Waterford Appliances Operating Instructions, Wiring Diagram E65-NG1 & E65-LP1

Page 29

OPERATING INSTRUCTIONS

WIRING DIAGRAM - E65-NG1 & E65-LP1

If any of the original wires as supplied with the appliance must be replaced, it must be replaced with CSA type SEW (200oC) or its equivalent.

This heater does not require a 120V A.C. supply for operation. In case of a power failure, the burner switch and the optional remote control/ thermostat will continue to operate. However, a 120V A.C. power supply is needed for the fan/blower operation.

Caution: Ensure that the wires do not touch any hot surfaces and are away from sharp edges.

CAUTION: Label all wires prior to disconnection when servicing con- trols. Wiring errors can cause im- proper and dangerous operation.

WARNING: Electrical Grounding

Instructions

This appliance is equipped with a three pronged (grounding) plug for your protection against shock haz- ard and should be plugged directly into a properly grounded three-prong receptacle. Do not cut or remove the grounding prong from this plug.

OPERATING

INSTRUCTIONS

1)Read and understand these instructions before operating this appliance.

2)Check to see that all wiring is correct and enclosed to prevent possible shock.

3)Check to ensure there are no gas leaks.

4)Make sure the glass in the door frame is properly positioned. Never operate the appliance with the glass removed. Never strike the glass or slam the door shut.

5)Verify that the venting and cap are unob- structed.

6)Verify log placement. If the pilot cannot be

seen when lighting the unit - the logs have been incorrectly positioned.

7)The unit should never be turned off, and on again without a minimum of a 60 second wait.

LIGHTING

PROCEDURE

IMPORTANT: Gas cock knob cannot be turned from "PILOT" to "OFF" unless it is partially depressed.

1)Turn stove OFF using the Burner "ON/OFF" switch remote or thermostat.

2)Turn gas control knob so indicator points to "OFF" position and allow 5 minutes for any gas in the combustion chamber to escape.

3)Turn gas control knob counterclockwise so indicator points to the "PILOT" position. Depress the gas control knob fully. De- press the igniter button several times until the pilot lights. After approximately one minute, release the gas control knob. The pilot flame should continue to burn. If the

Waterford E65-1 Emerald Direct Vent Freestanding Gas Stove

29

Image 29
Contents Models E65-NG1 Natural Gas Emerald Direct Vent Freestanding Gas StoveTo the New Owner Unit SpecificationsWaterford Table of Contents Copy of Safety Label for E65-NG1 Natural Gas Stove Safety LabelCopy of Safety Label for E65-LP1 Propane Stove Specifications InstallationSave These Instructions Information for MobileClearances to Combustibles General Safety InformationInstallation Checklist Combustion and Ventilation AIR Locating Your Optional FAN Installation Emerald GAS StoveManufactured Mobile Home Additional Requirements Introduction Precautions InstallationSafety Precautions for the Installer Ance adapterExterior Vent Terminal Locations 4DT-AJB Rigid Pipe Venting Components ListVenting Arrangements Examples Rigid Pipe Venting Horizontal TerminationsHorizontal Venting Vent Restrictor #1 Straight Vertical TerminationsOffset to Vertical Terminations Required Parts Vertical Termination with CO-LINEAR Flex SystemDescription Alternate Approved CapsMinimum components for a Horizontal Installa- tion Miniumum Horizontal Termination InstallationsDV Stove Horizontal Vent KIT Optional ComponentsInstallation DURA-VENT Termination KIT Planning Your Dura-Vent InstallationAlternate Horizontal Termination Caps Minimum components for a Dura-Vent Horizontal InstallationMinimum components for a Dura-Vent Vertical Termination Dura-Vent Basic Horizontal Kit #Snorkel Terminations DURA-VENT Horizontal InstallationsBelow Grade Snorkel Installation # 942 over the vent pipe DURA-VENT Vertical TerminationRound Support RDS Square Support SQS Offset ChartCathedral Ceilings Support Extensions Round Rdse or Square Sqse Prior to installation and connectionGeneral Converting a Factory Built Metal ChimneyConverting a Masonry Chimney High Elevation Aeration AdjustmentGAS Connection With 38,000 BTUValve Description GAS Pipe Pressure TestingConversion KIT from Natural GAS to Propane Propane Conversion Kit 260-922 Contains Reduction KIT to Lower BTU Rating for E65-1 GAS StoveNatural Gas Conversion Kit 260-920 Contains Door Grill Kit Contains LOG InstallationOptional Door Grill Installation Final Check Optional Remote ControlOptional Wall Thermostat Lighting Procedure Wiring Diagram E65-NG1 & E65-LP1Operating Instructions Operating InstructionsCopy of the Lighting Plate instructions Shutdown ProcedureFirst Fire Adjusting Flame Height MaintenanceMaintenance Instructions Automatic Convection FAN OperationLOG Replacement General Vent MaintenanceGlass Replacement FAN MaintenanceTo remove valve from valve assembly, continue Installing Valve AssemblyRemoving Valve To remove fanMain Assembly Parts ListBurner & LOG Assembly Waterford E65-1 Emerald Direct Vent Freestanding Gas Stove Waterford E65-1 Emerald Direct Vent Freestanding Gas Stove Page Conditions WarrantyRegister your Waterford online at