| Optional |
| Blower |
| Elevated Base |
Junction Box | FP1126 |
Fig. 47 Slide the elevated base platform into the cabinet until it contacts the back panel.
| Flange attaches | Cabinet Convection |
| to cabinet rear | Blower Housing |
| wall |
|
| Flange |
|
| attaches to |
|
| base |
|
Convectiion |
| |
Blower Power |
| |
Cord |
|
|
| Elevated Base | FP1127 |
|
| |
Fig. 48 | The cabinet convection blower in place behind the | |
base. |
|
|
WinterWarm Fireplace Insert or System
Use drywall screws to fasten the wall covering to the metal standoff and drywall stops at the cabinet. Drill pilot holes through the wall covering material and one thickness of the sheet metal with a #40 (.098”) drill bit. Tape and fill holes and/or seams and decorate your chase wall at this time.
11.Install the vent grilles. Position the cast grilles over the duct box openings, and mark for the four screw holes in each. Using a 5/32” (4mm) bit, drill through the drywall and duct box flanges, and install the grilles with the Phillips flat head black oxide screws.
Once the vent grilles have been installed, you are ready to complete the installation by installing the fire cham- ber and the front.
2000941 | 31 |