GSI Outdoors 2TFC, 2TAF installation instructions Installation, Multi-Grain Temperature Sensor

Page 15

2000 Autoflow

INSTALLATION

Multi-Grain Temperature Sensor

1.Remove the two wires attached to the grain tem- perature sensor connected to terminal #22 and terminal #23 in the fan control box.

2.Mount the four grain temperature sensor brack- ets evenly around the drying chamber on out side leveling band posts (figure 5).

3.With bin bolts mount the bracket so the sensor is 10.1/2” above the floor sheet rib.

4.Wire tie the cords so they feed up the leveling

band post, and across the top leveling band.

5.Take the cords through the space between the roof and the top sidewall sheet. There should be enough on all temperature sensor brackets to exit the dry ing chamber at the same place.

6.Run the cords back into the fan control box.

7.Wire the four temperature sensors into terminal #22 and terminal #23 as detailed in Figure 4 and the close up detail on page 17.

Figure 4: Illustration of the connection between the master heater control box and multiple sensors in the

drying chamber.

15

Image 15
Contents Series Autoflow Fan/Heater Control Installation Instructions Autoflow Table of Contents Roof Damage Warning and Disclaimer Roof WARNING, Operation & SafetySeries 2000 Autoflow Installation & Operating Instructions Safety Alert SymbolSafety Use Caution Operation of this Equipment Safety PrecautionsSafety SIGN-OFF Sheet Autoflow Control Box Mounting InstallationFan and Heater Mounting Top Dry Bin Eave HeightComponent Placement Series 2000 Autoflow Control Box Bolt Pattern Fill System Control Box Mounting Control BOX MountingFill System Control Box Bolt Pattern Actuator Control Box Mounting Bolt pattern to drill holes for the Actuator Control Box Multi-Grain Temperature Sensor Grain Temperature Sensor Mounted to Leveling Band Post Close-Up Detail of Grain Temperture Sensor Wiring Plenum Temperature Sensor Airswitch Installation Wet Supply Rotary Switch Installation Storage Chamber High Limit Rotary Switch Installation Installation Drying Chamber Rotary Switches Mounted in Bin Roof Drying Chamber Low-Level Rotary Switch Installation Installation Drying Chamber High-Level Rotary Switch Installation Installation Drying Chamber Overflow Rotary Switch Installation Installation Liquid Propane LP Natural Gas NG Grounding Electrical Power SupplyConduit Runs Control Wires Power/Motor WiresMachine to Earth Grounding Power SupplyTransformer and Wiring Voltage Drop Proper Installation of Ground RodTop Dry and ground rod attachment illustration Main Power Schematic POWER/MOTOR WiringElectrical Load Information Voltage Horsepower Wire Size InformationStarter Fill System Control Box Electrical Load InformationElectrical Power Supply Autoflow to Master Fan/Heater Unit Interconnect Autoflow to Actuator Interconnect Autoflow to Wet Supply Rotary Switch Interconnect Autoflow to Storage Chamber Rotary Switch Inerconnect Autoflow to Drying Chamber Rotary Switches Interconnect Electrial Power SupplyElectrial Power Supply Autoflow to Fill System Control Box Interconnect Autoflow to Ground Interconnect Master to Slave Interconnect Slave to Slave Interconnect Battery Hook-Up Dump Chute Cable Installation Electrical Power Supply Warranty Revision #1 February Airstream Grain Conditioning Systems