Heat & Glo LifeStyle 550TRSI-AUF owner manual Getting Started, Typical Appliance System

Page 18

4 Getting Started

Installer Guide

 

A. Typical Appliance System

NOTICE: Illustrations and photos reflect typical installations and are for design purposes only. Illustrations/diagrams are not drawn to scale. Actual product may vary from pictures in manual

Note: Dual venting configurations ARE NOT allowed. Appliance MUST be vented EITHER vertically OR horizontally.

NON-COMBUSTIBLE ROOF FLASHING

MAINTAINS MINIMUM CLEARANCE

AROUND PIPE (SECTION 10.G)

VENT PIPE (SECTIONS 7 and 8)

CEILING FIRESTOP ON FLOOR OF ATTIC (SECTION 8.C)

FRAMING/HEADER (SECTION 5.B)

GAS LINE (SECTION 11)

HORIZONTAL

TERMINATION CAP (SECTION 10.L )

VERTICAL TERMINATION CAP (SECTION 10.I)

STORM COLLAR (SECTION 10.H)

VENT PIPE PENETRATES ROOF

PREFERABLY WITHOUT AFFECTING

ROOF RAFTERS (SECTION 8.C)

ATTIC INSULATION SHIELD (NOT SHOWN) MUST BE USED HERE TO KEEP INSULATION AWAY FROM VENT PIPE IF ATTIC IS INSULATED (SECTION 8.D)

FRAMING HEADED OFF IN CEILING JOISTS (SECTION 8.C)

REQUIRED ISOLATION SWITCH: AS5601

LOCATION WITHIN 1 METRE OF FIREPLACE,

SUBJECT TO MANTEL PIECE, ETC. CHECK

TO ENSURE IT REMAINS CLEAR ON ANY

MANTEL PIECE INSTALLATION.

OPTIONAL

 

WALL SWITCH

 

SECTION 12.C.

 

HEATER MUST BE INSTALLED AND

MANTEL AND

FLUE PENETRATION COMPLETE

MANTEL LEG

PRIOR TO FINISH SHEETING

(SECTION 5.D)

 

SURROUND

 

HEARTH EXTENSION

Figure 4.1 Typical System

18

Heat & Glo • 550TRSI-AUF, 550TRSILP-AUF2079-980 Rev. N • 5/12

 

Image 18
Contents What to do if you smell gas Models 550TRSI-AUF 550TRSILP-AUFRef No GSCS20163 Sans 15392008 AS45532008 Hot glass will cause burnsModels 550TRSI-AUF, 550TRSILP-AUF Congratulations Homeowner Reference InformationNovida Testing Service Sans ComplianceSans Table of Contents User GuideGas Information Appliance SetupTroubleshooting Electrical InformationAustralian Warranty Information Limited Lifetime WarrantyOther Rights This warranty is void if PerthListing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Fan Kit Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceLighting Instructions IPI Final inspection byNine Hour Safety Shutdown Feature Control Module OperationFrequently Asked Questions After Fireplace is LitMaintenance and Service Logs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMinimum Framing Dimensions Mantel and Wall Projections Combustible MantelsCombustible Mantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesMIN. Clearance in. mm ClearanceVent Information and Diagrams Top Vent Horizontal Termination V1 Minimum H1 MaximumTop Vent Horizontal Termination Two Elbows Minimum + H 2 MaximumThree Elbows Min MaxTop Vent Vertical Termination Straight Up Vertical Flue SystemFlue System Approvals And Installations Flue Termination ApprovalsTop Vent Vertical Termination Two Elbows H1 Maximum V1 + V2 MinTop Vent Vertical Termination Three Elbows H1 + H2 V1 + V2 Minimum H1 + H2 MaximumRear Vent Horizontal Termination No Elbow One 45º ElbowH1 Minimum H1 Maximum Rear Vent Horizontal Termination Two Elbows H3H2Rear Vent Vertical Termination One Elbow Two Elbows Minimum MaximumV1 Minimum H1 + H2 Maximum Rear Vent Vertical Termination Three Elbows Maximum Minimum + H 2 MaximumMinimum + H 2 + H Maximum Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration Framing Non-Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPFlat Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-Zone-240V Kit Vaulted Ceiling InstallationAppliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outInstalling the Non-combustible Board Securing and Leveling the ApplianceAdjustments And Replacement Parts Components Removal For ServiceParts Replacement Install Trim and/or SurroundAssemble Vent Sections DVP Pipe Only Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Support Brackets Install FirestopsFor Horizontal Terminations using the SLP-TRAP2 or DVP-TRAP2 Flue TerminationInstall Metal Roof Flashing Heat Shield Requirements for Horizontal TerminationAssemble and Install Storm Collar Install Vertical Termination CapGas Information Gas ConnectionGAS Access Optional Accessories Requirements Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Remote Control Receiver LocationBlower Fireplace Specific Information Kit ContentsInstallation Precautions IntroductionChanging Temperature Scale Installation of Remote Control HousingAUX300CE Module Installation Fan InstallationProgramming the RC300AU to the Control Module Display Screen Idle When Remote is in on ModeStandby mode Function ButtonsAdjusting Flame Height About on ModeAbout OFF Mode Adjusting Fan SpeedSetting the Child Lock Adjusting ThermostatAdjusting Timer Power OutageFrequently Asked Questions/Troubleshooting Symptom Possible Cause Corrective ActionFinishing Facing Material816 940 Clean the Appliance Appliance SetupRemove Fixed Glass Assembly AccessoriesLog Placement Instructions 3 4 5 6 7Heat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Heat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Troubleshooting Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters Maintenance Tasks Inspect Maintenance TasksVent Components Diagrams DVP-AS2Mm Heat Shield 15-1/8 384 mm Effective LengthHorizontal Termination Cap DVP-HRC-SS DVP-HRC-ZC-SS Elbow 165 mm165 mm 222 mm 235 mm 152 mm 168 mm 251 mmCathedral Ceiling Heat Shield 15-1/8 384 mmEffective HorizontalService Parts Log Set Assembly#19 Valve Assembly Beginning Manufacturing Date July Ending Manufacturing DateService Parts List Conversion KitsContact Information