2000 Autoflow
INSTALLATION
Multi-Grain Temperature Sensor
1.Remove the two wires attached to the grain tem- perature sensor connected to terminal #22 and terminal #23 in the fan control box.
2.Mount the four grain temperature sensor brack- ets evenly around the drying chamber on out side leveling band posts (figure 5).
3.With bin bolts mount the bracket so the sensor is 10.1/2” above the floor sheet rib.
4.Wire tie the cords so they feed up the leveling
band post, and across the top leveling band.
5.Take the cords through the space between the roof and the top sidewall sheet. There should be enough on all temperature sensor brackets to exit the dry ing chamber at the same place.
6.Run the cords back into the fan control box.
7.Wire the four temperature sensors into terminal #22 and terminal #23 as detailed in Figure 4 and the close up detail on page 17.
Figure 4: Illustration of the connection between the master heater control box and multiple sensors in the
drying chamber.
15