Heat & Glo LifeStyle 550TRSI-AUF Top Vent Horizontal Termination, V1 Minimum H1 Maximum

Page 27

Top Vent - Horizontal Termination

V1 Minimum

H1 Maximum

Elbow only

NOT ALLOWED

1 ft.

305 mm

2 ft.

610 mm

2 ft.

610 mm

4 ft.

1.22 m

3 ft.

914 mm

8 ft.

2.44 m

4 ft.

1.22 m

10 ft.

3.05 m

5 ft.

1.52 m

16 ft.

4.88 m

V1 + H1 = 30 ft. (9.14 m) Maximum

Note: A 6 in. (152 mm) section of straight flue must be attached to the heater before a 90° elbow.

USE SLP SERIES COMPONENTS ONLY

WARNING

Fire Risk. Explosion Risk.

Do NOT pack insulation or other combustibles between ceiling firestops.

ALWAYS maintain specified clearances around venting and firestop systems.

• Install wall shield and ceiling firestops as speci- fied.

Failure to keep insulation or other material away from vent pipe may cause fire.

Example: DVP pipe 3 ft. (1 m) min. vertical = 11 ft. (3.35 m) max. horizontal

SLP pipe 7 ft. (2.13 m) min. vertical = 11 ft. (3.35 m) max. horizontal

H1

V1

Figure 7.4

Heat & Glo • 550TRSI-AUF, 550TRSILP-AUF2079-980 Rev. N • 5/12

27

Image 27
Contents Hot glass will cause burns Models 550TRSI-AUF 550TRSILP-AUFRef No GSCS20163 Sans 15392008 AS45532008 What to do if you smell gasModels 550TRSI-AUF, 550TRSILP-AUF Homeowner Reference Information CongratulationsNovida Testing Service Sans ComplianceSans User Guide Table of ContentsElectrical Information Appliance SetupTroubleshooting Gas InformationLimited Lifetime Warranty Australian Warranty InformationOther Rights Perth This warranty is void ifListing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan KitFinal inspection by Lighting Instructions IPIControl Module Operation Nine Hour Safety Shutdown FeatureAfter Fireplace is Lit Frequently Asked QuestionsMaintenance and Service Firebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsTypical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMinimum Framing Dimensions Mantel and Wall Projections Combustible MantelsCombustible Mantel Legs or Wall Projections Vent Termination Minimum Clearances Termination LocationsClearance MIN. Clearance in. mmVent Information and Diagrams V1 Minimum H1 Maximum Top Vent Horizontal TerminationMinimum + H 2 Maximum Top Vent Horizontal Termination Two ElbowsMin Max Three ElbowsStraight Up Vertical Flue System Top Vent Vertical TerminationFlue Termination Approvals Flue System Approvals And InstallationsH1 Maximum V1 + V2 Min Top Vent Vertical Termination Two ElbowsH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsRear Vent Horizontal Termination No Elbow One 45º ElbowH1 Minimum H1 Maximum H3H2 Rear Vent Horizontal Termination Two ElbowsRear Vent Vertical Termination One Elbow Two Elbows Minimum MaximumV1 Minimum H1 + H2 Maximum Rear Vent Vertical Termination Three Elbows Maximum Minimum + H 2 MaximumMinimum + H 2 + H Maximum Non-Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration Framing Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-Zone-240V Kit Flat Ceiling InstallationTop Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentSecuring and Leveling the Appliance Installing the Non-combustible BoardInstall Trim and/or Surround Components Removal For ServiceParts Replacement Adjustments And Replacement PartsAssemble Pipe Sections Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Firestops Install Support BracketsFlue Termination For Horizontal Terminations using the SLP-TRAP2 or DVP-TRAP2Heat Shield Requirements for Horizontal Termination Install Metal Roof FlashingInstall Vertical Termination Cap Assemble and Install Storm CollarGas Connection Gas InformationGAS Access Optional Remote Control Receiver Location Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Accessories RequirementsBlower Introduction Kit ContentsInstallation Precautions Fireplace Specific InformationInstallation of Remote Control Housing Changing Temperature ScaleAUX300CE Module Installation Fan InstallationProgramming the RC300AU to the Control Module Function Buttons Idle When Remote is in on ModeStandby mode Display ScreenAdjusting Fan Speed About on ModeAbout OFF Mode Adjusting Flame HeightPower Outage Adjusting ThermostatAdjusting Timer Setting the Child LockSymptom Possible Cause Corrective Action Frequently Asked Questions/TroubleshootingFinishing Facing Material816 940 Accessories Appliance SetupRemove Fixed Glass Assembly Clean the Appliance3 4 5 6 7 Log Placement InstructionsHeat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Heat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Troubleshooting Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters Inspect Maintenance Tasks Maintenance TasksDVP-AS2 Vent Components DiagramsMm Heat Shield 15-1/8 384 mm Effective LengthHorizontal Termination Cap DVP-HRC-SS DVP-HRC-ZC-SS 251 mm 165 mm165 mm 222 mm 235 mm 152 mm 168 mm ElbowHorizontal Heat Shield 15-1/8 384 mmEffective Cathedral CeilingLog Set Assembly Service PartsBeginning Manufacturing Date July Ending Manufacturing Date #19 Valve AssemblyConversion Kits Service Parts ListContact Information