GSI Outdoors 2TFC, 2TAF Storage Chamber High Limit Rotary Switch Installation

Page 23

2000 Autoflow

INSTALLATION

Storage Chamber High Limit Rotary Switch Installation

1)Drill a 2” diameter hole through the sidewall 3’ below the fan/heater.

2)If the bin is 2.66” corrugation the hole should be centered on an outside hill.

3)If the bin is 4.00” corrugation the hole should be centered on an outside valley.

4)Use the mounting plate as a pattern and drill four 3/8” holes through the sidewall at the switch location so the plate can be bolted to the bin.

5)Add foam weather strip around the top and side of the mounting plate.

6)Caulk the underside of the mounting plate, on all sides of the 2” hole, and

where the plate meets the bin.

7)Bolt the mounting plate to the sidewall.

8)Attach the flex coupling to the rotary switch power pack using a roll pin.

9)Attach the 1-vane paddle to the flex coupling as shown in figure 7.

10)Apply teflon tape or pipe sealant (not included) to the rotary switch power pak threads and thread the rotary switch power pack into the mounting plate coupling.

11)Make sure that the conduit hole is facing down or is horizontal.

Storage chamber rotary switch.

23

Image 23
Contents Series Autoflow Fan/Heater Control Installation Instructions Autoflow Table of Contents Roof Damage Warning and Disclaimer Roof WARNING, Operation & SafetySeries 2000 Autoflow Installation & Operating Instructions Safety Alert SymbolSafety Use Caution Operation of this Equipment Safety PrecautionsSafety SIGN-OFF Sheet Autoflow Control Box Mounting InstallationFan and Heater Mounting Top Dry Bin Eave HeightComponent Placement Series 2000 Autoflow Control Box Bolt Pattern Fill System Control Box Mounting Control BOX MountingFill System Control Box Bolt Pattern Actuator Control Box Mounting Bolt pattern to drill holes for the Actuator Control Box Multi-Grain Temperature Sensor Grain Temperature Sensor Mounted to Leveling Band Post Close-Up Detail of Grain Temperture Sensor Wiring Plenum Temperature Sensor Airswitch Installation Wet Supply Rotary Switch Installation Storage Chamber High Limit Rotary Switch Installation Installation Drying Chamber Rotary Switches Mounted in Bin Roof Drying Chamber Low-Level Rotary Switch Installation Installation Drying Chamber High-Level Rotary Switch Installation Installation Drying Chamber Overflow Rotary Switch Installation Installation Liquid Propane LP Natural Gas NG Grounding Electrical Power SupplyConduit Runs Control Wires Power/Motor WiresMachine to Earth Grounding Power SupplyTransformer and Wiring Voltage Drop Proper Installation of Ground RodTop Dry and ground rod attachment illustration Main Power Schematic POWER/MOTOR WiringElectrical Load Information Voltage Horsepower Wire Size InformationStarter Fill System Control Box Electrical Load InformationElectrical Power Supply Autoflow to Master Fan/Heater Unit Interconnect Autoflow to Actuator Interconnect Autoflow to Wet Supply Rotary Switch Interconnect Autoflow to Storage Chamber Rotary Switch Inerconnect Autoflow to Drying Chamber Rotary Switches Interconnect Electrial Power SupplyElectrial Power Supply Autoflow to Fill System Control Box Interconnect Autoflow to Ground Interconnect Master to Slave Interconnect Slave to Slave Interconnect Battery Hook-Up Dump Chute Cable Installation Electrical Power Supply Warranty Revision #1 February Airstream Grain Conditioning Systems