INSTALLATION

The P90 is approved for a maximum 40 ft. straight vertical, with rigid pipe 4" x 6-5/8" vent systems for Propane and Natural Gas, as per diagram.

The shaded area in the diagram show all allowable combinations of straight vertical and offset to vertical terminations with rigid pipe vent systems for Propane and Natural Gas. Maximum two 45o elbows allowed.

Vent must be supported at offsets

Firestops are required at each floor level and whenever passing through a wall.

Maintain clearances to combustibles as listed in the "Clearances" section.

Please note that all vertical measurements are taken from the base of the unit excluding risers or bottom stand-offs.

18

Excalibur® P90 Zero Clearance Direct Vent Gas Fireplace

Image 18
Contents P90 Zero Clearance Direct Vent Gas Fireplace 07/17/06Information for MOBILE/MANUFACTURED Homes After First Sale To the New OwnerTable of Contents Safety Label Copy of Safety Decal for P90Requirements For the State of Massachusetts onlyInstallation Checklist InstallationGeneral Safety Information Important Message Save These InstructionsHeatwave Locating Your GAS FireplaceManufactured Mobile Home Additional Requirements Optional Heat Release KITFraming Finishing Framing DimensionsCombustible Mantels Unit Base STAND-OFFSFacing Requirement Facing Over 1 25mm ThickFloor Mounted Fireplaces Raised Fireplaces Venting Introduction Unit Assembly Prior to InstallationTop Standoff Assembly Side Nailing StripsVenting FPI Direct Vent System Flex Horizontal Terminations OnlyExterior Vent Termination Locations Rigid Pipe Venting Components List SV4LB6Horizontal Rigid Pipe Venting SystemsAlternate Caps Horizontal & Vertical Terminations for 5 x 8 Venting Rigid Pipe Venting Arrangements Horizontal Terminations 8 outer diameterRigid Pipe Venting Arrangements Vertical Terminations Installation Option + H1 Horizontal Venting with Two 2 90o ElbowsHorizontal Venting with Three 3 90o Elbows Option + V1 H + H1Vertical Venting with Two 2 90o Elbows Vertical Venting with Three 3 90o ElbowsOption Below Grade Installation DiagramHorizontal Terminations This allows for small adjustments Vertical TerminationsInstallation Procedures Offset ChartFor FPI Direct Vent System Flex GAS Pipe Pressure Testing Pilot AdjustmentGAS Line Installation High ElevationConversion KIT #791-969 from NG to LP LPG Conversion Kit Contains Qty DescriptionInstallation of the DC Sparker for the H35-1 Units Only Installation of the DC Sparker For the P90 Units Only Ground Wire from Kit 2nd Grate Tab 02-75 02-54 02-52 02-50 02-53 02-51Bracket 02-53Front Brackets 02-5302-5102-50 02-53 Place embers in these 3 locations On the burner trayOptional Screen Door Glass Door InstallationArch Surround Screw BracketAccent KIT Installation Double & Single Door OptionThermostat Wire Table Remote ControlWall Switch Wall ThermostatWiring Diagrams Do not cut the ground terminal off under any circumstancesFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions Copy of the Lighting Plate Instructions Normal Operating Sounds of GAS AppliancesMaintenance Shut the power off FAN MaintenanceTo Install the Fan To Remove the FanHint Installing ValveRemoving Valve ImpossibleParts List P90 Main AssemblyDescription Heat Wave Duct KIT P90 Burner Assembly & LOG SET P90 Flush Front Accessories DescriptionExcalibur P90 Zero Clearance Direct Vent Gas Fireplace Excalibur P90 Zero Clearance Direct Vent Gas Fireplace Warranty Warranty Limited LifetimeInstaller Please complete the following information