Heat & Glo LifeStyle 550TRSI-AUF owner manual Dvp-Hrc-Ss Dvp-Hrc-Zc-Ss

Page 74

C. Vent Components Diagrams (continued)

8-1/8 in.

(206 mm)

15in.

(381 mm)

13in.

(330 mm)

Effective Length 5-3/4 to 8-3/8 in. 146 to 213 mm

5-1/2 in.

8-3/8 in.

140 mm

213 mm

87°

10-1/2 in.

267 mm

10-7/8 in.

276 mm

DVP-HRC-SS

DVP-HRC-ZC-SS

Horizontal Termination Cap

WARNING

Fire Risk.

When using DVP-HRC-SS and DVP-HRC-ZC- SS termination caps on top vented fireplaces, a

6 inch (152 mm) minimum vertical vent section is required before installing first elbow.

 

 

31 in.

12 in.

 

 

305 mm

 

 

(787 mm)

 

 

 

 

 

 

7-1/4 in.

24-5/8 in.

 

 

(184 mm)

 

 

12-1/2 in.

(625 mm)

 

 

(318 mm)

 

 

 

5-1/4 in.

 

 

 

(133 mm)

 

 

13-1/4 in.

 

DVP-TRAPFL

 

(367 mm)

DVP-TVHW

 

 

Flashing

RF12M

 

VerticalTermination Cap (Highwind)

 

 

 

Roof Flashing Multi-pak

 

 

13-7/8 in.

9-1/2 in.

13-1/4 in.

 

(352 mm)

(241 mm)

 

 

 

(367 mm)

 

 

 

 

27-1/2 in.

14 in.

 

24-5/8 in.

(356 mm)

 

(625 mm)

(127 mm)

 

 

 

RF6M

 

DRC-RADIUS

 

 

Cap Shield

Roof Flashing Multi-pak

 

 

 

Figure 16.5 DVP vent components

 

 

74

Heat & Glo • 550TRSI-AUF, 550TRSILP-AUF2079-980 Rev. N • 5/12

 

Image 74
Contents What to do if you smell gas Models 550TRSI-AUF 550TRSILP-AUFRef No GSCS20163 Sans 15392008 AS45532008 Hot glass will cause burnsModels 550TRSI-AUF, 550TRSILP-AUF Congratulations Homeowner Reference InformationSans Novida Testing ServiceSans Compliance Table of Contents User GuideGas Information Appliance SetupTroubleshooting Electrical InformationAustralian Warranty Information Limited Lifetime WarrantyOther Rights This warranty is void if PerthListing and Code Approvals Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fan Kit Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceLighting Instructions IPI Final inspection byNine Hour Safety Shutdown Feature Control Module OperationFrequently Asked Questions After Fireplace is LitMaintenance and Service Logs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMinimum Framing Dimensions Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Termination Locations Vent Termination Minimum ClearancesMIN. Clearance in. mm ClearanceVent Information and Diagrams Top Vent Horizontal Termination V1 Minimum H1 MaximumTop Vent Horizontal Termination Two Elbows Minimum + H 2 MaximumThree Elbows Min MaxTop Vent Vertical Termination Straight Up Vertical Flue SystemFlue System Approvals And Installations Flue Termination ApprovalsTop Vent Vertical Termination Two Elbows H1 Maximum V1 + V2 MinTop Vent Vertical Termination Three Elbows H1 + H2 V1 + V2 Minimum H1 + H2 MaximumH1 Minimum H1 Maximum Rear Vent Horizontal Termination No ElbowOne 45º Elbow Rear Vent Horizontal Termination Two Elbows H3H2V1 Minimum H1 + H2 Maximum Rear Vent Vertical Termination One Elbow Two ElbowsMinimum Maximum Minimum + H 2 + H Maximum Rear Vent Vertical Termination Three ElbowsMaximum Minimum + H 2 Maximum Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration Framing Non-Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPFlat Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-Zone-240V Kit Vaulted Ceiling InstallationAppliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outInstalling the Non-combustible Board Securing and Leveling the ApplianceAdjustments And Replacement Parts Components Removal For ServiceParts Replacement Install Trim and/or SurroundAssemble Vent Sections DVP Pipe Only Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Support Brackets Install FirestopsFor Horizontal Terminations using the SLP-TRAP2 or DVP-TRAP2 Flue TerminationInstall Metal Roof Flashing Heat Shield Requirements for Horizontal TerminationAssemble and Install Storm Collar Install Vertical Termination CapGas Information Gas ConnectionGAS Access Optional Accessories Requirements Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Remote Control Receiver LocationBlower Fireplace Specific Information Kit ContentsInstallation Precautions IntroductionChanging Temperature Scale Installation of Remote Control HousingProgramming the RC300AU to the Control Module AUX300CE Module InstallationFan Installation Display Screen Idle When Remote is in on ModeStandby mode Function ButtonsAdjusting Flame Height About on ModeAbout OFF Mode Adjusting Fan SpeedSetting the Child Lock Adjusting ThermostatAdjusting Timer Power OutageFrequently Asked Questions/Troubleshooting Symptom Possible Cause Corrective Action816 940 FinishingFacing Material Clean the Appliance Appliance SetupRemove Fixed Glass Assembly AccessoriesLog Placement Instructions 3 4 5 6 7Heat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Heat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 IntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Troubleshooting Location Inches Millimeters Appliance Dimension DiagramReference Materials Maintenance Tasks Inspect Maintenance TasksVent Components Diagrams DVP-AS2Horizontal Termination Cap Mm Heat Shield 15-1/8 384 mmEffective Length DVP-HRC-SS DVP-HRC-ZC-SS Elbow 165 mm165 mm 222 mm 235 mm 152 mm 168 mm 251 mmCathedral Ceiling Heat Shield 15-1/8 384 mmEffective HorizontalService Parts Log Set Assembly#19 Valve Assembly Beginning Manufacturing Date July Ending Manufacturing DateService Parts List Conversion KitsContact Information