GSI Outdoors 2TFC, 2TAF installation instructions Liquid Propane LP

Page 32

INSTALLATION

2000 Autoflow

Liquid Propane (LP)

Top Dry dryers have internal vapor- izers, and they are designed to oper- ate on liquid draw from the supply tank. Avoid using propane supply tanks that have been used for vapor draw for long periods of time. When using liquid draw systems any mois- ture that may be present in tanks or lines may freeze when the system is used in cold weather. To avoid this situation, purge the system with methanol. Do not use tanks which have previously been used for am- monia or fertilizer solutions. These substances are extremely corrosive and will damage fuel supply and burner parts. Because the vaporizer coil may need to be adjusted during operation flexible hose suitable for LPs should be used for the final field connection.

See the “Fuel Systems and Rec-

ommendations Chart” for liquid propane to determine the correct size line to run from the tank to the dryer. Have a qualified gas service per- son inspect the installation to be sure that everything is installed ac- cording to local codes and ordinances.

After installation is complete check all connections for leaks with liquid detergent or comparable. Wear rubber gloves and eye protection. Avoid contact with liquid propane. DO NOT USE FLAME FOR LEAK TESTING.

LP line field connection.

Fuel System Specifications and Recommendations

Liquid Propane (LP)

 

 

Maximum Heat

Maximum Fuel

 

 

Minimum

Maximum

Dryer

Dryer

Capacity BTU

Flow Gallons

Minimum

Orifice

Operating

Operating

Fan Size

Horsepower

Per Hour

Per Hour

Line Size

Size

Pressure

Pressure

36”

10-12

3.5 million

39

1/2”

9/32”

1 lb.

15 lbs.

36”

15

4.5 million

50

1/2”

.265”

1 lb.

15 lbs.

42”

15

5.75 million

64

1/2”

.344”

1 lb.

15 lbs.

42”

20

6.75 million

75

1/2”

3/8”

1 lb.

15 lbs.

42”

30

8.75 million

97

1/2”

.328”

1 lb.

15 lbs.

42”

40

10.25 million

113

3/4”

29/64”

1 lb.

15 lbs.

 

 

 

 

 

 

 

 

32

Image 32
Contents Series Autoflow Fan/Heater Control Installation Instructions Autoflow Table of Contents Roof WARNING, Operation & Safety Series 2000 Autoflow Installation & Operating InstructionsSafety Alert Symbol Roof Damage Warning and DisclaimerSafety Safety Precautions Use Caution Operation of this EquipmentSafety SIGN-OFF Sheet Installation Fan and Heater MountingTop Dry Bin Eave Height Autoflow Control Box MountingComponent Placement Series 2000 Autoflow Control Box Bolt Pattern Control BOX Mounting Fill System Control Box MountingFill System Control Box Bolt Pattern Actuator Control Box Mounting Bolt pattern to drill holes for the Actuator Control Box Multi-Grain Temperature Sensor Grain Temperature Sensor Mounted to Leveling Band Post Close-Up Detail of Grain Temperture Sensor Wiring Plenum Temperature Sensor Airswitch Installation Wet Supply Rotary Switch Installation Storage Chamber High Limit Rotary Switch Installation Installation Drying Chamber Rotary Switches Mounted in Bin Roof Drying Chamber Low-Level Rotary Switch Installation Installation Drying Chamber High-Level Rotary Switch Installation Installation Drying Chamber Overflow Rotary Switch Installation Installation Liquid Propane LP Natural Gas NG Electrical Power Supply Conduit Runs Control WiresPower/Motor Wires GroundingPower Supply Transformer and Wiring Voltage DropProper Installation of Ground Rod Machine to Earth GroundingTop Dry and ground rod attachment illustration POWER/MOTOR Wiring Main Power SchematicElectrical Load Information Wire Size Information Voltage HorsepowerFill System Control Box Electrical Load Information StarterElectrical Power Supply Autoflow to Master Fan/Heater Unit Interconnect Autoflow to Actuator Interconnect Autoflow to Wet Supply Rotary Switch Interconnect Autoflow to Storage Chamber Rotary Switch Inerconnect Electrial Power Supply Autoflow to Drying Chamber Rotary Switches InterconnectElectrial Power Supply Autoflow to Fill System Control Box Interconnect Autoflow to Ground Interconnect Master to Slave Interconnect Slave to Slave Interconnect Battery Hook-Up Dump Chute Cable Installation Electrical Power Supply Warranty Revision #1 February Airstream Grain Conditioning Systems