Heat & Glo LifeStyle 550TRSI-AUF owner manual Minimum Framing Dimensions

Page 22

Note: The clearance to ceil- ing is measured from the top of the unit and it does not

Ainclude the standoffs.

B

C

D

1in.

E 25 mm

J

F

G

H

NOTE: FRAME OPENING HEIGHT IS GREATER THAN PLASTER OPENING HEIGHT.

I

*MINIMUM FRAMING DIMENSIONS

 

 

A

 

B

C

 

D

E

F

G

H

I

J

Models

 

DVP Pipe

SLP Pipe

Rough

**DVP Pipe

SLP Pipe

Rough

 

 

 

 

 

 

 

 

 

 

 

 

Clearance

Combustible

Combustible

Behind

Sides of

Front of

 

Rough

 

Rough

Rough

Rough

 

 

 

Opening

Opening

to Ceiling

Floor

Flooring

Appliance

Appliance

Appliance

 

 

Opening

 

Opening

Opening

Opening

 

 

 

(Height)

(Width)

 

 

 

 

 

 

 

 

(Width)

 

(Width)

 

(Depth)

(Depth)

 

 

 

 

 

 

 

550TRSI-AUF

in.

10

 

8-5/8

34-3/4

16-1/4

16-1/4

37

32

0

0

1/2

1/2

36

550TRSILP-AUF

mm

254

 

219

882

413

413

940

813

0

0

13

13

915

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*Adjust framing dimensions for interior sheathing (such as sheetrock) C** Add 12 in. (305 mm) for rear venting with one 90º elbow.

Figure 5.3 Clearances to Combustibles

22

Heat & Glo • 550TRSI-AUF, 550TRSILP-AUF2079-980 Rev. N • 5/12

 

Image 22
Contents What to do if you smell gas Models 550TRSI-AUF 550TRSILP-AUFRef No GSCS20163 Sans 15392008 AS45532008 Hot glass will cause burnsModels 550TRSI-AUF, 550TRSILP-AUF Congratulations Homeowner Reference InformationSans Compliance Novida Testing ServiceSans Table of Contents User GuideGas Information Appliance SetupTroubleshooting Electrical InformationAustralian Warranty Information Limited Lifetime WarrantyOther Rights This warranty is void if PerthListing and Code Approvals Operating Instructions User Guide Gas Fireplace SafetyYour Fireplace Fan Kit Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceLighting Instructions IPI Final inspection byNine Hour Safety Shutdown Feature Control Module OperationFrequently Asked Questions After Fireplace is LitMaintenance and Service Logs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMinimum Framing Dimensions Combustible Mantels Mantel and Wall ProjectionsCombustible Mantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesMIN. Clearance in. mm ClearanceVent Information and Diagrams Top Vent Horizontal Termination V1 Minimum H1 MaximumTop Vent Horizontal Termination Two Elbows Minimum + H 2 MaximumThree Elbows Min MaxTop Vent Vertical Termination Straight Up Vertical Flue SystemFlue System Approvals And Installations Flue Termination ApprovalsTop Vent Vertical Termination Two Elbows H1 Maximum V1 + V2 MinTop Vent Vertical Termination Three Elbows H1 + H2 V1 + V2 Minimum H1 + H2 MaximumOne 45º Elbow Rear Vent Horizontal Termination No ElbowH1 Minimum H1 Maximum Rear Vent Horizontal Termination Two Elbows H3H2Minimum Maximum Rear Vent Vertical Termination One Elbow Two ElbowsV1 Minimum H1 + H2 Maximum Maximum Minimum + H 2 Maximum Rear Vent Vertical Termination Three ElbowsMinimum + H 2 + H Maximum Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration Framing Non-Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPFlat Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-Zone-240V Kit Vaulted Ceiling InstallationAppliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outInstalling the Non-combustible Board Securing and Leveling the ApplianceAdjustments And Replacement Parts Components Removal For ServiceParts Replacement Install Trim and/or SurroundAssemble Vent Sections DVP Pipe Only Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Support Brackets Install FirestopsFor Horizontal Terminations using the SLP-TRAP2 or DVP-TRAP2 Flue TerminationInstall Metal Roof Flashing Heat Shield Requirements for Horizontal TerminationAssemble and Install Storm Collar Install Vertical Termination CapGas Information Gas ConnectionGAS Access Optional Accessories Requirements Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Remote Control Receiver LocationBlower Fireplace Specific Information Kit ContentsInstallation Precautions IntroductionChanging Temperature Scale Installation of Remote Control HousingFan Installation AUX300CE Module InstallationProgramming the RC300AU to the Control Module Display Screen Idle When Remote is in on ModeStandby mode Function ButtonsAdjusting Flame Height About on ModeAbout OFF Mode Adjusting Fan SpeedSetting the Child Lock Adjusting ThermostatAdjusting Timer Power OutageFrequently Asked Questions/Troubleshooting Symptom Possible Cause Corrective ActionFacing Material Finishing816 940 Clean the Appliance Appliance SetupRemove Fixed Glass Assembly AccessoriesLog Placement Instructions 3 4 5 6 7Heat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Heat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Troubleshooting Reference Materials Appliance Dimension DiagramLocation Inches Millimeters Maintenance Tasks Inspect Maintenance TasksVent Components Diagrams DVP-AS2Effective Length Mm Heat Shield 15-1/8 384 mmHorizontal Termination Cap DVP-HRC-SS DVP-HRC-ZC-SS Elbow 165 mm165 mm 222 mm 235 mm 152 mm 168 mm 251 mmCathedral Ceiling Heat Shield 15-1/8 384 mmEffective HorizontalService Parts Log Set Assembly#19 Valve Assembly Beginning Manufacturing Date July Ending Manufacturing DateService Parts List Conversion KitsContact Information