GSI Outdoors 2TFC, 2TAF Control BOX Mounting, Fill System Control Box Mounting

Page 11

2000 Autoflow

CONTROL BOX MOUNTING

Fill System Control Box Mounting

1) The Fill System control Box should be mounted at eye-level. Make sure to install the Fill System Control Box so that the Fill System(s) and Aeration fan are in view.

2) Keep in mind that wire will be used to interconnect the Fill System Control Box with the Autoflow Control Box; and, that power wires will have to be run from the entrance panel to the Fill System control Box to power the Fill System and Aeration fan motors, which will also run from the Fill System Control Box.

3) Use the pattern in Figure 2 to drill holes for the Fill System Control Box.

Fill System Control Box Mounted to Bin

11

Image 11
Contents Series Autoflow Fan/Heater Control Installation Instructions Autoflow Table of Contents Roof Damage Warning and Disclaimer Roof WARNING, Operation & SafetySeries 2000 Autoflow Installation & Operating Instructions Safety Alert SymbolSafety Use Caution Operation of this Equipment Safety PrecautionsSafety SIGN-OFF Sheet Autoflow Control Box Mounting InstallationFan and Heater Mounting Top Dry Bin Eave HeightComponent Placement Series 2000 Autoflow Control Box Bolt Pattern Fill System Control Box Mounting Control BOX MountingFill System Control Box Bolt Pattern Actuator Control Box Mounting Bolt pattern to drill holes for the Actuator Control Box Multi-Grain Temperature Sensor Grain Temperature Sensor Mounted to Leveling Band Post Close-Up Detail of Grain Temperture Sensor Wiring Plenum Temperature Sensor Airswitch Installation Wet Supply Rotary Switch Installation Storage Chamber High Limit Rotary Switch Installation Installation Drying Chamber Rotary Switches Mounted in Bin Roof Drying Chamber Low-Level Rotary Switch Installation Installation Drying Chamber High-Level Rotary Switch Installation Installation Drying Chamber Overflow Rotary Switch Installation Installation Liquid Propane LP Natural Gas NG Grounding Electrical Power SupplyConduit Runs Control Wires Power/Motor WiresMachine to Earth Grounding Power SupplyTransformer and Wiring Voltage Drop Proper Installation of Ground RodTop Dry and ground rod attachment illustration Main Power Schematic POWER/MOTOR WiringElectrical Load Information Voltage Horsepower Wire Size InformationStarter Fill System Control Box Electrical Load InformationElectrical Power Supply Autoflow to Master Fan/Heater Unit Interconnect Autoflow to Actuator Interconnect Autoflow to Wet Supply Rotary Switch Interconnect Autoflow to Storage Chamber Rotary Switch Inerconnect Autoflow to Drying Chamber Rotary Switches Interconnect Electrial Power SupplyElectrial Power Supply Autoflow to Fill System Control Box Interconnect Autoflow to Ground Interconnect Master to Slave Interconnect Slave to Slave Interconnect Battery Hook-Up Dump Chute Cable Installation Electrical Power Supply Warranty Revision #1 February Airstream Grain Conditioning Systems