Heat & Glo LifeStyle 550TRSI-AUF Top Vent Vertical Termination Two Elbows, H1 Maximum V1 + V2 Min

Page 32

Top Vent - Vertical Termination - (continued)

Two Elbows

Note: A 6 in. (152 mm) section of straight flue must be attached to the heater before a 90° elbow.

USE SLP SERIES COMPONENTS ONLY

V2

 

V1

H1 Maximum

V2

V1 + V2 Min.

Elbow only

Not allowed

*

*

*

6 in.

152 mm

2 ft.

610 mm

*

*

*

1 ft.

305 mm

4 ft.

1.22 m

*

*

*

2 ft.

610 mm

6 ft.

1.83 m

*

*

*

3 ft.

914 mm

8 ft.

2.44 m

*

*

*

4 ft.

1.22 m

12 ft.

3.66 m

*

*

*

5 ft.

1.52 m

16 ft.

4.88 m

*

*

*

V1 + V2 + H1 = 36 ft. (10.97 m) Maximum

*No specific restrictions on this value EXCEPT V1 + V2 cannot exceed 32 ft. (9.75 m)

H1

V1

Figure 7.10

32

Heat & Glo • 550TRSI-AUF, 550TRSILP-AUF2079-980 Rev. N • 5/12

 

Image 32
Contents Models 550TRSI-AUF 550TRSILP-AUF Ref No GSCS20163 Sans 15392008 AS45532008What to do if you smell gas Hot glass will cause burnsModels 550TRSI-AUF, 550TRSILP-AUF Congratulations Homeowner Reference InformationSans Novida Testing ServiceSans Compliance Table of Contents User GuideAppliance Setup TroubleshootingGas Information Electrical InformationAustralian Warranty Information Limited Lifetime WarrantyOther Rights This warranty is void if PerthListing and Code Approvals Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit Clear SpaceLighting Instructions IPI Final inspection byNine Hour Safety Shutdown Feature Control Module OperationFrequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionLogs FireboxGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMinimum Framing Dimensions Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Termination Locations Vent Termination Minimum ClearancesMIN. Clearance in. mm ClearanceVent Information and Diagrams Top Vent Horizontal Termination V1 Minimum H1 MaximumTop Vent Horizontal Termination Two Elbows Minimum + H 2 MaximumThree Elbows Min MaxTop Vent Vertical Termination Straight Up Vertical Flue SystemFlue System Approvals And Installations Flue Termination ApprovalsTop Vent Vertical Termination Two Elbows H1 Maximum V1 + V2 MinTop Vent Vertical Termination Three Elbows H1 + H2 V1 + V2 Minimum H1 + H2 MaximumH1 Minimum H1 Maximum Rear Vent Horizontal Termination No ElbowOne 45º Elbow Rear Vent Horizontal Termination Two Elbows H3H2V1 Minimum H1 + H2 Maximum Rear Vent Vertical Termination One Elbow Two ElbowsMinimum Maximum Minimum + H 2 + H Maximum Rear Vent Vertical Termination Three ElbowsMaximum Minimum + H 2 Maximum Vent Clearances and Framing Pipe Clearances to Combustibles Wall Penetration FramingCombustible Wall Penetration Non-Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPInstall Attic Insulation Shield Installing the Optional Heat-Zone-240V KitFlat Ceiling Installation Vaulted Ceiling InstallationAppliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outInstalling the Non-combustible Board Securing and Leveling the ApplianceComponents Removal For Service Parts ReplacementAdjustments And Replacement Parts Install Trim and/or SurroundInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Support Brackets Install FirestopsFor Horizontal Terminations using the SLP-TRAP2 or DVP-TRAP2 Flue TerminationInstall Metal Roof Flashing Heat Shield Requirements for Horizontal TerminationAssemble and Install Storm Collar Install Vertical Termination CapGas Information Gas ConnectionGAS Access Wiring Requirements IntelliFire Plus Ignition System WiringOptional Accessories Requirements Optional Remote Control Receiver LocationBlower Kit Contents Installation PrecautionsFireplace Specific Information IntroductionChanging Temperature Scale Installation of Remote Control HousingProgramming the RC300AU to the Control Module AUX300CE Module InstallationFan Installation Idle When Remote is in on Mode Standby modeDisplay Screen Function ButtonsAbout on Mode About OFF ModeAdjusting Flame Height Adjusting Fan SpeedAdjusting Thermostat Adjusting TimerSetting the Child Lock Power OutageFrequently Asked Questions/Troubleshooting Symptom Possible Cause Corrective Action816 940 FinishingFacing Material Appliance Setup Remove Fixed Glass AssemblyClean the Appliance AccessoriesLog Placement Instructions 3 4 5 6 7Heat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Heat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 IntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Troubleshooting Location Inches Millimeters Appliance Dimension DiagramReference Materials Maintenance Tasks Inspect Maintenance TasksVent Components Diagrams DVP-AS2Horizontal Termination Cap Mm Heat Shield 15-1/8 384 mmEffective Length DVP-HRC-SS DVP-HRC-ZC-SS 165 mm 165 mm 222 mm 235 mm 152 mm 168 mmElbow 251 mmHeat Shield 15-1/8 384 mm EffectiveCathedral Ceiling HorizontalService Parts Log Set Assembly#19 Valve Assembly Beginning Manufacturing Date July Ending Manufacturing DateService Parts List Conversion KitsContact Information