GSI Outdoors 2TFC, 2TAF installation instructions Component Placement

Page 9

2000 Autoflow

INSTALLATION

Component Placement

9

Image 9
Contents Series Autoflow Fan/Heater Control Installation Instructions Autoflow Table of Contents Series 2000 Autoflow Installation & Operating Instructions Roof WARNING, Operation & SafetySafety Alert Symbol Roof Damage Warning and DisclaimerSafety Use Caution Operation of this Equipment Safety PrecautionsSafety SIGN-OFF Sheet Fan and Heater Mounting InstallationTop Dry Bin Eave Height Autoflow Control Box MountingComponent Placement Series 2000 Autoflow Control Box Bolt Pattern Fill System Control Box Mounting Control BOX MountingFill System Control Box Bolt Pattern Actuator Control Box Mounting Bolt pattern to drill holes for the Actuator Control Box Multi-Grain Temperature Sensor Grain Temperature Sensor Mounted to Leveling Band Post Close-Up Detail of Grain Temperture Sensor Wiring Plenum Temperature Sensor Airswitch Installation Wet Supply Rotary Switch Installation Storage Chamber High Limit Rotary Switch Installation Installation Drying Chamber Rotary Switches Mounted in Bin Roof Drying Chamber Low-Level Rotary Switch Installation Installation Drying Chamber High-Level Rotary Switch Installation Installation Drying Chamber Overflow Rotary Switch Installation Installation Liquid Propane LP Natural Gas NG Conduit Runs Control Wires Electrical Power SupplyPower/Motor Wires GroundingTransformer and Wiring Voltage Drop Power SupplyProper Installation of Ground Rod Machine to Earth GroundingTop Dry and ground rod attachment illustration Main Power Schematic POWER/MOTOR WiringElectrical Load Information Voltage Horsepower Wire Size InformationStarter Fill System Control Box Electrical Load InformationElectrical Power Supply Autoflow to Master Fan/Heater Unit Interconnect Autoflow to Actuator Interconnect Autoflow to Wet Supply Rotary Switch Interconnect Autoflow to Storage Chamber Rotary Switch Inerconnect Autoflow to Drying Chamber Rotary Switches Interconnect Electrial Power SupplyElectrial Power Supply Autoflow to Fill System Control Box Interconnect Autoflow to Ground Interconnect Master to Slave Interconnect Slave to Slave Interconnect Battery Hook-Up Dump Chute Cable Installation Electrical Power Supply Warranty Revision #1 February Airstream Grain Conditioning Systems