GSI Outdoors 2TFC, 2TAF installation instructions Table of Contents

Page 3

2000 Autoflow

TABLE OF CONTENTS

Roof Warning, Operation & Safety

4

Safety Alert Decals

5

Safety Precautions

6

Safety Sign-off Sheet

7

Fan/Heater and Control Box Mounting

8

Autoflow Control Box Bolt Pattern

10

Fill System Control Box Mounting

11

Fill System Control Bolt Pattern

12

Actuator Control Box Mounting

13

Multi-Grain Temperature Sensor Wiring

15

Grain Temperature Sensor Mounted to Leveling Band Post

16

Close-up of Grain Temperature Sensor Wiring

17

Plenum Temperature Sensor Installation

18

Airswitch Installation

19

Wet Supply Rotary Switch

21

Storage Chamber High Limit Rotary Switch Installation

22

Drying Chamber Rotary Switches

25

Drying Chamber Low-Level Rotary Switch Installation

26

Drying Chamber High-Level Rotary Switch Installation

28

Drying Chamber Overflow Switch Installation

30

LP Fuel Specifications and Recommendations

32

NG Fuel Specifications and Recommendations

33

Conduit Runs

34

Electrical Power Supply

35

Figure 12: Ground Rod

36

Power/Motor Wiring

37

Main Power Schematic

37

Electrical Load Information

38

Wire Size Information

39

Fill System Control Box Electrical Load Information

40

Autoflow to Master Fan/Heater Unit Interconnect

42

Autoflow to Actuator Interconnect

43

Autoflow to Wet Supply Rotary Switch Interconnect

44

Autoflow to Storage Chamber Rotary Switch Interconnect

45

Autoflow to Drying Chamber Rotary Switches Interconnect

46

Autoflow to Fill System Control Box Interconnect

48

Autoflow to Ground Interconnect

49

Master to Slave Interconnect

50

Slave to Slave Interconnect

51

Battery Hook-Up

52

Dump Chute Cable Installation

53

Warranty

55

3

Image 3
Contents Series Autoflow Fan/Heater Control Installation Instructions Autoflow Table of Contents Roof Damage Warning and Disclaimer Roof WARNING, Operation & SafetySeries 2000 Autoflow Installation & Operating Instructions Safety Alert SymbolSafety Use Caution Operation of this Equipment Safety PrecautionsSafety SIGN-OFF Sheet Autoflow Control Box Mounting InstallationFan and Heater Mounting Top Dry Bin Eave HeightComponent Placement Series 2000 Autoflow Control Box Bolt Pattern Fill System Control Box Mounting Control BOX MountingFill System Control Box Bolt Pattern Actuator Control Box Mounting Bolt pattern to drill holes for the Actuator Control Box Multi-Grain Temperature Sensor Grain Temperature Sensor Mounted to Leveling Band Post Close-Up Detail of Grain Temperture Sensor Wiring Plenum Temperature Sensor Airswitch Installation Wet Supply Rotary Switch Installation Storage Chamber High Limit Rotary Switch Installation Installation Drying Chamber Rotary Switches Mounted in Bin Roof Drying Chamber Low-Level Rotary Switch Installation Installation Drying Chamber High-Level Rotary Switch Installation Installation Drying Chamber Overflow Rotary Switch Installation Installation Liquid Propane LP Natural Gas NG Grounding Electrical Power SupplyConduit Runs Control Wires Power/Motor WiresMachine to Earth Grounding Power SupplyTransformer and Wiring Voltage Drop Proper Installation of Ground RodTop Dry and ground rod attachment illustration Main Power Schematic POWER/MOTOR WiringElectrical Load Information Voltage Horsepower Wire Size InformationStarter Fill System Control Box Electrical Load InformationElectrical Power Supply Autoflow to Master Fan/Heater Unit Interconnect Autoflow to Actuator Interconnect Autoflow to Wet Supply Rotary Switch Interconnect Autoflow to Storage Chamber Rotary Switch Inerconnect Autoflow to Drying Chamber Rotary Switches Interconnect Electrial Power SupplyElectrial Power Supply Autoflow to Fill System Control Box Interconnect Autoflow to Ground Interconnect Master to Slave Interconnect Slave to Slave Interconnect Battery Hook-Up Dump Chute Cable Installation Electrical Power Supply Warranty Revision #1 February Airstream Grain Conditioning Systems