New Buck Corporation DV1000 manual Removable Inner Bottom Pan Assembly

Page 18
REMOVABLE INNER BOTTOM PAN ASSEMBLY

REMOVABLE INNER BOTTOM PAN ASSEMBLY

The DV1000 is equip with a removable Inner Bottom Pan Assembly for service purposes only. The burner control assembly should only be accessed by this procedure by a qualified service technician, or by the manufacturer. Follow the instructions and diagrams below.

1.

Turn gas OFF at equipment shut OFF

2

 

valve, and disconnect union located at

 

Right side of control valve. Remove

3

 

Cover Door, see pages 3 & 4.

 

2.

Remove the 4 screws located on top of

 

 

the Burner Pan area which attach the

 

 

Burner Pan to the Firebox Deck.

 

3.

Remove the 4 screws located at the

 

 

back of the Firebox area which attach

 

 

the Firebox Deck to the back of the

 

 

Firebox.

 

4.

Lift the Firebox Deck upward and out-

 

 

wards. And then gently lift the Burner

 

 

and Ventura assembly upward from

 

 

top of the Orifice assembly.

4

5.

Next locate the 26 screws pattern

 

around the edge of the Inner Bottom

 

 

Pan Assembly and remove them.

 

6.

Push upward from the bottom of the

 

 

Inner Bottom Pan ( do not

 

REV. DATE

DATE

Manual backgroundManual background 5

push on the gas valve control or any of the other components).

7.A gasket is located on the bottom edges of the Inner Bottom Pan assembly. If this gasket is damaged during this process it must be replaced with a gasket from the manufacture and

resealed with high-temperature caulk weather damaged or

6

7

FIGURE 12

Page 15

Image 18
Contents DV1000 ZERO CLEARANCE DIRECT VENT GAS FIREPLACEApproved By Page TABLE OF CONTENTS Page INTRODUCTION AND SAFETY FOR INSTALLATION AND OPERATIONDV1000 FIREBOX COVER DOOR REMOVAL INSTRUCTIONS LOUVER ASSEMBLY 1. TOP LOUVER ASSEMBLY2. BOTTOM LOUVER ASSEMBLY VER ASSEMBLY CLIP TO SECURE TO STOVE BODY16-15/16” 2-1/2” 6” DV1000 SPECIFICATIONS38-1/8” 36” 33-1/2” TOP STANDOFFS SIDE STANDOFFS 27-1/8” 13-9/16”2-1/2” MINIMUM FRAMING DIMENSIONS40-1/8” 36-1/8VENT TERMINAL CLEARANCES PageDETERMINING THE LOCATION FOR DV1000 INSTALLATION INSTRUCTIONS DV1000 DIRECT VENT TERMINATIONPRE-INSTALLATIONINFORMATION PIPE INSTALLATIONOUTER 7” VENT PIPE INNER 4” FLUE PIPE 9-1/2”WALL CORNER TERMINATION WITH OPTIONAL REAR VENTFIGURE 8/ OPTIONAL REAR VENT TER MINATION EXAMPLEMINIMUM INSTALLATION MAXIMUM INSTALLATIONDV1000 STANDARD VERTICAL CHASE TERMINATION INSTALLATIONSVERTICAL TERMINATION CAP ASSEMBLY 30FT MAXREMOVABLE INNER BOTTOM PAN ASSEMBLY GAS SUPPLY CONNECTION INSTALLING GAS PIPING TO APPLIANCEInstallation Items Needed CHECK GAS TYPEPressure Testing Gas Supply Piping System Test Pressures In Excess of 1/2 PSIG 3.5 kPaDV1000 LOG PLACEMENT ance of the heaterWARNING Failure to position the parts in accordance with these diagrams or failure to use only parts specifically approved with this heater may result in property damage or personal injury FOR YOUR SAFETY READ BEFORE LIGHTING WHAT TO DO IF YOU SMELL GASLIGHTING INSTRUCTIONS TO TURN OFF GAS TO APPLIANCE WIRING DIAGRAM SERVICING REPAIR PARTSCLEANING AND MAINTENANCE LOGS BURNER PAN ASSEMBLYVENTURA ASSEMBLY Air Shutter Slot Opening EMBERSPOSSIBLE CAUSE TROUBLESHOOTINGOBSERVED PROBLEM REMEDYDiagram, page Burner does not light after pilot is litContinued TROUBLESHOOTINGMaintenance, page Gas leak. See Warning statementKEY# REPLACEMENT PARTSSERVICING PART DESCRIPTIONON/OFF/MANUAL PageADDITIONAL REPLACEMENT PARTS PROCEDURE WARRANTYWARRANTY CONDITIONS AND EXCLUSIONSOTHER RIGHTS Page