GSI Outdoors
2TFC, 2TAF
installation instructions
Installation
Install
Main Power Schematic
Safety Alert Symbol
Conduit Runs Control Wires
Warranty
Battery Hook-Up
Multi-Grain Temperature Sensor
Component Placement
Safety Precautions
Safety
Page 27
2000 Autoflow
INSTALLATION
Figure 9
27
Page 26
Page 28
Image 27
Page 26
Page 28
Contents
Series Autoflow Fan/Heater Control Installation Instructions
Autoflow
Table of Contents
Roof Damage Warning and Disclaimer
Roof WARNING, Operation & Safety
Series 2000 Autoflow Installation & Operating Instructions
Safety Alert Symbol
Safety
Use Caution Operation of this Equipment
Safety Precautions
Safety SIGN-OFF Sheet
Autoflow Control Box Mounting
Installation
Fan and Heater Mounting
Top Dry Bin Eave Height
Component Placement
Series 2000 Autoflow Control Box Bolt Pattern
Fill System Control Box Mounting
Control BOX Mounting
Fill System Control Box Bolt Pattern
Actuator Control Box Mounting
Bolt pattern to drill holes for the Actuator Control Box
Multi-Grain Temperature Sensor
Grain Temperature Sensor Mounted to Leveling Band Post
Close-Up Detail of Grain Temperture Sensor Wiring
Plenum Temperature Sensor
Airswitch
Installation
Wet Supply Rotary Switch
Installation
Storage Chamber High Limit Rotary Switch Installation
Installation
Drying Chamber Rotary Switches Mounted in Bin Roof
Drying Chamber Low-Level Rotary Switch Installation
Installation
Drying Chamber High-Level Rotary Switch Installation
Installation
Drying Chamber Overflow Rotary Switch Installation
Installation
Liquid Propane LP
Natural Gas NG
Grounding
Electrical Power Supply
Conduit Runs Control Wires
Power/Motor Wires
Machine to Earth Grounding
Power Supply
Transformer and Wiring Voltage Drop
Proper Installation of Ground Rod
Top Dry and ground rod attachment illustration
Main Power Schematic
POWER/MOTOR Wiring
Electrical Load Information
Voltage Horsepower
Wire Size Information
Starter
Fill System Control Box Electrical Load Information
Electrical Power Supply
Autoflow to Master Fan/Heater Unit Interconnect
Autoflow to Actuator Interconnect
Autoflow to Wet Supply Rotary Switch Interconnect
Autoflow to Storage Chamber Rotary Switch Inerconnect
Autoflow to Drying Chamber Rotary Switches Interconnect
Electrial Power Supply
Electrial Power Supply
Autoflow to Fill System Control Box Interconnect
Autoflow to Ground Interconnect
Master to Slave Interconnect
Slave to Slave Interconnect
Battery Hook-Up
Dump Chute Cable Installation
Electrical Power Supply
Warranty
Revision #1 February
Airstream Grain Conditioning Systems
Related pages
All Install page
Installera programmet for Samsung LU28H750UQUXEN
Hardware installeren for Belkin F8E845ea
Installing Blower Assembly GA3450T for Desa CF26NR
Instructions for the Installer for Zanussi ZRB 8441 W
Installation and Operation for Extron electronic VYC 100P
Flow of installation for Sanyo POA-PN02
Installation for ASRock A75 Pro4-M
Install the inlet tube as follows for System Sensor DH100ACDCP
Installing the Battery for Sanyo SCP-2700
Removing and Installing the Heat Sink for Dell T320
What types of valves can be used in Control4 wiring installations?
Check this out
Top
Page
Image
Contents