Installation • Instalación
Installation • Instalação
9
4
1 | 2 | 3 | 4 | 5 | 5 | 6 | 7 | 8 |
english
1.Feed pipe and fitting at least ½ ! ‘’
2.No filters in feed line
3.Slope in feed line > 1%!
4.Only use ball valves!
5.Operating pressure: min. 12 psig max. 240 psig
6.Short pressure hose!
7.For each metre of rising slope in the outlet line, the required mini- mum pressure will increase by 1.5 psig.
The rise of the outlet line must not exceed 17 feet!
8.Lay collecting line (min. ½” ) with 1% of slope.
9.Lead discharge pipe from the top into collecting line.
wrong • no correcto | correct • correcto |
incorrect • incorrecto | correct • correcto |
Note: Pressure differences!
Each condensate source must be drained separately!
Note: Venting!
If the feed line cannot be laid with sufficient slopeor if there are other inflow problems, it will be necessary to install a venting line!
<
>77
<
Note: Deflector area!
If drainage is to take place directly from a line, it is advisable to arrange the piping so that the air flow is di- verted.
6 | BEKOMAT 21, 21 PRO |