ELECTRICAL POWER SUPPLY

Slave to Slave Interconnect

A second slave fan/heater unit can be added to operate in unison with the master fan/heater unit and another slave fan/heater unit. This would cre- ate a three fan unit. The interconnect between the first slave fan/heater unit and the second slave fan/heater unit remains the same regardless of the type or presence of a control center. To wire a second slave fan/heater unit to another slave fan/heater unit do the following:

NOTE: Do NOT use solid wire for inter- connection.

1.Run four (4) 16ga MTW type wires from the first slave fan/heater unit to the second slave fan/heater unit.

2.Connect the wires as shown in figure #27.

NOTE: A shielded 16 gauge cable is recom- mended for use on the network connections. The network connections for this configuration are attached to terminals number 7 and 8 in slave #1 and terminals number 3 and 4 in slave #2. Ground each end of the shielded cable to the housing. A shielded 16 gauge 2 wire cable can be purchased from GSI. Part #WR-16 / 2S

Figure 27: Wiring for a second slave fan/heater unit to another slave fan/heater unit.

51

Image 51
Contents Series Autoflow Fan/Heater Control Installation Instructions Autoflow Table of Contents Roof Damage Warning and Disclaimer Roof WARNING, Operation & SafetySeries 2000 Autoflow Installation & Operating Instructions Safety Alert SymbolSafety Use Caution Operation of this Equipment Safety PrecautionsSafety SIGN-OFF Sheet Autoflow Control Box Mounting InstallationFan and Heater Mounting Top Dry Bin Eave HeightComponent Placement Series 2000 Autoflow Control Box Bolt Pattern Fill System Control Box Mounting Control BOX MountingFill System Control Box Bolt Pattern Actuator Control Box Mounting Bolt pattern to drill holes for the Actuator Control Box Multi-Grain Temperature Sensor Grain Temperature Sensor Mounted to Leveling Band Post Close-Up Detail of Grain Temperture Sensor Wiring Plenum Temperature Sensor Airswitch Installation Wet Supply Rotary Switch Installation Storage Chamber High Limit Rotary Switch Installation Installation Drying Chamber Rotary Switches Mounted in Bin Roof Drying Chamber Low-Level Rotary Switch Installation Installation Drying Chamber High-Level Rotary Switch Installation Installation Drying Chamber Overflow Rotary Switch Installation Installation Liquid Propane LP Natural Gas NG Grounding Electrical Power SupplyConduit Runs Control Wires Power/Motor WiresMachine to Earth Grounding Power SupplyTransformer and Wiring Voltage Drop Proper Installation of Ground RodTop Dry and ground rod attachment illustration Main Power Schematic POWER/MOTOR WiringElectrical Load Information Voltage Horsepower Wire Size InformationStarter Fill System Control Box Electrical Load InformationElectrical Power Supply Autoflow to Master Fan/Heater Unit Interconnect Autoflow to Actuator Interconnect Autoflow to Wet Supply Rotary Switch Interconnect Autoflow to Storage Chamber Rotary Switch Inerconnect Autoflow to Drying Chamber Rotary Switches Interconnect Electrial Power SupplyElectrial Power Supply Autoflow to Fill System Control Box Interconnect Autoflow to Ground Interconnect Master to Slave Interconnect Slave to Slave Interconnect Battery Hook-Up Dump Chute Cable Installation Electrical Power Supply Warranty Revision #1 February Airstream Grain Conditioning Systems