Heat & Glo LifeStyle 550TRSI-AUF owner manual MIN. Clearance in. mm

Page 25

 

 

 

 

 

 

a

 

 

j

 

T

 

 

 

 

 

h

 

c

 

 

 

 

 

 

 

 

j

j

e

e

d

 

 

openable

 

h

 

 

 

 

window

 

P

 

 

 

 

 

h

 

 

 

n

door

 

g

 

 

 

 

 

f

 

k

 

T

 

M

 

 

 

 

 

 

 

 

 

 

I

 

 

 

d

 

c

 

 

 

 

 

 

 

 

b

 

 

 

 

g

 

 

 

 

k

 

 

 

 

 

 

 

 

 

 

See note 2

See note 3

T

 

T = Flue terminal

M = Gas meter

Shading indicates prohibited

 

I = Mechanical air inlet

P = Electricity meter or fuse box

areas for flue terminals

a

- Below eaves, balconies or other projections:

MIN. CLEARANCE - in. (mm)

 

Appliances up to 50 MJ/h input

12

(300)

 

Appliances over 50 MJ/h input

................................................................................

20-1/2

(500)

b

- From the ground or above a balcony

12

(300)

c

- From a return wall or external corner

20-1/2

(500)

d

- From a gas meter (M)

39

(1000)

e

- From an electricity meter or fuse box (P)

20-1/2

(500)

f

- From a drain or soil pipe

6

(150)

g- Horizontally from any building structure (unless appliance approved

for closer installation) or obstruction facing a terminal

20-1/2

(500)

h - From any other flue terminal, cowl, or combustion air intake

20-1/2

(500)

j- Horizontally from an openable window, door, non-mechanical air inlet, or any other opening into a building, with the exception of

sub-floor ventilation:

 

 

Appliances up to 150 MJ/h input

20-1/2

(500)

Appliances over 150 MJ/h input

60

(1500)

k - From a mechanical air inlet, including a spa blower

60

(1500)

n- Vertically below an openable window, non-mechanical air

inlet or any other opening into a building, with the exception of

See table

sub-floor ventilation

 

 

below

 

 

 

 

 

CLEARANCE

 

Space Heaters

 

All other appliances

 

 

 

 

 

Up to 50 MJ/h input

Up to 50 MJ/h input

Over 50 MJ/h input and

Over 50 MJ/h input

Up to 150 MJ/h input

 

 

 

6 in. (150 mm)

20 in. (500 mm)

39 in. (1000 mm)

59 in. (1500 mm)

 

 

 

 

NOTES: 1. All distances are measured vertically or horizontally along the wall to a point in line with the nearest part of the terminal.

2.Prohibited area below electricity meter or fuse box extends to ground level.

3.See clause 5.13.6.6 for restrictions on a flue terminal under a roofed area.

4.See Appendix J, Figure J1(a) and J2(a) for clearances required from a flue

terminal to a LP Gas cylinder. A flue terminal is considered to be a source of ignition.

MINIMUM CLEARANCES REQUIRED FOR BALANCED FLUE TERMINALS

OR THE FLUE TERMINALS OF OUTDOOR APPLIANCES

Figure 6.3 Minimum Clearances for Termination

Heat & Glo • 550TRSI-AUF, 550TRSILP-AUF2079-980 Rev. N • 5/12

25

Image 25
Contents Ref No GSCS20163 Sans 15392008 AS45532008 Models 550TRSI-AUF 550TRSILP-AUFWhat to do if you smell gas Hot glass will cause burnsModels 550TRSI-AUF, 550TRSILP-AUF Homeowner Reference Information CongratulationsSans Compliance Novida Testing ServiceSans User Guide Table of ContentsTroubleshooting Appliance SetupGas Information Electrical InformationLimited Lifetime Warranty Australian Warranty InformationOther Rights Perth This warranty is void ifListing and Code Approvals Operating Instructions User Guide Gas Fireplace SafetyYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit Clear SpaceFinal inspection by Lighting Instructions IPIControl Module Operation Nine Hour Safety Shutdown FeatureAfter Fireplace is Lit Frequently Asked QuestionsMaintenance and Service Gasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianLogs FireboxTypical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Any such action may cause a fire hazardSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMinimum Framing Dimensions Combustible Mantels Mantel and Wall ProjectionsCombustible Mantel Legs or Wall Projections Vent Termination Minimum Clearances Termination LocationsClearance MIN. Clearance in. mmVent Information and Diagrams V1 Minimum H1 Maximum Top Vent Horizontal TerminationMinimum + H 2 Maximum Top Vent Horizontal Termination Two ElbowsMin Max Three ElbowsStraight Up Vertical Flue System Top Vent Vertical TerminationFlue Termination Approvals Flue System Approvals And InstallationsH1 Maximum V1 + V2 Min Top Vent Vertical Termination Two ElbowsH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsOne 45º Elbow Rear Vent Horizontal Termination No ElbowH1 Minimum H1 Maximum H3H2 Rear Vent Horizontal Termination Two ElbowsMinimum Maximum Rear Vent Vertical Termination One Elbow Two ElbowsV1 Minimum H1 + H2 Maximum Maximum Minimum + H 2 Maximum Rear Vent Vertical Termination Three ElbowsMinimum + H 2 + H Maximum Pipe Clearances to Combustibles Wall Penetration Framing Vent Clearances and FramingCombustible Wall Penetration Non-Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopInstalling the Optional Heat-Zone-240V Kit Install Attic Insulation ShieldFlat Ceiling Installation Vaulted Ceiling InstallationTop Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentSecuring and Leveling the Appliance Installing the Non-combustible BoardParts Replacement Components Removal For ServiceAdjustments And Replacement Parts Install Trim and/or SurroundAttach Vent to the Firebox Assembly Installing Vent Pipe DVP and SLP PipeAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Firestops Install Support BracketsFlue Termination For Horizontal Terminations using the SLP-TRAP2 or DVP-TRAP2Heat Shield Requirements for Horizontal Termination Install Metal Roof FlashingInstall Vertical Termination Cap Assemble and Install Storm CollarGas Connection Gas InformationGAS Access IntelliFire Plus Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Optional Remote Control Receiver LocationBlower Installation Precautions Kit ContentsFireplace Specific Information IntroductionInstallation of Remote Control Housing Changing Temperature ScaleFan Installation AUX300CE Module InstallationProgramming the RC300AU to the Control Module Standby mode Idle When Remote is in on ModeDisplay Screen Function ButtonsAbout OFF Mode About on ModeAdjusting Flame Height Adjusting Fan SpeedAdjusting Timer Adjusting ThermostatSetting the Child Lock Power OutageSymptom Possible Cause Corrective Action Frequently Asked Questions/TroubleshootingFacing Material Finishing816 940 Remove Fixed Glass Assembly Appliance SetupClean the Appliance Accessories3 4 5 6 7 Log Placement InstructionsHeat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Heat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Troubleshooting Reference Materials Appliance Dimension DiagramLocation Inches Millimeters Inspect Maintenance Tasks Maintenance TasksDVP-AS2 Vent Components DiagramsEffective Length Mm Heat Shield 15-1/8 384 mmHorizontal Termination Cap DVP-HRC-SS DVP-HRC-ZC-SS 165 mm 222 mm 235 mm 152 mm 168 mm 165 mmElbow 251 mmEffective Heat Shield 15-1/8 384 mmCathedral Ceiling HorizontalLog Set Assembly Service PartsBeginning Manufacturing Date July Ending Manufacturing Date #19 Valve AssemblyConversion Kits Service Parts ListContact Information