Waterford Appliances E65-LP1 Straight Vertical Terminations, Offset to Vertical Terminations

Page 13

INSTALLATION

RIGID PIPE VENTING - VERTICAL TERMINATIONS

FOR BOTH RESIDENTIAL & MANUFACTURED HOMES/MOBILE HOMES

The shaded areas in the two diagrams below show all allowable combinations of straight vertical and offset to vertical runs with vertical terminations. Maximum two 45o elbows, not including the 45o elbow attached to the unit. All vertical and offset to vertical vent installations require Vent Restrictor #1. If the vent is ENCLOSED in a chase (min. size 9" x 9") maintain a 1-1/4" clearance to combustibles.

Straight Vertical Terminations

(Vent Restrictor #1)

Offset to Vertical Terminations

(Vent Restrictor #1)

Rigid Pipe Venting - Horizontal Terminations

Only for Units Converted to Lower Btu Rating: 27,000 (NG), 29,000 (LP)

The two diagrams below show all allowable combinations of straight horizontal termination with one 45o elbow off the unit.

Dura-Vent Snorkel Termination

Riser Vent Termination

Waterford E65-1 Emerald Direct Vent Freestanding Gas Stove

13

Image 13
Contents Models E65-NG1 Natural Gas Emerald Direct Vent Freestanding Gas StoveWaterford Unit SpecificationsTo the New Owner Table of Contents Copy of Safety Label for E65-NG1 Natural Gas Stove Safety LabelCopy of Safety Label for E65-LP1 Propane Stove Specifications InstallationSave These Instructions Information for MobileInstallation Checklist General Safety InformationClearances to Combustibles Manufactured Mobile Home Additional Requirements Locating Your Optional FAN Installation Emerald GAS StoveCombustion and Ventilation AIR Introduction Precautions InstallationSafety Precautions for the Installer Ance adapterExterior Vent Terminal Locations 4DT-AJB Rigid Pipe Venting Components ListHorizontal Venting Rigid Pipe Venting Horizontal TerminationsVenting Arrangements Examples Offset to Vertical Terminations Straight Vertical TerminationsVent Restrictor #1 Required Parts Vertical Termination with CO-LINEAR Flex SystemDescription Alternate Approved CapsMinimum components for a Horizontal Installa- tion Miniumum Horizontal Termination InstallationsDV Stove Horizontal Vent KIT Optional ComponentsInstallation DURA-VENT Termination KIT Planning Your Dura-Vent InstallationAlternate Horizontal Termination Caps Minimum components for a Dura-Vent Horizontal InstallationMinimum components for a Dura-Vent Vertical Termination Dura-Vent Basic Horizontal Kit #Below Grade Snorkel Installation DURA-VENT Horizontal InstallationsSnorkel Terminations # 942 over the vent pipe DURA-VENT Vertical TerminationCathedral Ceilings Offset ChartRound Support RDS Square Support SQS Support Extensions Round Rdse or Square Sqse Prior to installation and connectionGeneral Converting a Factory Built Metal ChimneyConverting a Masonry Chimney High Elevation Aeration AdjustmentGAS Connection With 38,000 BTUConversion KIT from Natural GAS to Propane GAS Pipe Pressure TestingValve Description Natural Gas Conversion Kit 260-920 Contains Reduction KIT to Lower BTU Rating for E65-1 GAS StovePropane Conversion Kit 260-922 Contains Optional Door Grill Installation LOG InstallationDoor Grill Kit Contains Optional Wall Thermostat Optional Remote ControlFinal Check Lighting Procedure Wiring Diagram E65-NG1 & E65-LP1Operating Instructions Operating InstructionsFirst Fire Shutdown ProcedureCopy of the Lighting Plate instructions Adjusting Flame Height MaintenanceMaintenance Instructions Automatic Convection FAN OperationLOG Replacement General Vent MaintenanceGlass Replacement FAN MaintenanceTo remove valve from valve assembly, continue Installing Valve AssemblyRemoving Valve To remove fanMain Assembly Parts ListBurner & LOG Assembly Waterford E65-1 Emerald Direct Vent Freestanding Gas Stove Waterford E65-1 Emerald Direct Vent Freestanding Gas Stove Page Conditions WarrantyRegister your Waterford online at