GSI Outdoors 2TFC, 2TAF installation instructions Dump Chute Cable Installation

Page 53

2000 Autoflow

ELECTRICAL POWER SUPPLY

Dump Chute Cable Installation

After complete installation of the Autoflow Unit the cable should be hooked up to the linear actuator in the Actuator Control Box. To test the linear actuator and install the cable do the following:

1)Turn all switches on the Autoflow control front panel to the “off” position.

2)Make sure the Emergency Stop switches on all the control boxes are pulled out.

3)Turn the Control Power switch to the “on” position.

4)The display should read “stopped” at the bottom.

5)While watching the linear actuator turn the Dump switch to the “manual open” position.

6)The Linear actuator should extend down 16”.

7)Place the Dump switch in the “auto” position and press the Stop switch.

8)The linear actuator should retract and stop.

9)Place the Control Power switch in the “off” position and push the Emergency stop switch in on the Autoflow and Actuator Control Boxes.

10)Route the cable as shown in figure 29.

11)Make sure that all dump chutes are approximately 5 degrees below level when in the closed position.

12)Double check all dump chutes to make sure that they are all adjusted the same when in the closed position. The Autoflow Unit will not operate properly if the dump chutes are adjusted unevenly.

53

Image 53
Contents Series Autoflow Fan/Heater Control Installation Instructions Autoflow Table of Contents Series 2000 Autoflow Installation & Operating Instructions Roof WARNING, Operation & SafetySafety Alert Symbol Roof Damage Warning and DisclaimerSafety Use Caution Operation of this Equipment Safety PrecautionsSafety SIGN-OFF Sheet Fan and Heater Mounting InstallationTop Dry Bin Eave Height Autoflow Control Box MountingComponent Placement Series 2000 Autoflow Control Box Bolt Pattern Fill System Control Box Mounting Control BOX MountingFill System Control Box Bolt Pattern Actuator Control Box Mounting Bolt pattern to drill holes for the Actuator Control Box Multi-Grain Temperature Sensor Grain Temperature Sensor Mounted to Leveling Band Post Close-Up Detail of Grain Temperture Sensor Wiring Plenum Temperature Sensor Airswitch Installation Wet Supply Rotary Switch Installation Storage Chamber High Limit Rotary Switch Installation Installation Drying Chamber Rotary Switches Mounted in Bin Roof Drying Chamber Low-Level Rotary Switch Installation Installation Drying Chamber High-Level Rotary Switch Installation Installation Drying Chamber Overflow Rotary Switch Installation Installation Liquid Propane LP Natural Gas NG Conduit Runs Control Wires Electrical Power SupplyPower/Motor Wires GroundingTransformer and Wiring Voltage Drop Power SupplyProper Installation of Ground Rod Machine to Earth GroundingTop Dry and ground rod attachment illustration Main Power Schematic POWER/MOTOR WiringElectrical Load Information Voltage Horsepower Wire Size InformationStarter Fill System Control Box Electrical Load InformationElectrical Power Supply Autoflow to Master Fan/Heater Unit Interconnect Autoflow to Actuator Interconnect Autoflow to Wet Supply Rotary Switch Interconnect Autoflow to Storage Chamber Rotary Switch Inerconnect Autoflow to Drying Chamber Rotary Switches Interconnect Electrial Power SupplyElectrial Power Supply Autoflow to Fill System Control Box Interconnect Autoflow to Ground Interconnect Master to Slave Interconnect Slave to Slave Interconnect Battery Hook-Up Dump Chute Cable Installation Electrical Power Supply Warranty Revision #1 February Airstream Grain Conditioning Systems