Electrical

Electrical

Manual backgroundCAUTION

Electrostatic discharge can affect electronic com- ponents. Take precautions during furnace installa- tion and service to protect the furnace’s electronic controls. Precautions will help to avoid control ex- posure to electrostatic discharge by putting the fur- nace, the control and the technician at the same electrostatic potential. Neutralize electrostatic charge by touching hand and all tools on an un- painted unit surface, such as the gas valve or blow- er deck, before performing any service procedure.

Refer to figure 15, 16, and 17 for field wiring and figures 18 and 19 for schematic wiring diagram and troubleshooting.

1 − Select circuit protection and wire size according to re- quirements listed on unit rating plate.

2 − Install a separate disconnect switch (protected by ei- ther fuse or circuit breaker) near the unit so power can be turned off for servicing.

3 − Make power supply wire connections at unit make-up boxes (both left and right side boxes are provided).

4 − Install the room thermostat according to the instruc- tions provided with the thermostat and make connec- tions according to the appropriate field wiring diagram. Install a field-provided 150 ohm, 10 watt re- sistor (Lennox part number P−8−6256) in two-stage applications when using an electro-mechanical ther- mostat.

5 − All applications require a control transformer to power the furnace’s 24 volt circuit. In all applications except

those where a 208/230 volt power supply is used, an autotransformer is required to power each of the in- duced draft blowers. These transformer(s) are pro- vided in the drive kit which has been selected for use with the furnace. Transformer part numbers and volt- ages are given in table 10.

Install the transformer(s) in the control box using the holes pre-drilled for them.

Select a field wiring diagram according to the power supply voltage and phase being used (see figure 15, 16, or 17), and make the wiring connections between the transformers and the furnace.

6 − Select a field wiring diagram according to the power supply voltage and phase being used (see figure 15, 16, or 17), and make wiring connections between the blower motor and the furnace. The connecting wires are provided in the drive kit.

7 − An accessory relay (K109) is provided with the G24−200 furnace. Any accessory with a rated voltage equal to the supply voltage can be connected to termi- nal . The relay is energized with the

blower.

8 − To add an accessory which is energized on a heating demand (such as a humidifier), a relay with coil wired to terminal

ed.

9 − The

mizer connection. See the field wiring diagrams.

10−Electrically ground the unit according to local codes or, in the absence of local codes, according to the current National Electric Code (ANSI/NFPA No. 70) for the USA or current Canadian Electric Code part 1 (CSA standard C22.1) for Canada.

TABLE 10

DRIVE KIT TRANSFORMER VOLTAGES AND PART NUMBERS

 

Furnace

**Induced Draft Blower Autotransformers

 

Control Circuit Transformer

 

Drive Kit

Supply

 

 

 

 

 

 

 

 

 

 

Transformer

Wiring

 

 

 

 

Wiring

 

 

 

Voltage,

Input

Output

Transformer

Primary

 

Secondary-

Model No.

 

Part Number

Diagram

Diagram

 

Phase,

 

Voltage

Voltage

Part Number

Voltage

 

Voltage

 

 

 

& (Quantity)

Designation

Designation

 

 

Frequency

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DKG24−200−1

120v,

54G5201*

T3, T13

115*

230*

LB−66256G

 

T1

120

 

24

1ph, 60hz

(2)

(99K0601)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DKG24−200−2

208/230v,

− − − −

− − − −

− − − −

− − − −

LB−66256G

 

T1

208 or 240

 

24

1ph, 60hz

(99K0601)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DKG24S−200−3,

208/230v,

− − − −

− − − −

− − − −

− − − −

LB−66256K

 

T1

208 or 240

 

24

DKG24−200−6

3ph, 60hz

(13H2801)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DKG24S−200−4,

460v,

54G5201

T3, T13

460

230

LB−66256H

 

T1

480

 

24

DKG24−200−7

3ph, 60hz

(2)

(51H7901)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DKG24S−200−5,

575v,

54G3101

T3, T13

575

230

LB−66256J

 

T1

600

 

24

DKG24−200−8

3ph, 60hz

(2)

(66J5401)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*Note − This transformer has a nominal 230 volt output rating and a 460 volt input rating; however, when wired to the furnace as shown in figure 15, a 115 volt input will produce a 230 volt output.

**Note − The induced draft blowers are rated at 230 volts, single phase, 60 hz.

Page 27

Image 27
Contents WHAT TO DO IF YOU SMELL GAS INSTALLATION INSTRUCTIONS G24-2002P0805 P504613MPage G24−200 Unit Dimensions − inches mmTOP VIEW G24−200 Filter Box Dimensions − inches mmSIDE VIEW BACK VIEWG24−200 Parts Arrangement G24−200 HEAT SECTION AND CABINETPage G24−200 Parts Arrangement Continued G24−200 BLOWER SECTIONPage Safety G24−200 Gas FurnaceShipping and Packing List setting Combustion, Dilution & Ventilation Air GeneralCements and glues EQUIPMENT IN CONFINED SPACE ALL AIR FROM INSIDE Return Air Plenum / Filter Box Installation Setting EquipmentPage BOTTOM RETURN AIR FILTER BOX INSTALLATIONDuct System Blower Motor / Drive InstallationVenting Venting Using a Masonry Chimney Page Page Page SERVING A SINGLE CATEGORY I APPLIANCEPage SERVING A SINGLE CATEGORY I APPLIANCECOMMON VENT CAPACITY VENT CONNECTOR CAPACITYSERVING TWO OR MORE CATEGORY I APPLIANCES SERVING TWO OR MORE CATEGORY I APPLIANCESPage CARBON MONOXIDE POISONING HAZARD FOR INSTALLATIONS IN THE USA AND CANADA VENT TERMINATION CLEARANCESPage Horizontal Venting Gas Piping FIRE OR EXPLOSION HAZARD Electrical Alternate make-up G24−200 FIELD WIRING DIAGRAM 120V SINGLE PH 60HZAlternate make-up box right sideG24-200FIELD WIRING DIAGRAM Alternate make-up G24−200 FIELD WIRING DIAGRAMG UNITS − 460V 3PH 60HZ J UNITS − 575V 3PH 60HZFIGURE Page G UNITS − 460V 3PH 60HZ WIRING SCHEMATIC DIAGRAM FOR G24−200P UNITS − 208/230V 1PH 60 HZ Y UNITS − 208/230V 3PH 60HZUnit Start−Up Heating Sequence of Operation Gas Pressure Adjustment Other Unit Adjustments and OperationHigh Altitude Information Temperature Rise Setting blower CFM TABLE ACCESSORY AIR RESISTANCE TABLE DRIVE KIT SPECIFICATIONSPage G24−200 Start−up and Performance Check List Repair Parts ListPage TroubleshootingNORMAL HEATING MODE ABNORMAL HEATING MODELED CODES 3 − OFF NO POWER OR DETECTED FAULTNORMAL HEATING MODE ABNORMAL HEATING MODEPOWER ON THERMOSTAT CALLS FOR HEAT W1 ENERGIZED IS THE S10 S99 HIGH LIMIT CLOSED? YES MANUAL FAN OPERATION COOLING SEQUENCE OF OPERATIONFOR TWO CONDENSING UNITS FOR A SINGLE CONDENSING UNIT