Écartements par rapport à lappareil Fixation du chauffe-eauInstructions générales Installation à altitude élevéeTuyauterie de gaz Tuyauterie deau Valve à Bille / Valve de dégagement de pression RL75i, RL94iQualité de leau Soupape de sûretéTuyauterie recommandée pour installation de base LégendeCondensat Instructions de ventilationConsignes pour aspiration/évacuation Longueur maximum de ventilation 12.5 m 10.7 mHorizontale Produits de ventilationConstructeur Produit Pièces Espacements pour terminaison de cheminée ANS Z21.10.3, CSA Nest PAS PermiseInstallation de conduit de cheminée RL75i, RL94i Installation de conduit de cheminée R98LSi, R98LSi-ASME Ensemble de prise dairMontage du tuyau dévacuation Terminaisons horizontalesTerminaison horizontale concentrique Terminaisons verticalesInstructions dutilisation VanneMa ualmanuelleValveDiagramme en escalier RL75i, RL94i PhaseDiagramme en escalier R98LSi, R98LSiASME Phase TRE NEU RALSupport à la clientèle Informations sur la garantieQuest-ce qui est couvert ? Combien de temps dure la couverture ?Que fait Rinnai pour exercer la garantie ? VB Series Indoor LS Manual VB Series Indoor LS Manual VB Series Indoor LS Manual VB2528FFU VB2735FFU VA3237FFU