Rinnai RL94I, RL75I Setting Controller to Mute, Setting the Clock, Filling the Tub

Page 10

Using the Water Smart / Bath Fill Function

Filling the Tub

ON! COLD

HOT

1.Press the “Water Smart / Bath Fill” button once. The button will illuminate, and a tone will sound.

2.The voice prompt will announce “The hot water system is ready. Open the hot water tap.”

Make sure the water volume is set. Refer to “Setting the Water Volume” on the previous page. Open the hot water tap. The “In Use” indicator will illuminate on MC-100V and BC-100V controllers. The hot water will begin to flow.

ON! COLD

3.When the preset volume of water has been produced then

HOT

the water flow will cease

the “Water Smart / Bath Fill” button will flash

a tone will sound

the voice prompt will announce, “Bath fill is complete. Turn off the bath hot water tap and push the Bath Fill button.”

4.Turn off the bath hot water tap and push the Bath Fill button. The water heater will not allow hot water to flow from any source until the “Water Smart / Bath Fill” button is pushed.

The button light will go out.

Setting Controller to Mute

Models MC-91 and MCC-91

To eliminate the beeps when keys are pressed or to turn the beeps back on, press and hold both the ▲and ▼ buttons until a beep is heard (approximately 5 seconds).

Setting the Clock

MC-100VPress the “Function” button twice within 10 seconds to set the clock. Press the ▲ or

button to reach the desired time. The clock on the BC-100V automatically shows the time which has been set on the MC-100V.

10

VB Series Indoor LS Manual

Image 10
Contents REU-VB2528FFUD-US Table of Contents Specifications RL75i RL94i R98LSiSafety Behaviors and Practices Safety Features Consumer Safety InformationSafety Definitions Description of OperationTemperature Controller MC-91-1US & MCC-91-1USOperating Instructions Features Available on Temperature ControllersFeatures MC-91 MCC-91 MC-100 BC-100 MC-502 DescriptionTemperature Controller Settings How to Set the TemperatureModel Temperature Settings Available ºF Re-setting the Maximum Temperature RL75 and RL94 only Temperature Options Without a Temperature ControllerSetting the Sound Volume Voice Prompt MCC-91 Temperature ControllerSetting the Water Volume Using the Water Smart / Bath Fill FunctionOverview Filling the Tub Setting Controller to MuteSetting the Clock Models MC-91 and MCC-91Maintenance Error Codes Code Fault RemedyCode Accessing Operating Information Trouble Shooting for Common IssuesWater Quality Flushing the Heat Exchanger Error Code LC or Circulating PumpInstallation Instructions General InstructionsClearances from Appliance Attachment of the Water HeaterGas Piping Electrical ConnectionGeneral Instructions Pipe Sizing Procedure Example Pressure Relief Valve Maintenance Isolation Valves Installation InstructionsPressure Relief Valve Installation Instructions Water PipingPressure Relief Valve Requirements Piping RequirementsFreeze Protection Freeze Protection When the water heater or external piping has frozenManual draining of the water heater Freeze Protection Piping KEYRecommended Piping for Basic Installation Rinnai Water HeaterRecommended Piping for Circulation Systems For this applicationIntake / Exhaust Guidelines Venting InstructionsCondensate Maximum Vent Length Vent Products Manufacturer Product PartsDescription Canadian Installations US Installations Flue Terminal Clearances ANS Z21.10.3, CSAAdditional Clearances Vent Terminal Inside CornerFlue Installation Concentric Venting RL75i, RL94i Exhaust Pipe Assembly Flue Installation R98LSi, R98LSi-ASMEAir Intake Assembly Venting Clearances to CombustiblesHorizontal with Concentric Termination Vertical TerminationsNumber Connected Accessories Necessary Water Heaters Connecting Multiple Water HeatersHigh Altitude Installations GuidelinesCanada only Location Temperature Controller InstallationConfigurations Cable Lengths and SizeMounting the Controller Outline of RemoteFor Your Safety Read Before Operating Operating InstructionsPressure Drop Curve Technical DataOutlet Flow Data Space Heating Temperature SettingReplacement PumpsDimensions RL75i, RL94i R98LSi, R98LSi-ASMELadder Diagram for RL75i and RL94i Ladder Diagram for R98LSi and R98LSi-ASME HOTLimited Warranty Warranty InformationConsumer Support What will Rinnai do? State Regulations Important In the State of Massachusetts 248 CMR 4.00Instructions d’installation Instructions dutilisationInstructions dutilisation Temp. d’eauOptions de température sans contrôleur à distance Plages de température avec un contrôleur de températureModel Plages de température disponible ºF Entretien NettoyageInstructions générales Écartements par rapport à lappareil Fixation du chauffe-eauTuyauterie de gaz Installation à altitude élevéeInstructions générales Tuyauterie deau Valve à Bille / Valve de dégagement de pression RL75i, RL94iQualité de leau Soupape de sûretéTuyauterie recommandée pour installation de base LégendeConsignes pour aspiration/évacuation Instructions de ventilationCondensat Longueur maximum de ventilation 12.5 m 10.7 mConstructeur Produit Pièces Produits de ventilationHorizontale Espacements pour terminaison de cheminée ANS Z21.10.3, CSA Nest PAS PermiseInstallation de conduit de cheminée RL75i, RL94i Montage du tuyau dévacuation Installation de conduit de cheminée R98LSi, R98LSi-ASMEEnsemble de prise dair Terminaisons horizontalesTerminaison horizontale concentrique Terminaisons verticalesInstructions dutilisation VanneMa ualmanuelleValveDiagramme en escalier RL75i, RL94i PhaseDiagramme en escalier R98LSi, R98LSiASME Phase TRE NEU RALQuest-ce qui est couvert ? Support à la clientèleInformations sur la garantie Combien de temps dure la couverture ?Que fait Rinnai pour exercer la garantie ? VB Series Indoor LS Manual VB Series Indoor LS Manual VB Series Indoor LS Manual VB2528FFU VB2735FFU VA3237FFU