Heat & Glo LifeStyle 550TRSI-AUF owner manual Top Vent Vertical Termination Three Elbows

Page 33

Top Vent - Vertical Termination - (continued)

Three Elbows

 

V1

H1 + H2

V2

V1 + V2 Minimum

H1 + H2 Maximum

Elbow only

1 ft.

305 mm

*

*

*

1 ft.

305 mm

6 in.

 

152 mm

2 ft.

610 mm

*

*

*

2 ft.

610 mm

1 ft.

 

305 mm

2 ft.

610 mm

*

*

*

2 ft.

610 mm

2 ft.

 

610 mm

4 ft.

1.22 m

*

*

*

4 ft.

1.22 m

 

 

 

 

 

 

 

 

 

 

 

3 ft.

 

914 mm

6 ft.

1.83 m

*

*

*

6 ft.

1.83 m

 

 

 

 

 

 

 

 

 

 

 

4 ft.

 

1.22 m

8 ft.

2.44 m

*

*

*

8 ft.

2.44 m

 

 

 

 

 

 

 

 

 

 

 

5 ft.

 

1.52 m

12 ft.

3.66 m

*

*

*

12 ft.

3.66 m

 

 

 

 

 

 

 

 

 

 

H1 + H2 = 12 ft. (3.66 m) Maximum

V1 + V2 + H1 + H2 = 32 ft. (9.75 m) Maximum

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: A 6 in. (152 mm) section of straight flue

 

 

 

 

 

must be attached to the heater before a 90° elbow.

 

 

 

 

 

 

 

 

 

 

 

USE SLP SERIES COMPONENTS ONLY

V2

H1

H2

V1

INSTALLED

HORIZONTALLY

Figure 7.11

Heat & Glo • 550TRSI-AUF, 550TRSILP-AUF2079-980 Rev. N • 5/12

33

Image 33
Contents Ref No GSCS20163 Sans 15392008 AS45532008 Models 550TRSI-AUF 550TRSILP-AUFWhat to do if you smell gas Hot glass will cause burnsModels 550TRSI-AUF, 550TRSILP-AUF Homeowner Reference Information CongratulationsNovida Testing Service Sans ComplianceSans User Guide Table of ContentsTroubleshooting Appliance SetupGas Information Electrical InformationLimited Lifetime Warranty Australian Warranty InformationOther Rights Perth This warranty is void ifListing and Code Approvals Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit Clear SpaceFinal inspection by Lighting Instructions IPIControl Module Operation Nine Hour Safety Shutdown FeatureAfter Fireplace is Lit Frequently Asked QuestionsMaintenance and Service Gasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianLogs FireboxTypical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Any such action may cause a fire hazardSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMinimum Framing Dimensions Mantel and Wall Projections Combustible MantelsCombustible Mantel Legs or Wall Projections Vent Termination Minimum Clearances Termination LocationsClearance MIN. Clearance in. mmVent Information and Diagrams V1 Minimum H1 Maximum Top Vent Horizontal TerminationMinimum + H 2 Maximum Top Vent Horizontal Termination Two ElbowsMin Max Three ElbowsStraight Up Vertical Flue System Top Vent Vertical TerminationFlue Termination Approvals Flue System Approvals And InstallationsH1 Maximum V1 + V2 Min Top Vent Vertical Termination Two ElbowsH1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsRear Vent Horizontal Termination No Elbow One 45º ElbowH1 Minimum H1 Maximum H3H2 Rear Vent Horizontal Termination Two ElbowsRear Vent Vertical Termination One Elbow Two Elbows Minimum MaximumV1 Minimum H1 + H2 Maximum Rear Vent Vertical Termination Three Elbows Maximum Minimum + H 2 MaximumMinimum + H 2 + H Maximum Pipe Clearances to Combustibles Wall Penetration Framing Vent Clearances and FramingCombustible Wall Penetration Non-Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopInstalling the Optional Heat-Zone-240V Kit Install Attic Insulation ShieldFlat Ceiling Installation Vaulted Ceiling InstallationTop Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentSecuring and Leveling the Appliance Installing the Non-combustible BoardParts Replacement Components Removal For ServiceAdjustments And Replacement Parts Install Trim and/or SurroundAttach Vent to the Firebox Assembly Installing Vent Pipe DVP and SLP PipeAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Firestops Install Support BracketsFlue Termination For Horizontal Terminations using the SLP-TRAP2 or DVP-TRAP2Heat Shield Requirements for Horizontal Termination Install Metal Roof FlashingInstall Vertical Termination Cap Assemble and Install Storm CollarGas Connection Gas InformationGAS Access IntelliFire Plus Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Optional Remote Control Receiver LocationBlower Installation Precautions Kit ContentsFireplace Specific Information IntroductionInstallation of Remote Control Housing Changing Temperature ScaleAUX300CE Module Installation Fan InstallationProgramming the RC300AU to the Control Module Standby mode Idle When Remote is in on ModeDisplay Screen Function ButtonsAbout OFF Mode About on ModeAdjusting Flame Height Adjusting Fan SpeedAdjusting Timer Adjusting ThermostatSetting the Child Lock Power OutageSymptom Possible Cause Corrective Action Frequently Asked Questions/TroubleshootingFinishing Facing Material816 940 Remove Fixed Glass Assembly Appliance SetupClean the Appliance Accessories3 4 5 6 7 Log Placement InstructionsHeat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Heat & Glo 550TRSI-AUF, 550TRSILP-AUF 2079-980 Rev. N 5/12 Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Troubleshooting Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters Inspect Maintenance Tasks Maintenance TasksDVP-AS2 Vent Components DiagramsMm Heat Shield 15-1/8 384 mm Effective LengthHorizontal Termination Cap DVP-HRC-SS DVP-HRC-ZC-SS 165 mm 222 mm 235 mm 152 mm 168 mm 165 mmElbow 251 mmEffective Heat Shield 15-1/8 384 mmCathedral Ceiling HorizontalLog Set Assembly Service PartsBeginning Manufacturing Date July Ending Manufacturing Date #19 Valve AssemblyConversion Kits Service Parts ListContact Information