GSI Outdoors 2TFC, 2TAF Installation, Fan and Heater Mounting, Top Dry Bin Eave Height

Page 8

INSTALLATION

2000 Autoflow

Fan and Heater Mounting

1.Inspect the fan platform for proper installation per instructions in the Top Dry erection manual.

2.Raise the Top Dry fan and heater units to the plat form. Use the table to the right to determine the height of the platform from the base of the TopDry unit.

3.Mount the Top Dry fan and heater units to the bin entrance sheets. Fan legs should set on the plat form.

Top Dry Bin Eave Height

Number Eave

of Rings Height

518’-5”

622’-1”

725’-9”

829’-5”

9 33’-1”

10 36’-9”

11 40’-5”

Autoflow Control Box Mounting

Save for Control box mounted on Bin picture

Autoflow Control box mounted on bin.

1.The Autoflow Control Box should be mounted at eye-level. Make sure to mount the Autoflow control box so that the fan and heater unit(s) are in view.

2.Keep in mind that wire will be used to inter connect the Autoflow control Box with the

fan and heater unit(s), Fill System Control Box, Actuator and all rotary switches.

3.Use the hole pattern in Figure 1 to drill holes for mounting the Autoflow Control Box.

8

Image 8
Contents Series Autoflow Fan/Heater Control Installation Instructions Autoflow Table of Contents Roof WARNING, Operation & Safety Series 2000 Autoflow Installation & Operating InstructionsSafety Alert Symbol Roof Damage Warning and DisclaimerSafety Safety Precautions Use Caution Operation of this EquipmentSafety SIGN-OFF Sheet Installation Fan and Heater MountingTop Dry Bin Eave Height Autoflow Control Box MountingComponent Placement Series 2000 Autoflow Control Box Bolt Pattern Control BOX Mounting Fill System Control Box MountingFill System Control Box Bolt Pattern Actuator Control Box Mounting Bolt pattern to drill holes for the Actuator Control Box Multi-Grain Temperature Sensor Grain Temperature Sensor Mounted to Leveling Band Post Close-Up Detail of Grain Temperture Sensor Wiring Plenum Temperature Sensor Airswitch Installation Wet Supply Rotary Switch Installation Storage Chamber High Limit Rotary Switch Installation Installation Drying Chamber Rotary Switches Mounted in Bin Roof Drying Chamber Low-Level Rotary Switch Installation Installation Drying Chamber High-Level Rotary Switch Installation Installation Drying Chamber Overflow Rotary Switch Installation Installation Liquid Propane LP Natural Gas NG Electrical Power Supply Conduit Runs Control WiresPower/Motor Wires GroundingPower Supply Transformer and Wiring Voltage DropProper Installation of Ground Rod Machine to Earth GroundingTop Dry and ground rod attachment illustration POWER/MOTOR Wiring Main Power SchematicElectrical Load Information Wire Size Information Voltage HorsepowerFill System Control Box Electrical Load Information StarterElectrical Power Supply Autoflow to Master Fan/Heater Unit Interconnect Autoflow to Actuator Interconnect Autoflow to Wet Supply Rotary Switch Interconnect Autoflow to Storage Chamber Rotary Switch Inerconnect Electrial Power Supply Autoflow to Drying Chamber Rotary Switches InterconnectElectrial Power Supply Autoflow to Fill System Control Box Interconnect Autoflow to Ground Interconnect Master to Slave Interconnect Slave to Slave Interconnect Battery Hook-Up Dump Chute Cable Installation Electrical Power Supply Warranty Revision #1 February Airstream Grain Conditioning Systems