New Buck Corporation DV1000 manual Lighting Instructions

Page 24
LIGHTING INSTRUCTIONS

LIGHTING INSTRUCTIONS

1.STOP! Read the safety information on this label.

2.“Set the thermostat to lowest setting.”

3.“Turn off all electric power to the appliance.”

4.Open access cover door.

5. Turn control knob clockwise

to the “OFF” position.

CONTROL KNOB

TUO

NI

P

 

TOLI

 

NOTE: Knob cannot be turned from “PILOT” to “OFF” unless knob is pushed in slightly.

DO NOT FORCE.

6.“Wait five (5) minutes” to clear out any gas. Then smell for gas, including near the floor. If you smell gas, STOP! Follow “B” in the safety information label. If you don’t smell gas, go to the next step.

7.Pilot is located between the front and rear burner.

8.Turn control knob counter clockwise Manual background to the “Pilot” position.

9.Press in control knob. With control knob pressed in, immediately push and release ignitor

button. This will light the pilot.

NOTE: * If the knob does not pop up when released, “Stop” and immediately call your service technician or gas supplier.

*“If the pilot will not stay lit after several tries, turn the gas control knob to “OFF” and call your service technician or gas supplier.”

10.Continue to hold the control knob pressed in for one (1) minute after the pilot is lit. Release the control knob and it will pop back up. Pilot should remain lit. If it goes out, repeat steps 5 thru 10.

11.Turn control knob counter clockwise Manual background to “ON” position.

12.Close access cover door.

13.Turn on all electric power to the appliance.

Page 21

Image 24
Contents DV1000 ZERO CLEARANCE DIRECT VENT GAS FIREPLACEApproved By Page TABLE OF CONTENTS Page INTRODUCTION AND SAFETY FOR INSTALLATION AND OPERATIONDV1000 FIREBOX COVER DOOR REMOVAL INSTRUCTIONS 1. TOP LOUVER ASSEMBLY 2. BOTTOM LOUVER ASSEMBLYLOUVER ASSEMBLY VER ASSEMBLY CLIP TO SECURE TO STOVE BODYDV1000 SPECIFICATIONS 38-1/8” 36” 33-1/2”16-15/16” 2-1/2” 6” TOP STANDOFFS SIDE STANDOFFS 27-1/8” 13-9/16”MINIMUM FRAMING DIMENSIONS 40-1/8”2-1/2” 36-1/8VENT TERMINAL CLEARANCES PageDETERMINING THE LOCATION FOR DV1000 INSTALLATION INSTRUCTIONS DV1000 DIRECT VENT TERMINATIONPRE-INSTALLATIONINFORMATION PIPE INSTALLATIONOUTER 7” VENT PIPE INNER 4” FLUE PIPE CORNER TERMINATION WITH OPTIONAL REAR VENT FIGURE 8/ OPTIONAL REAR VENT TER9-1/2”WALL MINATION EXAMPLEMINIMUM INSTALLATION MAXIMUM INSTALLATIONINSTALLATIONS VERTICAL TERMINATION CAP ASSEMBLYDV1000 STANDARD VERTICAL CHASE TERMINATION 30FT MAXREMOVABLE INNER BOTTOM PAN ASSEMBLY INSTALLING GAS PIPING TO APPLIANCE Installation Items NeededGAS SUPPLY CONNECTION CHECK GAS TYPEPressure Testing Gas Supply Piping System Test Pressures In Excess of 1/2 PSIG 3.5 kPaDV1000 LOG PLACEMENT ance of the heaterWARNING Failure to position the parts in accordance with these diagrams or failure to use only parts specifically approved with this heater may result in property damage or personal injury FOR YOUR SAFETY READ BEFORE LIGHTING WHAT TO DO IF YOU SMELL GASLIGHTING INSTRUCTIONS TO TURN OFF GAS TO APPLIANCE WIRING DIAGRAM SERVICING REPAIR PARTSCLEANING AND MAINTENANCE BURNER PAN ASSEMBLY VENTURA ASSEMBLY Air Shutter Slot OpeningLOGS EMBERSTROUBLESHOOTING OBSERVED PROBLEMPOSSIBLE CAUSE REMEDYDiagram, page Burner does not light after pilot is litTROUBLESHOOTING Maintenance, pageContinued Gas leak. See Warning statementREPLACEMENT PARTS SERVICINGKEY# PART DESCRIPTIONON/OFF/MANUAL PageADDITIONAL REPLACEMENT PARTS WARRANTY WARRANTYPROCEDURE CONDITIONS AND EXCLUSIONSOTHER RIGHTS Page