Heat & Glo LifeStyle 550TRSI-AUF owner manual Install Support Brackets, Install Firestops

Page 48

F. Install Support Brackets

For Horizontal Runs - The flue system must be supported every 5 ft. (1.52 m) of horizontal run by a horizontal pipe support. To install support brackets for horizontal runs:

Place the pipe supports around the flue pipe.

Nail the pipe supports to the framing members.

For Vertical Runs - The flue system must be supported every 8 ft. (2.44 m) above the heater flue outlet by wall brackets. To install support brackets for vertical runs:

Attach wall brackets to the flue pipe and secure the wall bracket to the framing members with nails or screws.

WALL BRACKET

WALL STUD

8 ft. (2.44 m)

FLUE

OUTLET

1 in.

25 mm

10 in. (254 mm)

INTERIOR

WALL SHIELD

12 in. (305 mm)

Figure 10.13 Flue Pipe & Firestop

For Vertical Runs - One firestop is REQUIRED at the hole in each ceiling through which the flue passes.

To install firestops for vertical runs that pass through ceilings:

Position a plumb bob directly over the center of the vertical flue component.

Mark the ceiling to establish the centerpoint of the flue.

Drill a hole or drive a nail through this center point.

Check the floor above for any obstructions, such as wiring or plumbing runs.

Reposition the heater and flue system, if necessary, to accommodate the ceiling joists and/or obstructions.

Cut a 10 in. x 10 in. (254 mm x 254 mm) hole through the ceiling when using DVP pipe, and a 9 in. x 9 in. (229 mm x 229 mm) hole when using SLP pipe. Use the firestop pipe opening as a guide.

Frame the hole with framing lumber the same size as the ceiling joists.

Figure 10.12 Installing Support Brackets

G. Install Firestops

For Horizontal Runs - Firestops are REQUIRED on both sides of a combustible wall through which the flue passes.

To install firestops (heat shield) for horizontal runs that pass through either interior or exterior walls:

• Cut a 10 in. by 12 in. (254 mm X 305 mm) hole through

the wall.

10" (254 mm)

NEW FRAMING MEMBERS

CEILING

10" (254 mm)

CHIMNEY

HOLE

EXISTING CEILING JOISTS

• Position the firestops on both sides of the hole previously

 

cut and secure the firestops with nails or screws.

The pipe opening of the firestops MUST BE placed

 

towards the bottom of the firestop.

Continue the flue run through the firestop.

 

A

B

SLP

9 in.

9 in.

(229 mm)

(229 mm)

 

DVP

10 in.

10 in.

(254 mm)

(254 mm)

 

Figure 10.14 Hole and New Framing Members

48

Heat & Glo • 550TRSI-AUF, 550TRSILP-AUF2079-980 Rev. N • 5/12

 

Image 48
Contents Models 550TRSI-AUF 550TRSILP-AUF Ref No GSCS20163 Sans 15392008 AS45532008What to do if you smell gas Hot glass will cause burnsModels 550TRSI-AUF, 550TRSILP-AUF Congratulations Homeowner Reference InformationNovida Testing Service Sans ComplianceSans Table of Contents User GuideAppliance Setup TroubleshootingGas Information Electrical InformationAustralian Warranty Information Limited Lifetime WarrantyOther Rights This warranty is void if PerthListing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit Clear SpaceLighting Instructions IPI Final inspection byNine Hour Safety Shutdown Feature Control Module OperationFrequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionLogs FireboxGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMinimum Framing Dimensions Mantel and Wall Projections Combustible MantelsCombustible Mantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesMIN. Clearance in. mm ClearanceVent Information and Diagrams Top Vent Horizontal Termination V1 Minimum H1 MaximumTop Vent Horizontal Termination Two Elbows Minimum + H 2 MaximumThree Elbows Min MaxTop Vent Vertical Termination Straight Up Vertical Flue SystemFlue System Approvals And Installations Flue Termination ApprovalsTop Vent Vertical Termination Two Elbows H1 Maximum V1 + V2 MinTop Vent Vertical Termination Three Elbows H1 + H2 V1 + V2 Minimum H1 + H2 MaximumRear Vent Horizontal Termination No Elbow One 45º ElbowH1 Minimum H1 Maximum Rear Vent Horizontal Termination Two Elbows H3H2Rear Vent Vertical Termination One Elbow Two Elbows Minimum MaximumV1 Minimum H1 + H2 Maximum Rear Vent Vertical Termination Three Elbows Maximum Minimum + H 2 MaximumMinimum + H 2 + H Maximum Vent Clearances and Framing Pipe Clearances to Combustibles Wall Penetration FramingCombustible Wall Penetration Non-Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPInstall Attic Insulation Shield Installing the Optional Heat-Zone-240V KitFlat Ceiling Installation Vaulted Ceiling InstallationAppliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outInstalling the Non-combustible Board Securing and Leveling the ApplianceComponents Removal For Service Parts ReplacementAdjustments And Replacement Parts Install Trim and/or SurroundInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Support Brackets Install FirestopsFor Horizontal Terminations using the SLP-TRAP2 or DVP-TRAP2 Flue TerminationInstall Metal Roof Flashing Heat Shield Requirements for Horizontal TerminationAssemble and Install Storm Collar Install Vertical Termination CapGas Information Gas ConnectionGAS Access Wiring Requirements IntelliFire Plus Ignition System WiringOptional Accessories Requirements Optional Remote Control Receiver LocationBlower Kit Contents Installation PrecautionsFireplace Specific Information IntroductionChanging Temperature Scale Installation of Remote Control HousingAUX300CE Module Installation Fan InstallationProgramming the RC300AU to the Control Module Idle When Remote is in on Mode Standby modeDisplay Screen Function ButtonsAbout on Mode About OFF ModeAdjusting Flame Height Adjusting Fan SpeedAdjusting Thermostat Adjusting TimerSetting the Child Lock Power OutageFrequently Asked Questions/Troubleshooting Symptom Possible Cause Corrective ActionFinishing Facing Material816 940 Appliance Setup Remove Fixed Glass AssemblyClean the Appliance AccessoriesLog Placement Instructions 3 4 5 6 7Heat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Heat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Troubleshooting Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters Maintenance Tasks Inspect Maintenance TasksVent Components Diagrams DVP-AS2Mm Heat Shield 15-1/8 384 mm Effective LengthHorizontal Termination Cap DVP-HRC-SS DVP-HRC-ZC-SS 165 mm 165 mm 222 mm 235 mm 152 mm 168 mmElbow 251 mmHeat Shield 15-1/8 384 mm EffectiveCathedral Ceiling HorizontalService Parts Log Set Assembly#19 Valve Assembly Beginning Manufacturing Date July Ending Manufacturing DateService Parts List Conversion KitsContact Information