Waterford Appliances E65-LP1 DURA-VENT Termination KIT, Planning Your Dura-Vent Installation

Page 17

INSTALLATION

point, stainless steel). Note: pilot holes will need to be drilled through the wall thimble on all 4 corners.

Note: The four screws provided for the vent cap should be replaced with appropriate fasteners for stucco, brick, concrete, or other types of sidings.

6)A bead of non-hardening mastic should be run around both the termination and vinyl siding standoff to prevent water from en- tering and to make a tight seal between the cap and the standoff.

7)Stretch the 4" dia. flex liner out fully and get a trial fit of the liner onto the 4" dia. starter collar.

8)Cut the 4" dia. flex liner to the desired size.

Hint: leave an extra 12" to 16" of length, this will make the final assembly easier to work with.

9)Secure the 4" dia. flex liner to the 4" adapter with Mill-Pac and 3 of the #8 x 1/2" screws (stainless steel).

10)Slide the decorative Thimble Cover over the pipe sections and secure with 4 screws (#8 x 1-1/2" drill point, black) to the wall.

11)Slide the 90o elbow (crimp end up), the 45o elbow and the 4 ft. pipe section (crimp end up) over the 4" dia. flex liner.

12)Install the spring spacers onto the pipe sections.

13)Secure the 4" dia. flex liner with adapter onto the stove collar. Put a bead of Mill-Pac around the appliance adapter and secure with 3 screws (#8 x 1/2, stainless steel).

14)Attach the 45o elbow onto the starter collar by sealing with Mill-Pac and/or high tem- perature silicone and securing with 3 of the #8 x 1/2" (black) screws.

15)Attach the pipe section to the 45o elbow by sealing with Mill-Pac and/or high tempera- ture silicone and securing with 3 of the #8 x 1/2" screws (black). Pipe seams should be facing the wall.

16)Attach the 90o elbow onto the pipe section by sealing with Mill-Pac and/or high tem- perature silicone and securing with 3 of the #8 x 1/2" screws (black).

17)Slide the adjustable pipe section onto the 90o elbow. Slide the trim collar over the adjustable pipe sections to cover the joint of the telescopic section.) The flex may have to be compressed back in order for the adjustable pipe to properly mate to the elbow. Seal with Mill-Pac and/or high

temperature silicone and secure with 3 of the #8 x 1/2" screws (black). Pipe seams facing down.

18)Install the trim collar over the starter collar and secure with a #8 x 1/2" screw (black).

If the pipe needs to be touched up, use only Stove Brite High Temperature Metallic Black Stove Paint.

NOTE: All inner joints must be sealed with Mill-Pac. All outer joints may be sealed with high temperature silicone.

DURA-VENT

TERMINATION KIT

Planning Your Dura-Vent

Installation

There are two basic types of Dura-Vent Direct Vent System installations: horizontal termina- tion and vertical termination. Confirm the maxi- mum horizontal run and maximum vertical rise from the diagrams on pages 12 and 13.

When planning your installation, it will be neces- sary to select the proper length of vent pipe for your particular requirements. For horizontal installations, determine the minimum clearance from the rear of the unit to the wall. It is also important to note the wall thickness. (The wall thimble is suitable for 2 x 4 or 2 x 6 wall construction.) Select the amount of vertical rise desired for "vertical-to-horizontal" type installa- tions.

Warning: Always maintain required clearances (air spaces) to nearby combustibles to prevent a fire haz- ard. Do not fill air spaces with insu- lation.

The minimum clearance requirements between the outer wall of the vent pipe and nearby combustible surfaces is 1-1/4 inch. Be sure to check the vent termination clearance require- ments from decks, windows, soffits, gas reg- ulators, air supply inlets and public walkways as specified in the Exterior Vent Terminal Loca- tions on page 10 and in your local building codes.

To determine the length of vent pipe required for vertical installations, measure the distance from

the unit flue outlet to the ceiling, the ceiling thickness, the vertical rise in an attic or second storey, and allow for sufficient vertical height above the roof line.

For multi-storey applications, fire stops are required at each floor level. If an offset is needed, additional pipe, elbows and supports will be required.

Do not exceed the maximum number of elbows. One 90o for horizontal terminations and two 45o for vertical termination.

Waterford E65-1 Emerald Direct Vent Freestanding Gas Stove

17

Image 17
Contents Models E65-NG1 Natural Gas Emerald Direct Vent Freestanding Gas StoveTo the New Owner Unit SpecificationsWaterford Table of Contents Copy of Safety Label for E65-NG1 Natural Gas Stove Safety LabelCopy of Safety Label for E65-LP1 Propane Stove Specifications InstallationSave These Instructions Information for MobileClearances to Combustibles General Safety InformationInstallation Checklist Combustion and Ventilation AIR Locating Your Optional FAN Installation Emerald GAS StoveManufactured Mobile Home Additional Requirements Introduction Precautions InstallationSafety Precautions for the Installer Ance adapterExterior Vent Terminal Locations 4DT-AJB Rigid Pipe Venting Components ListVenting Arrangements Examples Rigid Pipe Venting Horizontal TerminationsHorizontal Venting Vent Restrictor #1 Straight Vertical TerminationsOffset to Vertical Terminations Required Parts Vertical Termination with CO-LINEAR Flex SystemDescription Alternate Approved CapsMinimum components for a Horizontal Installa- tion Miniumum Horizontal Termination InstallationsDV Stove Horizontal Vent KIT Optional ComponentsInstallation DURA-VENT Termination KIT Planning Your Dura-Vent InstallationAlternate Horizontal Termination Caps Minimum components for a Dura-Vent Horizontal InstallationMinimum components for a Dura-Vent Vertical Termination Dura-Vent Basic Horizontal Kit #Snorkel Terminations DURA-VENT Horizontal InstallationsBelow Grade Snorkel Installation # 942 over the vent pipe DURA-VENT Vertical TerminationRound Support RDS Square Support SQS Offset ChartCathedral Ceilings Support Extensions Round Rdse or Square Sqse Prior to installation and connectionGeneral Converting a Factory Built Metal ChimneyConverting a Masonry Chimney High Elevation Aeration AdjustmentGAS Connection With 38,000 BTUValve Description GAS Pipe Pressure TestingConversion KIT from Natural GAS to Propane Propane Conversion Kit 260-922 Contains Reduction KIT to Lower BTU Rating for E65-1 GAS StoveNatural Gas Conversion Kit 260-920 Contains Door Grill Kit Contains LOG InstallationOptional Door Grill Installation Final Check Optional Remote ControlOptional Wall Thermostat Lighting Procedure Wiring Diagram E65-NG1 & E65-LP1Operating Instructions Operating InstructionsCopy of the Lighting Plate instructions Shutdown ProcedureFirst Fire Adjusting Flame Height MaintenanceMaintenance Instructions Automatic Convection FAN OperationLOG Replacement General Vent MaintenanceGlass Replacement FAN MaintenanceTo remove valve from valve assembly, continue Installing Valve AssemblyRemoving Valve To remove fanMain Assembly Parts ListBurner & LOG Assembly Waterford E65-1 Emerald Direct Vent Freestanding Gas Stove Waterford E65-1 Emerald Direct Vent Freestanding Gas Stove Page Conditions WarrantyRegister your Waterford online at