New Buck Corporation DV1000 Replacement Parts, Servicing, Key#, Part Description, Part Number

Page 33
REPLACEMENT PARTS

SERVICING

Repair and replacement work should only be done by a qualified service person.

Always shut off the gas supply and make sure that heater is cool before beginning any service operation. Always check for gas leaks after servicing.

REPLACEMENT PARTS

A parts list with exploded view follows. Always include correct name, part number, and model number of the heater when ordering service parts.

KEY#

PART DESCRIPTION

PART NUMBER

1.

S.I.T. PILOT (L.P.) ASSEMBLY

PE 199615

1.

S.I.T. PILOT (NAT) ASSEMBLY

PE 199616

2.

GENERATOR

PE 240002

3.

1/8" PILOT TUBE

MF 1812 ALMTUB

4.GENERATOR WIRE

5.

BURNER PAN

MA DV1000-BP

6.ORIFICES

 

L.P.

PO 150MVORF

 

N.G.

PO 046MVORF

7.

3/8" COMPRESSION NUT W/ SLEEVE

PH 616 & PH 606

8.

3/8" FLEXIBLE BURNER SUPPLY TUBE

 

1 piece 6"

PO T6-06

9.

12" SWITCH WIRES

PE 12JUMPER

10.CARLING SWITCH

 

(AUTO/OFF/MANUAL)

PE RC211RB

11.

PIEZO STRIKER

PE 124461

12.

S.I.T. 24" IGNITOR WIRE

PE 028515

13

VENTURA ASSEMBLY

PO DVVEN1

14.

THERMO-COUPLE

PE 290136

16.

820 S.I.T. MV. VALVE

LP - PE 820633

 

 

NAT - PE 820634

17.

BALL VALVE

PO 110-553

18.

BLACK IRON UNION

PO 124BINIP

19.

PINE LOG SET (FIBER)

PO DV1000LG-PINE

20.

OAK LOG SET (CERAMIC)

PO DV1000LG-OAK

Page 30

Image 33
Contents DV1000 ZERO CLEARANCE DIRECT VENT GAS FIREPLACEApproved By Page TABLE OF CONTENTS Page INSTALLATION AND OPERATION INTRODUCTION AND SAFETY FORDV1000 FIREBOX COVER DOOR REMOVAL INSTRUCTIONS 2. BOTTOM LOUVER ASSEMBLY 1. TOP LOUVER ASSEMBLYLOUVER ASSEMBLY VER ASSEMBLY CLIP TO SECURE TO STOVE BODY38-1/8” 36” 33-1/2” DV1000 SPECIFICATIONS16-15/16” 2-1/2” 6” TOP STANDOFFS SIDE STANDOFFS 27-1/8” 13-9/16”40-1/8” MINIMUM FRAMING DIMENSIONS2-1/2” 36-1/8Page VENT TERMINAL CLEARANCESDETERMINING THE LOCATION FOR DV1000 DV1000 DIRECT VENT TERMINATION INSTALLATION INSTRUCTIONSPIPE INSTALLATION PRE-INSTALLATIONINFORMATIONOUTER 7” VENT PIPE INNER 4” FLUE PIPE FIGURE 8/ OPTIONAL REAR VENT TER CORNER TERMINATION WITH OPTIONAL REAR VENT9-1/2”WALL MINATION EXAMPLEMAXIMUM INSTALLATION MINIMUM INSTALLATIONVERTICAL TERMINATION CAP ASSEMBLY INSTALLATIONSDV1000 STANDARD VERTICAL CHASE TERMINATION 30FT MAXREMOVABLE INNER BOTTOM PAN ASSEMBLY Installation Items Needed INSTALLING GAS PIPING TO APPLIANCEGAS SUPPLY CONNECTION CHECK GAS TYPETest Pressures In Excess of 1/2 PSIG 3.5 kPa Pressure Testing Gas Supply Piping Systemance of the heater DV1000 LOG PLACEMENTWARNING Failure to position the parts in accordance with these diagrams or failure to use only parts specifically approved with this heater may result in property damage or personal injury WHAT TO DO IF YOU SMELL GAS FOR YOUR SAFETY READ BEFORE LIGHTINGLIGHTING INSTRUCTIONS TO TURN OFF GAS TO APPLIANCE WIRING DIAGRAM REPAIR PARTS SERVICINGCLEANING AND MAINTENANCE VENTURA ASSEMBLY Air Shutter Slot Opening BURNER PAN ASSEMBLYLOGS EMBERSOBSERVED PROBLEM TROUBLESHOOTINGPOSSIBLE CAUSE REMEDYBurner does not light after pilot is lit Diagram, pageMaintenance, page TROUBLESHOOTINGContinued Gas leak. See Warning statementSERVICING REPLACEMENT PARTSKEY# PART DESCRIPTIONPage ON/OFF/MANUALADDITIONAL REPLACEMENT PARTS WARRANTY WARRANTYPROCEDURE CONDITIONS AND EXCLUSIONSOTHER RIGHTS Page