GSI Outdoors 2TAF, 2TFC Drying Chamber High-Level Rotary Switch Installation

Page 28

INSTALLATION

2000 Autoflow

Drying Chamber High-Level Rotary Switch Installation

1)Drill a 2” diameter hole through the roof panel at the location shown in figure 8.

See Component placement on page 9 for proper placement in relation to fill auger.

2)Use the mounting plate as a pattern and drill four 3/8” holes through the roof panel at the switch location so the plate can be bolted to the roof.

3)Attach the flex coupling to the rotary switch power pack using a roll pin.

4)Apply teflon tape or pipe sealant (not included) to the rotary switch power pak threads and thread the rotary switch power pack into the mounting plate coupling.

5)Make sure that the conduit hole is at

right angles with the roof panel ribs or facing towards the eave.

6)Caulk the underside of the mounting plate and on all sides of the 2” hole.

7)Bolt the assembly to the roof panel.

8)Attach the shaft extension according to figure 10.

9)Apply teflon tape or pipe sealant (not included) to the shaft guard.

10)Thread to underneath side of mounting plate.

11)Add the 1/4” drilled coupling to the shaft extension using the cotter pin.

12)Attach the 3-vane paddle to the flex coupling as shown in figure 10.

Figure 8

28

Image 28
Contents Series Autoflow Fan/Heater Control Installation Instructions Autoflow Table of Contents Roof WARNING, Operation & Safety Series 2000 Autoflow Installation & Operating InstructionsSafety Alert Symbol Roof Damage Warning and DisclaimerSafety Safety Precautions Use Caution Operation of this EquipmentSafety SIGN-OFF Sheet Installation Fan and Heater MountingTop Dry Bin Eave Height Autoflow Control Box MountingComponent Placement Series 2000 Autoflow Control Box Bolt Pattern Control BOX Mounting Fill System Control Box MountingFill System Control Box Bolt Pattern Actuator Control Box Mounting Bolt pattern to drill holes for the Actuator Control Box Multi-Grain Temperature Sensor Grain Temperature Sensor Mounted to Leveling Band Post Close-Up Detail of Grain Temperture Sensor Wiring Plenum Temperature Sensor Airswitch Installation Wet Supply Rotary Switch Installation Storage Chamber High Limit Rotary Switch Installation Installation Drying Chamber Rotary Switches Mounted in Bin Roof Drying Chamber Low-Level Rotary Switch Installation Installation Drying Chamber High-Level Rotary Switch Installation Installation Drying Chamber Overflow Rotary Switch Installation Installation Liquid Propane LP Natural Gas NG Electrical Power Supply Conduit Runs Control WiresPower/Motor Wires GroundingPower Supply Transformer and Wiring Voltage DropProper Installation of Ground Rod Machine to Earth GroundingTop Dry and ground rod attachment illustration POWER/MOTOR Wiring Main Power SchematicElectrical Load Information Wire Size Information Voltage HorsepowerFill System Control Box Electrical Load Information StarterElectrical Power Supply Autoflow to Master Fan/Heater Unit Interconnect Autoflow to Actuator Interconnect Autoflow to Wet Supply Rotary Switch Interconnect Autoflow to Storage Chamber Rotary Switch Inerconnect Electrial Power Supply Autoflow to Drying Chamber Rotary Switches InterconnectElectrial Power Supply Autoflow to Fill System Control Box Interconnect Autoflow to Ground Interconnect Master to Slave Interconnect Slave to Slave Interconnect Battery Hook-Up Dump Chute Cable Installation Electrical Power Supply Warranty Revision #1 February Airstream Grain Conditioning Systems