Heat & Glo LifeStyle 550TRSI-AUF owner manual #19 Valve Assembly

Page 78

Service Parts

550TRSI-AUF, 550TRSILP-AUF

Beginning Manufacturing Date: July 2010

Ending Manufacturing Date: ______

#19 Valve Assembly

19.1

 

 

19.2

 

 

 

 

 

 

 

19.3

 

 

 

 

19.4

 

 

 

 

19.5

 

 

 

 

19.6

19.17

 

 

 

 

19.15

 

 

 

19.16

 

 

 

19.14

 

 

 

 

 

19.7

 

 

 

 

 

19.8

 

 

 

 

19.9

 

 

 

 

19.10

19.11

19.13

 

 

 

 

 

 

 

19.12

 

IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement parts for your appliance please provide model number and serial number. All parts listed in this manual may be ordered from an authorized dealer.

ITEM

DESCRIPTION

COMMENTS

PART NUMBER

 

Pilot Assembly N

Pre June 2012

2198-014

19.1

Post June 2012

2090-012

 

Pilot Assembly P

Pre June 2012

2198-015

 

 

 

 

 

Post June 2012

2090-013

 

 

 

 

 

 

19.2

Pilot Bracket

Post June 2012

2079-204

 

 

 

 

19.3

Pilot Bracket

 

2079-104

19.4

3 Hole Grommet

 

2118-104

 

Orifice N (#40C)

 

582-840

 

 

 

 

19.5

Orifice P (.057)

 

582-057

 

 

 

 

 

OrifIce B (#55C)

 

582-855

 

 

 

 

19.9

12 in Flex Tube Assembly

 

383-302A

19.7

18" Flex Assembly

 

2098-320A

19.8

Valve Bracket

 

2118-104A

 

 

 

 

19.9

Male Connector

Pkg of 5

303-315/5

 

 

 

 

19.10

Valve N

 

2166-302

 

 

 

Valve P

 

2166-303

 

 

19.11

Wire Harness, 8k-1

 

2166-304

19.12

Module, Gray

 

2166-306

 

 

 

 

19.13

AUX300-CE

 

2166-340

 

 

 

 

19.14

Jumper Wire, Fan to Aux

 

2166-375

19.15

Transformer, Switches DC Regulator

 

2166-305

 

 

 

 

19.16

Jumper wire

 

2187-198

 

 

 

 

19.17

Battery Pack**

 

4067-223

**Fuse for battery pack can be sourced locally, not a warranty item. Specs are 500mA~10A 3/4" long

78

Heat & Glo • 550TRSI-AUF, 550TRSILP-AUF2079-980 Rev. N • 5/12

 

Image 78
Contents What to do if you smell gas Models 550TRSI-AUF 550TRSILP-AUFRef No GSCS20163 Sans 15392008 AS45532008 Hot glass will cause burnsModels 550TRSI-AUF, 550TRSILP-AUF Congratulations Homeowner Reference InformationNovida Testing Service Sans ComplianceSans Table of Contents User GuideGas Information Appliance SetupTroubleshooting Electrical InformationAustralian Warranty Information Limited Lifetime WarrantyOther Rights This warranty is void if PerthListing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Fan Kit Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceLighting Instructions IPI Final inspection byNine Hour Safety Shutdown Feature Control Module OperationFrequently Asked Questions After Fireplace is LitMaintenance and Service Logs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMinimum Framing Dimensions Mantel and Wall Projections Combustible MantelsCombustible Mantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesMIN. Clearance in. mm ClearanceVent Information and Diagrams Top Vent Horizontal Termination V1 Minimum H1 MaximumTop Vent Horizontal Termination Two Elbows Minimum + H 2 MaximumThree Elbows Min MaxTop Vent Vertical Termination Straight Up Vertical Flue SystemFlue System Approvals And Installations Flue Termination ApprovalsTop Vent Vertical Termination Two Elbows H1 Maximum V1 + V2 MinTop Vent Vertical Termination Three Elbows H1 + H2 V1 + V2 Minimum H1 + H2 MaximumRear Vent Horizontal Termination No Elbow One 45º ElbowH1 Minimum H1 Maximum Rear Vent Horizontal Termination Two Elbows H3H2Rear Vent Vertical Termination One Elbow Two Elbows Minimum MaximumV1 Minimum H1 + H2 Maximum Rear Vent Vertical Termination Three Elbows Maximum Minimum + H 2 MaximumMinimum + H 2 + H Maximum Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration Framing Non-Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPFlat Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-Zone-240V Kit Vaulted Ceiling InstallationAppliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outInstalling the Non-combustible Board Securing and Leveling the ApplianceAdjustments And Replacement Parts Components Removal For ServiceParts Replacement Install Trim and/or SurroundAssemble Vent Sections DVP Pipe Only Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Support Brackets Install FirestopsFor Horizontal Terminations using the SLP-TRAP2 or DVP-TRAP2 Flue TerminationInstall Metal Roof Flashing Heat Shield Requirements for Horizontal TerminationAssemble and Install Storm Collar Install Vertical Termination CapGas Information Gas ConnectionGAS Access Optional Accessories Requirements Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Remote Control Receiver LocationBlower Fireplace Specific Information Kit ContentsInstallation Precautions IntroductionChanging Temperature Scale Installation of Remote Control HousingAUX300CE Module Installation Fan InstallationProgramming the RC300AU to the Control Module Display Screen Idle When Remote is in on ModeStandby mode Function ButtonsAdjusting Flame Height About on ModeAbout OFF Mode Adjusting Fan SpeedSetting the Child Lock Adjusting ThermostatAdjusting Timer Power OutageFrequently Asked Questions/Troubleshooting Symptom Possible Cause Corrective ActionFinishing Facing Material816 940 Clean the Appliance Appliance SetupRemove Fixed Glass Assembly AccessoriesLog Placement Instructions 3 4 5 6 7Heat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Heat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Troubleshooting Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters Maintenance Tasks Inspect Maintenance TasksVent Components Diagrams DVP-AS2Mm Heat Shield 15-1/8 384 mm Effective LengthHorizontal Termination Cap DVP-HRC-SS DVP-HRC-ZC-SS Elbow 165 mm165 mm 222 mm 235 mm 152 mm 168 mm 251 mmCathedral Ceiling Heat Shield 15-1/8 384 mmEffective HorizontalService Parts Log Set Assembly#19 Valve Assembly Beginning Manufacturing Date July Ending Manufacturing DateService Parts List Conversion KitsContact Information