Heat & Glo LifeStyle 550TRSI-AUF owner manual Service Parts, Log Set Assembly

Page 77

D. Service Parts

550TRSI-AUF, 550TRSILP-AUF

32” Direct Vent Fireplace

Beginning Manufacturing Date: July 2010

 

Ending Manufacturing Date: ______

Log Set Assembly

 

 

 

3

 

 

1

 

 

 

 

 

9

 

 

7

4

 

 

2

8

 

 

 

10

 

5

 

6

 

 

 

 

11

 

 

 

 

 

 

 

 

 

 

12

 

 

 

 

13

 

 

 

 

 

14

17

18

 

 

 

 

 

 

 

15

 

 

 

 

 

16

 

 

IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement parts for your appliance please provide model number and serial number. All parts listed in this manual may be ordered from an authorized dealer.

ITEM

DESCRIPTION

COMMENTS

PART NUMBER

 

Log Set Assembly

 

LOGS-550TRSAUD

1

Log #1

 

SRV550-715

2

Log #2

 

SRV347-703

3

Log #3

 

SRV349-704

4

Log #4

 

SRV278-705

5

Log #5

 

SRV540-704

6

Log #6

 

SRV550-718

7

Log #7

 

SRV484-703

8

Log #8

 

SRV347-701

9

Grate Assembly

 

2021-007

10

Base Pan

 

550-117

 

Burner Assembly N

 

2079-010

11

Burner Assembly P

 

2079-012

 

Burner Assembly B

 

2079-014

12

Glass Assembly

 

GLA-550TRS

13

Hood, black

 

SRV550-175

14

Top Louver Assembly

 

550-251A

15

Dress Guard

 

2079-040

16

Lower Door

 

2079-042

17

Blower Assembly 240V

 

GFK-240V

18

Junction Cord Assembly

 

2222-374

Additional service parts numbers appear on following page.

Heat & Glo • 550TRSI-AUF, 550TRSILP-AUF2079-980 Rev. N • 5/12

77

Image 77
Contents Ref No GSCS20163 Sans 15392008 AS45532008 Models 550TRSI-AUF 550TRSILP-AUFWhat to do if you smell gas Hot glass will cause burnsModels 550TRSI-AUF, 550TRSILP-AUF Homeowner Reference Information CongratulationsSans Novida Testing ServiceSans Compliance User Guide Table of ContentsTroubleshooting Appliance SetupGas Information Electrical InformationLimited Lifetime Warranty Australian Warranty InformationOther Rights Perth This warranty is void ifListing and Code Approvals Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit Clear SpaceFinal inspection by Lighting Instructions IPIControl Module Operation Nine Hour Safety Shutdown FeatureAfter Fireplace is Lit Frequently Asked QuestionsMaintenance and Service Gasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianLogs FireboxTypical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Any such action may cause a fire hazardSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMinimum Framing Dimensions Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Vent Termination Minimum Clearances Termination LocationsClearance MIN. Clearance in. mmVent Information and Diagrams V1 Minimum H1 Maximum Top Vent Horizontal TerminationMinimum + H 2 Maximum Top Vent Horizontal Termination Two ElbowsMin Max Three ElbowsStraight Up Vertical Flue System Top Vent Vertical TerminationFlue Termination Approvals Flue System Approvals And InstallationsH1 Maximum V1 + V2 Min Top Vent Vertical Termination Two ElbowsH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsH1 Minimum H1 Maximum Rear Vent Horizontal Termination No ElbowOne 45º Elbow H3H2 Rear Vent Horizontal Termination Two ElbowsV1 Minimum H1 + H2 Maximum Rear Vent Vertical Termination One Elbow Two ElbowsMinimum Maximum Minimum + H 2 + H Maximum Rear Vent Vertical Termination Three ElbowsMaximum Minimum + H 2 Maximum Pipe Clearances to Combustibles Wall Penetration Framing Vent Clearances and FramingCombustible Wall Penetration Non-Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopInstalling the Optional Heat-Zone-240V Kit Install Attic Insulation ShieldFlat Ceiling Installation Vaulted Ceiling InstallationTop Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentSecuring and Leveling the Appliance Installing the Non-combustible BoardParts Replacement Components Removal For ServiceAdjustments And Replacement Parts Install Trim and/or SurroundAttach Vent to the Firebox Assembly Installing Vent Pipe DVP and SLP PipeAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Firestops Install Support BracketsFlue Termination For Horizontal Terminations using the SLP-TRAP2 or DVP-TRAP2Heat Shield Requirements for Horizontal Termination Install Metal Roof FlashingInstall Vertical Termination Cap Assemble and Install Storm CollarGas Connection Gas InformationGAS Access IntelliFire Plus Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Optional Remote Control Receiver LocationBlower Installation Precautions Kit ContentsFireplace Specific Information IntroductionInstallation of Remote Control Housing Changing Temperature ScaleProgramming the RC300AU to the Control Module AUX300CE Module InstallationFan Installation Standby mode Idle When Remote is in on ModeDisplay Screen Function ButtonsAbout OFF Mode About on ModeAdjusting Flame Height Adjusting Fan SpeedAdjusting Timer Adjusting ThermostatSetting the Child Lock Power OutageSymptom Possible Cause Corrective Action Frequently Asked Questions/Troubleshooting816 940 FinishingFacing Material Remove Fixed Glass Assembly Appliance SetupClean the Appliance Accessories3 4 5 6 7 Log Placement InstructionsHeat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Heat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 IntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Troubleshooting Location Inches Millimeters Appliance Dimension DiagramReference Materials Inspect Maintenance Tasks Maintenance TasksDVP-AS2 Vent Components DiagramsHorizontal Termination Cap Mm Heat Shield 15-1/8 384 mmEffective Length DVP-HRC-SS DVP-HRC-ZC-SS 165 mm 222 mm 235 mm 152 mm 168 mm 165 mmElbow 251 mmEffective Heat Shield 15-1/8 384 mmCathedral Ceiling HorizontalLog Set Assembly Service PartsBeginning Manufacturing Date July Ending Manufacturing Date #19 Valve AssemblyConversion Kits Service Parts ListContact Information