CarAlarms.com P90-NG1 manual Rigid Pipe Venting Arrangements Vertical Terminations

Page 17

INSTALLATION

RIGID PIPE VENTING ARRANGEMENTS - VERTICAL TERMINATIONS

The shaded area in the diagram shows all allowable combinations of straight vertical and offset to vertical terminations, using two 90o elbow, with rigid pipe vent systems for Propane and Natural Gas.

Vent must be supported at offsets.

Firestops are required at each floor level and whenever passing through a wall.

Maintain clearances to combustibles.

Note: Must use optional rigid pipe adaptor when using rigid vent systems (Part # 510-994).

Excalibur® P90 Zero Clearance Direct Vent Gas Fireplace

17

Image 17
Contents 07/17/06 P90 Zero Clearance Direct Vent Gas FireplaceTo the New Owner Information for MOBILE/MANUFACTURED Homes After First SaleTable of Contents Copy of Safety Decal for P90 Safety LabelFor the State of Massachusetts only RequirementsGeneral Safety Information InstallationInstallation Checklist Important Message Save These InstructionsManufactured Mobile Home Additional Requirements Locating Your GAS FireplaceHeatwave Optional Heat Release KITCombustible Mantels Framing DimensionsFraming Finishing Unit Base STAND-OFFSFloor Mounted Fireplaces Raised Fireplaces Facing RequirementFacing Over 1 25mm Thick Top Standoff Assembly Unit Assembly Prior to InstallationVenting Introduction Side Nailing StripsFPI Direct Vent System Flex Horizontal Terminations Only VentingExterior Vent Termination Locations SV4LB6 Rigid Pipe Venting Components List Alternate Rigid Pipe Venting Systems Horizontal CapsHorizontal & Vertical Terminations for 5 x 8 Venting 8 outer diameter Rigid Pipe Venting Arrangements Horizontal TerminationsRigid Pipe Venting Arrangements Vertical Terminations Installation Horizontal Venting with Three 3 90o Elbows Horizontal Venting with Two 2 90o ElbowsOption + H1 Option + V1 H + H1Option Vertical Venting with Two 2 90o ElbowsVertical Venting with Three 3 90o Elbows Horizontal Terminations Below Grade InstallationDiagram Vertical Terminations This allows for small adjustmentsFor FPI Direct Vent System Flex Installation ProceduresOffset Chart GAS Line Installation Pilot AdjustmentGAS Pipe Pressure Testing High ElevationLPG Conversion Kit Contains Qty Description Conversion KIT #791-969 from NG to LPInstallation of the DC Sparker for the H35-1 Units Only Installation of the DC Sparker For the P90 Units Only Ground Wire from Kit Bracket 02-75 02-54 02-52 02-50 02-53 02-512nd Grate Tab 02-5302-50 02-53 02-5302-51Front Brackets Place embers in these 3 locations On the burner trayArch Surround Glass Door InstallationOptional Screen Door Screw BracketDouble & Single Door Option Accent KIT InstallationWall Switch Remote ControlThermostat Wire Table Wall ThermostatDo not cut the ground terminal off under any circumstances Wiring DiagramsFor Propane Units and Units Equipped with DC Spark Boxes Operating Instructions Normal Operating Sounds of GAS Appliances Copy of the Lighting Plate InstructionsMaintenance To Install the Fan FAN MaintenanceShut the power off To Remove the FanRemoving Valve Installing ValveHint ImpossibleDescription Parts ListP90 Main Assembly Heat Wave Duct KIT P90 Burner Assembly & LOG SET Description P90 Flush Front AccessoriesExcalibur P90 Zero Clearance Direct Vent Gas Fireplace Excalibur P90 Zero Clearance Direct Vent Gas Fireplace Warranty Limited Lifetime WarrantyInstaller Please complete the following information