GSI Outdoors 2TAF, 2TFC Fill System Control Box Electrical Load Information, Starter

Page 40

ELECTRICAL POWER SUPPLY

2000 Autoflow

Fill System Control Box Electrical Load Information

The following charts provide information for the electrician wiring the grain dryer, and are a reference guide for parts. It is recommended that you contact your local power company and have a representative survey the installation to see that your wiring is compatible with their system and that adequate power is supplied to your unit. Remember that the only thing connected to the recommended service amps should be your grain dryer. Standard electrical safety should be used. (Refer to the National Electrical Code Standard handbook by the National Fire Protection Association.) A qualified electrician should make all electrical wiring installations.

 

 

 

 

Relay

Fill System

 

Full Load

Motor

Heater

HP

Voltage

Amps

Starter

Strips

 

220v1ph

13

30

C137B

 

 

 

 

 

3 HP

220v3ph

7

30

C104B

 

 

 

 

 

 

380v50hz

4

30

C630A

 

 

 

 

 

 

460v3ph

4

30

C630A

 

 

 

 

 

 

575v3ph

3

30

C630A

 

 

 

 

 

 

 

 

 

 

 

220v1ph

21

30

C228B

 

 

 

 

 

5 HP

220v3ph

12

30

C163B

 

 

 

 

 

 

380v50hz

7

30

C955A

 

 

 

 

 

 

460v3ph

6

30

C778A

 

 

 

 

 

 

575v3ph

5

30

C630A

 

 

 

 

 

 

 

 

 

 

 

220v1ph

32

40

C303B

 

 

 

 

 

7.5 HP

220v3ph

18

30

C228B

 

 

 

 

 

 

380v50hz

11

30

C151B

 

 

 

 

 

 

460v3ph

9

30

C125B

 

 

 

 

 

 

575v3ph

7

30

C955B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Relay

 

 

Fill System

 

Full Load

Motor

Heater

 

 

HP

Voltage

Amps

Starter

Strips

 

 

 

220v1ph

42

60

C366B

 

 

 

 

 

 

 

 

 

10 HP

220v3ph

25

30

C303B

 

 

 

 

 

 

 

 

 

 

380v50hz

14

30

C180B

 

 

 

 

 

 

 

 

 

 

460v3ph

12

30

C163B

 

 

 

 

 

 

 

 

 

 

575v3ph

9

30

C137B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

220v1ph

64

75

F658B

 

 

 

 

 

 

 

 

 

15 HP

220v3ph

37

40

C400B

 

 

 

 

 

 

 

 

 

 

380v50hz

21

30

C273B

 

 

 

 

 

 

 

 

 

 

460v3ph

18

30

C214B

 

 

 

 

 

 

 

 

 

 

575v3ph

14

30

C180B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

220v3ph

49

60

C500B

 

 

 

 

 

 

 

 

 

20 HP

380v50hz

28

40

C330B

 

 

 

 

 

 

 

 

 

 

460v3ph

23

30

C303B

 

 

 

 

 

 

 

 

 

 

575v3ph

19

30

C228B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

220v3ph

61

75

F719B

 

 

 

 

 

 

 

 

 

25 HP

380v50hz

35

40

C400B

 

 

 

 

 

 

 

 

 

 

460v3ph

29

40

C330B

 

 

 

 

 

 

 

 

 

 

575v3ph

23

30

C273B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

220v3ph

73

75

F772B

 

 

 

 

 

 

 

 

 

30 HP

380v50hz

43

60

C440B

 

 

 

 

 

 

 

 

 

 

460v3ph

35

40

C400B

 

 

 

 

 

 

 

 

 

 

575v3ph

28

40

C330B

 

 

 

 

 

 

 

 

40

Image 40
Contents Series Autoflow Fan/Heater Control Installation Instructions Autoflow Table of Contents Roof WARNING, Operation & Safety Series 2000 Autoflow Installation & Operating InstructionsSafety Alert Symbol Roof Damage Warning and DisclaimerSafety Safety Precautions Use Caution Operation of this EquipmentSafety SIGN-OFF Sheet Installation Fan and Heater MountingTop Dry Bin Eave Height Autoflow Control Box MountingComponent Placement Series 2000 Autoflow Control Box Bolt Pattern Control BOX Mounting Fill System Control Box MountingFill System Control Box Bolt Pattern Actuator Control Box Mounting Bolt pattern to drill holes for the Actuator Control Box Multi-Grain Temperature Sensor Grain Temperature Sensor Mounted to Leveling Band Post Close-Up Detail of Grain Temperture Sensor Wiring Plenum Temperature Sensor Airswitch Installation Wet Supply Rotary Switch Installation Storage Chamber High Limit Rotary Switch Installation Installation Drying Chamber Rotary Switches Mounted in Bin Roof Drying Chamber Low-Level Rotary Switch Installation Installation Drying Chamber High-Level Rotary Switch Installation Installation Drying Chamber Overflow Rotary Switch Installation Installation Liquid Propane LP Natural Gas NG Electrical Power Supply Conduit Runs Control WiresPower/Motor Wires GroundingPower Supply Transformer and Wiring Voltage DropProper Installation of Ground Rod Machine to Earth GroundingTop Dry and ground rod attachment illustration POWER/MOTOR Wiring Main Power SchematicElectrical Load Information Wire Size Information Voltage HorsepowerFill System Control Box Electrical Load Information StarterElectrical Power Supply Autoflow to Master Fan/Heater Unit Interconnect Autoflow to Actuator Interconnect Autoflow to Wet Supply Rotary Switch Interconnect Autoflow to Storage Chamber Rotary Switch Inerconnect Electrial Power Supply Autoflow to Drying Chamber Rotary Switches InterconnectElectrial Power Supply Autoflow to Fill System Control Box Interconnect Autoflow to Ground Interconnect Master to Slave Interconnect Slave to Slave Interconnect Battery Hook-Up Dump Chute Cable Installation Electrical Power Supply Warranty Revision #1 February Airstream Grain Conditioning Systems