Heat & Glo LifeStyle 550TRSI-AUF owner manual Finishing, Facing Material, 816 940

Page 63

13 Finishing

A. Mantel and Wall Projections

WARNING! Risk of Fire! Comply with all minimum clear- ances as specified. Framing closer than the minimums list- ed must be constructed entirely of noncombustible materials (i.e., steel studs, concrete board, etc.)

Combustible Mantels

 

 

 

305

 

 

 

 

279

 

NON-COMBUSTIBLE

 

 

254

 

 

229

 

BOARD

 

203

 

 

 

178

 

305

 

152

 

 

279

127

 

254

 

102

 

 

229

 

76

 

 

203

 

 

 

127 152178

 

51

76

102

 

51

 

 

 

 

 

 

 

 

 

TOP FRONT EDGE

OF FIREPLACE

Note: All measurements in millimeters.

Note: Measurement is taken from top of the opening, NOT the top of the fireplace.

Figure 13.1 Minimum Vertical and Maximum Horizontal

Dimensions of Combustibles

Combustible Mantel Legs or Wall Projections

*Add 1/2 in. (13 mm for rear vent)

B. Facing Material

Metal front faces may be covered with non-combustible materials only.

Facing and/or finishing materials must not interfere with air flow through louvers, operation of louvers or doors, or access for service.

Facing and/or finishing materials must never overhang into the glass opening.

Observe all clearances when applying combustible materials.

Seal joints between the finished wall and appliance top and sides using a 300º F (149º C) minimum sealant.

WARNING! Risk of Fire! DO NOT apply combustible materials beyond the minimum clearances. Comply with all minimum clearances to combustibles as specified in this manual. Overlapping materials could ignite and will interfere with proper operation of doors and louvers.

B

A

TOP VIEW

2-7/8 in.*

(73 mm)

MINIMUM

1/2 in.* (13 mm)

MINIMUM

3 ft. (914 mm) MAXIMUM

 

 

A

B

550TRSI-AUF

Inches

36

37

550TRSILP-AUF

millimeters

816

940

Figure 13.3 Noncombustible Facing Diagram

Figure 13.2 Combustible Mantel Leg or Wall Projections (Acceptable on both sides of opening)

Heat & Glo • 550TRSI-AUF, 550TRSILP-AUF2079-980 Rev. N • 5/12

63

Image 63
Contents Hot glass will cause burns Models 550TRSI-AUF 550TRSILP-AUFRef No GSCS20163 Sans 15392008 AS45532008 What to do if you smell gasModels 550TRSI-AUF, 550TRSILP-AUF Homeowner Reference Information CongratulationsNovida Testing Service Sans ComplianceSans User Guide Table of ContentsElectrical Information Appliance SetupTroubleshooting Gas InformationLimited Lifetime Warranty Australian Warranty InformationOther Rights Perth This warranty is void ifListing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan KitFinal inspection by Lighting Instructions IPIControl Module Operation Nine Hour Safety Shutdown FeatureAfter Fireplace is Lit Frequently Asked QuestionsMaintenance and Service Firebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsTypical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMinimum Framing Dimensions Mantel and Wall Projections Combustible MantelsCombustible Mantel Legs or Wall Projections Vent Termination Minimum Clearances Termination LocationsClearance MIN. Clearance in. mmVent Information and Diagrams V1 Minimum H1 Maximum Top Vent Horizontal TerminationMinimum + H 2 Maximum Top Vent Horizontal Termination Two ElbowsMin Max Three ElbowsStraight Up Vertical Flue System Top Vent Vertical TerminationFlue Termination Approvals Flue System Approvals And InstallationsH1 Maximum V1 + V2 Min Top Vent Vertical Termination Two ElbowsH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsRear Vent Horizontal Termination No Elbow One 45º ElbowH1 Minimum H1 Maximum H3H2 Rear Vent Horizontal Termination Two ElbowsRear Vent Vertical Termination One Elbow Two Elbows Minimum MaximumV1 Minimum H1 + H2 Maximum Rear Vent Vertical Termination Three Elbows Maximum Minimum + H 2 MaximumMinimum + H 2 + H Maximum Non-Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration Framing Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-Zone-240V Kit Flat Ceiling InstallationTop Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentSecuring and Leveling the Appliance Installing the Non-combustible BoardInstall Trim and/or Surround Components Removal For ServiceParts Replacement Adjustments And Replacement PartsAssemble Pipe Sections Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Firestops Install Support BracketsFlue Termination For Horizontal Terminations using the SLP-TRAP2 or DVP-TRAP2Heat Shield Requirements for Horizontal Termination Install Metal Roof FlashingInstall Vertical Termination Cap Assemble and Install Storm CollarGas Connection Gas InformationGAS Access Optional Remote Control Receiver Location Wiring RequirementsIntelliFire Plus Ignition System Wiring Optional Accessories RequirementsBlower Introduction Kit ContentsInstallation Precautions Fireplace Specific InformationInstallation of Remote Control Housing Changing Temperature ScaleAUX300CE Module Installation Fan InstallationProgramming the RC300AU to the Control Module Function Buttons Idle When Remote is in on ModeStandby mode Display ScreenAdjusting Fan Speed About on ModeAbout OFF Mode Adjusting Flame HeightPower Outage Adjusting ThermostatAdjusting Timer Setting the Child LockSymptom Possible Cause Corrective Action Frequently Asked Questions/TroubleshootingFinishing Facing Material816 940 Accessories Appliance SetupRemove Fixed Glass Assembly Clean the Appliance3 4 5 6 7 Log Placement InstructionsHeat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Heat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Troubleshooting Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters Inspect Maintenance Tasks Maintenance TasksDVP-AS2 Vent Components DiagramsMm Heat Shield 15-1/8 384 mm Effective LengthHorizontal Termination Cap DVP-HRC-SS DVP-HRC-ZC-SS 251 mm 165 mm165 mm 222 mm 235 mm 152 mm 168 mm ElbowHorizontal Heat Shield 15-1/8 384 mmEffective Cathedral CeilingLog Set Assembly Service PartsBeginning Manufacturing Date July Ending Manufacturing Date #19 Valve AssemblyConversion Kits Service Parts ListContact Information