- Table of Contents -
Section 1: Listing and Code Approvals |
| |
| A. Appliance Certification | 4 |
| B. Glass Specifications | 4 |
| C. BTU Specifications | 4 |
| D. High Altitude Installations | 5 |
| E. | 5 |
| F. Combustible Materials Specification | 5 |
Section 2: | Getting Started |
|
| A. Design and Installation Considerations | 6 |
| B. Negative Pressure | 7 |
| C. Tools and Supplies Needed | 8 |
| D. Inspect Appliance and Components | 8 |
Section 3: Framing and Clearances |
| |
Î | A. Selecting Appliance Location | 9 |
Î | B. Constructing the Appliance Chase | 10 |
| C. Clearances | 10 |
| D. Mantel Projections | 11 |
Section 4: | Termination Locations |
|
| A. Vent Termination Minimum Clearances | 12 |
Section 5: Vent Information and Diagrams |
| |
| A. Vent Guidelines | 13 |
| B. Vent System Configuration | 13 |
Section 6: Vent Clearances and Framing |
| |
| A. Pipe Clearances to Combustibles | 15 |
| B. Wall Penetration Framing | 15 |
| C. Vertical Penetration Framing | 15 |
Section 7: | Appliance Preparation |
|
| A. Installing Outside Air Kit Damper Assembly.. | 16 |
| B. Gas/Electrical Connections | 16 |
| C. Securing and Leveling Appliance | 17 |
Section 8: Installing Vent Pipe |
| |
| A. Assembly of Vent Sections | 18 |
| B. Attaching Vent to Firebox | 18 |
| C. Securing Vent Sections | 18 |
Section 9: | Gas Information |
|
| A. Fuel Conversions | 19 |
| B. Gas Pressures | 19 |
| C. Gas Connection | 19 |
Section 10: | Electrical Information |
| |
| A. Recommendation for Wire | 21 | |
| B. Connecting to the Appliance | 21 | |
| C. Intellifire Ignition System Wiring | 21 | |
| D. Standing Pilot Ignition System Wiring | 22 | |
| E. Junction Box Installation | 23 | |
| F. | Wall Switch Installation for Fan | 23 |
Section 11: | Finishing |
| |
| A. Mantel Projections | 24 | |
| B. | Facing Material | 24 |
Section 12: | Appliance Setup |
| |
| A. Remove Shipping Materials | 25 | |
| B. Remove Grate Shipping Support | 25 | |
| C. Clean the appliance | 25 | |
| D. Accessories | 25 | |
| E. Install the Refractory | 25 | |
| F. Lava Rock, Vermiculite, Rockwool |
| |
|
| and Ember Placement | 25 |
| G. Positioning the Logs | 26 | |
| H. Glass Assembly | 30 | |
| I. | Screen Mesh | 30 |
| J. | Grilles and Trim | 30 |
| K. Hood | 30 | |
| L. Shutter Settings | 30 | |
Section 13: | Operating Instructions |
| |
| A. Before Lighting Appliance | 31 | |
| B. Check Appliance Draft | 31 | |
| B. Lighting Appliance | 32 | |
| C. After Appliance is Lit | 34 | |
| D. Frequently Asked Questions | 34 | |
Section 14: | Troubleshooting |
| |
| A. Standing Pilot Ignition System | 35 | |
| B. Intellifire Ignition System | 37 | |
Section 15: | Maintaining and Servicing Appliance | 39 | |
Section 16: | Reference Materials |
| |
| A. Appliance Dimension Diagram | 41 | |
| B. Service Parts | 42 | |
| C. Warranty | 52 | |
| D. Contact Information | 53 |
Heat & Glo • | 3 |