New Buck Corporation DV1000 manual

Page 2
Image 2
Contents Approved By DV1000ZERO CLEARANCE DIRECT VENT GAS FIREPLACE Page TABLE OF CONTENTS Page INTRODUCTION AND SAFETY FOR INSTALLATION AND OPERATIONDV1000 FIREBOX COVER DOOR REMOVAL INSTRUCTIONS LOUVER ASSEMBLY 1. TOP LOUVER ASSEMBLY2. BOTTOM LOUVER ASSEMBLY VER ASSEMBLY CLIP TO SECURE TO STOVE BODY16-15/16” 2-1/2” 6” DV1000 SPECIFICATIONS38-1/8” 36” 33-1/2” TOP STANDOFFS SIDE STANDOFFS 27-1/8” 13-9/16”2-1/2” MINIMUM FRAMING DIMENSIONS40-1/8” 36-1/8VENT TERMINAL CLEARANCES PageDETERMINING THE LOCATION FOR DV1000 INSTALLATION INSTRUCTIONS DV1000 DIRECT VENT TERMINATIONPRE-INSTALLATIONINFORMATION PIPE INSTALLATIONOUTER 7” VENT PIPE INNER 4” FLUE PIPE 9-1/2”WALL CORNER TERMINATION WITH OPTIONAL REAR VENTFIGURE 8/ OPTIONAL REAR VENT TER MINATION EXAMPLEMINIMUM INSTALLATION MAXIMUM INSTALLATIONDV1000 STANDARD VERTICAL CHASE TERMINATION INSTALLATIONSVERTICAL TERMINATION CAP ASSEMBLY 30FT MAXREMOVABLE INNER BOTTOM PAN ASSEMBLY GAS SUPPLY CONNECTION INSTALLING GAS PIPING TO APPLIANCEInstallation Items Needed CHECK GAS TYPEPressure Testing Gas Supply Piping System Test Pressures In Excess of 1/2 PSIG 3.5 kPaDV1000 LOG PLACEMENT ance of the heaterWARNING Failure to position the parts in accordance with these diagrams or failure to use only parts specifically approved with this heater may result in property damage or personal injury FOR YOUR SAFETY READ BEFORE LIGHTING WHAT TO DO IF YOU SMELL GASLIGHTING INSTRUCTIONS TO TURN OFF GAS TO APPLIANCE WIRING DIAGRAM SERVICING REPAIR PARTSCLEANING AND MAINTENANCE LOGS BURNER PAN ASSEMBLYVENTURA ASSEMBLY Air Shutter Slot Opening EMBERSPOSSIBLE CAUSE TROUBLESHOOTINGOBSERVED PROBLEM REMEDYDiagram, page Burner does not light after pilot is litContinued TROUBLESHOOTINGMaintenance, page Gas leak. See Warning statementKEY# REPLACEMENT PARTSSERVICING PART DESCRIPTIONON/OFF/MANUAL PageADDITIONAL REPLACEMENT PARTS PROCEDURE WARRANTYWARRANTY CONDITIONS AND EXCLUSIONSOTHER RIGHTS Page