CarAlarms.com P90-NG1 manual Removing Valve, Installing Valve, Hint, Impossible, Screws

Page 40

MAINTENANCE

REMOVING VALVE

1)Shut the power off.

2)Open the bottom louver door. Loosen the 2 screws holding the Burner ON/OFF switch and bracket to the bottom louver and lift the assembly out.

3)Remove the facade if installed.

4)Remove the glass door (Refer to the "Glass Door Installation" section).

5)Remove the logs.

6)Remove the burner/grate assembly by removing the two Phillips head screws and then slide the burner assembly to the left and lift out.

9)Disconnect the inlet gas line. See dia. 2.

10)Disconnect the 2 TP wires and the 2 TH wires from the valve.

11)Removethe12Phillipsheadscrewssecuring the valve tray assembly in place and then lift the entire assembly out.

Hint:

If you are using black pipe, ensure

 

that there is a union by the valve,

 

otherwise removal will be almost

 

impossible.

INSTALLING VALVE

1)Attach the valve to the valve bracket with the 4 (m5x8 metric) screws provided.

2)Reconnect the "gas out" fl are fi tting with an 11/16" wrench.

3)Reconnect the "gas out" fl are nut with a 13/16" wrench.

4)Install piezo ignitor push button assembly and reconnect wire.

5)Reconnect the quick drop out thermocouple nut with a 9mm wrench.

6)Reconnect the pilot tube nut with a 7/16" wrench.

screws

Valve Tray Assembly

Diagram 1: Remove the left and right screws and then slide the burner/grate assembly to the left and lift out.

7)Remove the rear log stand by removing the 2 screws.

screws

Rear Log Stand

7) Scrape off the old gasket from the floor of the

fi rebox and from the valve tray assembly.

8)Install a new gasket and reinstall the valve tray assembly.

Note: Failure to install a new gasket may severely affect the appliance performance.

9)

Reinstall the 10 hold down screws.

10)

Hook up the 2 TP and 2 TH wires to the

 

appropriate connections on the valve.

11) Reinstall the bottom brick panel, then screw

 

the 2 screws & sleeves through the brick

 

panel to the fi rebox base (reversing step 8)

 

leaving them about 1/4" (6mm) above the

 

brick panel. Reinstall the rear log stand.

12)

Install Burner/grate assembly

13)

Hook up the gas line and check for gas

 

leaks with a soap and water solution or a

 

gas leak detector. (Do not use open fl ame

8)Remove the 2 screws & sleeves on the bottom brick panel and lift out the bottom brick panel. The brick panel is very fragile - handle with care.

screws

12)Undo the pilot tube from the valve with a 7/16" wrench.

13)Undo the quick drop out thermocouple nut on the valve with a 9mm (metric) wrench.

14)Remove the Piezo igniter wire and push button assembly.

15)Undo the "gas out" fl are nut with a 13/16" wrench.

16)Undo the "gas out" fl are fi tting with an 11/16" wrench.

17)Remove the 4 Phillips head screws from the sides of the valve bracket and remove valve.

 

for leak testing.)

14)

Fire up the unit temporarily

15)

Check the manifold pressure.

16)

Reinstall the logs and brick panels as

 

needed.

17)

Reinstall the glass door and the facade.

18)

Fire up the unit again and check for proper

 

fl ame appearance and glow on logs.

40

Excalibur® P90 Zero Clearance Direct Vent Gas Fireplace

Image 40
Contents P90 Zero Clearance Direct Vent Gas Fireplace 07/17/06Information for MOBILE/MANUFACTURED Homes After First Sale To the New OwnerTable of Contents Safety Label Copy of Safety Decal for P90Requirements For the State of Massachusetts onlyInstallation General Safety InformationInstallation Checklist Important Message Save These InstructionsLocating Your GAS Fireplace Manufactured Mobile Home Additional RequirementsHeatwave Optional Heat Release KITFraming Dimensions Combustible MantelsFraming Finishing Unit Base STAND-OFFSFacing Over 1 25mm Thick Facing RequirementFloor Mounted Fireplaces Raised Fireplaces Unit Assembly Prior to Installation Top Standoff AssemblyVenting Introduction Side Nailing StripsVenting FPI Direct Vent System Flex Horizontal Terminations OnlyExterior Vent Termination Locations Rigid Pipe Venting Components List SV4LB6Rigid Pipe Venting Systems AlternateHorizontal CapsHorizontal & Vertical Terminations for 5 x 8 Venting Rigid Pipe Venting Arrangements Horizontal Terminations 8 outer diameterRigid Pipe Venting Arrangements Vertical Terminations Installation Horizontal Venting with Two 2 90o Elbows Horizontal Venting with Three 3 90o ElbowsOption + H1 Option + V1 H + H1Vertical Venting with Three 3 90o Elbows Vertical Venting with Two 2 90o ElbowsOption Diagram Below Grade InstallationHorizontal Terminations This allows for small adjustments Vertical TerminationsOffset Chart Installation ProceduresFor FPI Direct Vent System Flex Pilot Adjustment GAS Line InstallationGAS Pipe Pressure Testing High ElevationConversion KIT #791-969 from NG to LP LPG Conversion Kit Contains Qty DescriptionInstallation of the DC Sparker for the H35-1 Units Only Installation of the DC Sparker For the P90 Units Only Ground Wire from Kit 02-75 02-54 02-52 02-50 02-53 02-51 Bracket2nd Grate Tab 02-5302-5302-51 02-50 02-53Front Brackets Place embers in these 3 locations On the burner trayGlass Door Installation Arch SurroundOptional Screen Door Screw BracketAccent KIT Installation Double & Single Door OptionRemote Control Wall SwitchThermostat Wire Table Wall ThermostatWiring Diagrams Do not cut the ground terminal off under any circumstancesFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions Copy of the Lighting Plate Instructions Normal Operating Sounds of GAS AppliancesMaintenance FAN Maintenance To Install the FanShut the power off To Remove the FanInstalling Valve Removing ValveHint ImpossibleP90 Main Assembly Parts ListDescription Heat Wave Duct KIT P90 Burner Assembly & LOG SET P90 Flush Front Accessories DescriptionExcalibur P90 Zero Clearance Direct Vent Gas Fireplace Excalibur P90 Zero Clearance Direct Vent Gas Fireplace Warranty Warranty Limited LifetimeInstaller Please complete the following information