Heat & Glo LifeStyle 550TRSI-AUF 165 mm 222 mm 235 mm 152 mm 168 mm, Elbow, 251 mm, Adapter

Page 75

B. Vent Components Diagrams (continued)

 

 

6-1/2 in.

 

6-1/2 in.

165 mm

 

 

 

165 mm

6-1/2 in.

 

 

8-3/4 in.

 

165 mm

 

9-1/4 in.

222 mm

6 in.

235 mm

 

152 mm

 

 

6-5/8 in.

 

 

168 mm

6-5/8 in.

 

SLP45

 

168 mm

 

45° Elbow

 

 

 

 

9-7/8 in.

 

 

251 mm

 

 

SLP-90ST

 

 

90° Elbow

Effective

Height/

Length

SLP PIPE

Effective Height/Length

Pipe

inches

mm

 

SLP4

4

102

 

 

 

 

 

SLP6

6

152

 

SLP12

12

305

 

 

 

 

 

SLP24

24

610

 

SLP36

36

914

 

 

 

 

 

SLP48

48

1219

 

 

 

 

 

SLP6A

2 - 6

51 - 152

DVP-SLP24

SLP12A

2 - 12

51 - 305

Adapter

SLP-FLEX-2

24

610

 

SLP-FLEX-3

36

914

 

 

 

 

 

SLP-FLEX-5

60

1524

 

SLP-FLEX-10

120

3048

 

 

 

 

 

SLP-HVS

SLP-FS

SLP-WS

Horizontal Pipe

Ceiling Firestop

Wall Shield Firestop

Support

 

 

Figure 16.6 SLP Series Vent Components

 

 

Heat & Glo • 550TRSI-AUF, 550TRSILP-AUF2079-980 Rev. N • 5/12

75

Image 75
Contents Hot glass will cause burns Models 550TRSI-AUF 550TRSILP-AUFRef No GSCS20163 Sans 15392008 AS45532008 What to do if you smell gasModels 550TRSI-AUF, 550TRSILP-AUF Homeowner Reference Information CongratulationsNovida Testing Service Sans ComplianceSans User Guide Table of ContentsElectrical Information Appliance SetupTroubleshooting Gas InformationLimited Lifetime Warranty Australian Warranty InformationOther Rights Perth This warranty is void ifListing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan KitFinal inspection by Lighting Instructions IPIControl Module Operation Nine Hour Safety Shutdown FeatureAfter Fireplace is Lit Frequently Asked QuestionsMaintenance and Service Firebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsTypical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMinimum Framing Dimensions Mantel and Wall Projections Combustible MantelsCombustible Mantel Legs or Wall Projections Vent Termination Minimum Clearances Termination LocationsClearance MIN. Clearance in. mmVent Information and Diagrams V1 Minimum H1 Maximum Top Vent Horizontal TerminationMinimum + H 2 Maximum Top Vent Horizontal Termination Two ElbowsMin Max Three ElbowsStraight Up Vertical Flue System Top Vent Vertical TerminationFlue Termination Approvals Flue System Approvals And InstallationsH1 Maximum V1 + V2 Min Top Vent Vertical Termination Two ElbowsH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsRear Vent Horizontal Termination No Elbow One 45º ElbowH1 Minimum H1 Maximum H3H2 Rear Vent Horizontal Termination Two ElbowsRear Vent Vertical Termination One Elbow Two Elbows Minimum MaximumV1 Minimum H1 + H2 Maximum Rear Vent Vertical Termination Three Elbows Maximum Minimum + H 2 MaximumMinimum + H 2 + H Maximum Non-Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration Framing Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-Zone-240V Kit Flat Ceiling InstallationTop Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentSecuring and Leveling the Appliance Installing the Non-combustible BoardInstall Trim and/or Surround Components Removal For ServiceParts Replacement Adjustments And Replacement PartsAssemble Pipe Sections Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Firestops Install Support BracketsFlue Termination For Horizontal Terminations using the SLP-TRAP2 or DVP-TRAP2Heat Shield Requirements for Horizontal Termination Install Metal Roof FlashingInstall Vertical Termination Cap Assemble and Install Storm CollarGas Connection Gas InformationGAS Access Optional Remote Control Receiver Location Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Accessories RequirementsBlower Introduction Kit ContentsInstallation Precautions Fireplace Specific InformationInstallation of Remote Control Housing Changing Temperature ScaleAUX300CE Module Installation Fan InstallationProgramming the RC300AU to the Control Module Function Buttons Idle When Remote is in on ModeStandby mode Display ScreenAdjusting Fan Speed About on ModeAbout OFF Mode Adjusting Flame HeightPower Outage Adjusting ThermostatAdjusting Timer Setting the Child LockSymptom Possible Cause Corrective Action Frequently Asked Questions/TroubleshootingFinishing Facing Material816 940 Accessories Appliance SetupRemove Fixed Glass Assembly Clean the Appliance3 4 5 6 7 Log Placement InstructionsHeat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Heat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Troubleshooting Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters Inspect Maintenance Tasks Maintenance TasksDVP-AS2 Vent Components DiagramsMm Heat Shield 15-1/8 384 mm Effective LengthHorizontal Termination Cap DVP-HRC-SS DVP-HRC-ZC-SS 251 mm 165 mm165 mm 222 mm 235 mm 152 mm 168 mm ElbowHorizontal Heat Shield 15-1/8 384 mmEffective Cathedral CeilingLog Set Assembly Service PartsBeginning Manufacturing Date July Ending Manufacturing Date #19 Valve AssemblyConversion Kits Service Parts ListContact Information