Burnham V8 Series manual Section XI Maintenance and Service Instructions

Page 74

SECTION XI: MAINTENANCE AND SERVICE INSTRUCTIONS

A.MAINTENANCE OF LOW WATER CUT- OFF DEVICES

WARNING

Probe and float type low water cut-off devices require annual inspection and maintenance.

1.PROBE TYPE LOW WATER CUT-OFF Although these devices are solid state in their operation, the probe is exposed to possible contamination in the boiler water and subject to fouling.

It is important to physically remove the probe from the boiler tapping annually and inspect that probe for accumulation of scale or sediment.

Follow these steps to inspect, clean and/or replace the probe:

a.Turn off electric service to the boiler.

b.Drain boiler water to a level below the tapping for the probe.

c.Disconnect wiring connections between the low water cut-off control and the probe.

d.Remove the low water cut-off control from the probe.

DANGER

Assure that the boiler is at z ero pressure before removing the LWCO probe. Do not rely on the pressure gauge to indicate that the boiler is at z ero pressure. Open the safety valve to relieve all internal pressure prior to proceeding. Safety valve discharge piping must be piped such that the potential for burns is eliminated.

e.Unscrew the probe from the boiler tapping.

f.Inspect that portion of the probe that is exposed to the boiler water for a scale or sediment buildup.

g.Light deposits may be removed by wiping the probe with a damp cloth. Wiping the probe with a cloth soaked in vinegar will remove more tenacious lime deposits. The most stubborn deposits may be removed from the probe by using a diluted amount, 3 parts of water to 1 part of phosphoric acid (H2PO4).

CAUTION

Exercise caution when handling phosphoric acid and follow the instruction label on its container.

h.Clean the pipe threads of the probe to remove old, hardened pipe dope and other foreign matter.

i.Apply a moderate amount of good quality pipe dope to the pipe threads on the probe, leaving the two end threads bare. Do not use PTFE (Teflon) tape.

j.Screw the probe into the boiler tapping.

k.Mount the low water cut-off control on the probe.

l.Reconnect the control to probe wiring.

m.Fill the boiler to its normal waterline.

n.Add boiler water treatment compound as needed (refer to Paragraph B.).

o.Restore electric service to the boiler.

p.Fire burner to bring the water in the boiler to a boil to drive off free oxygen.

q.WARNING — BEFORE RETURNING BOILER TO SERVICE: Follow the low water cut-off check out procedure in Section X, Paragraph I, No. 4.

2.FLOAT TYPE LOW WATER CUT-OFF During the heating season, if an external low water cut-off is on the boiler, the blow off valve should be opened once a month (use greater frequency where conditions warrant), to flush out the sediment chamber so the device will be free to function properly.

Low water cut-offs and water feeders should be dismantled annually by qualified personnel, to the extent necessary to insure freedom from obstructions and proper functioning of the working parts. Inspect connecting lines to boiler for accumulation of mud, scale, etc., and clean as required. Examine all visible wiring for brittle or worn insulation and make sure electrical contacts are clean and that they function properly. Give special attention to solder joints on bellows and float when this type of control is used. Check float for evidence of collapse and check mercury bulb (where applicable) for mercury separation or discoloration. Do not attempt to repair mechanisms in the field. Complete replacement mechanisms, including necessary gaskets and installation instructions are available from the manufacturer.

B.BOILER AND SYSTEM CLEANING INSTRUCTIONS FOR TROUBLE FREE OPERATION

1.STEAM BOILERS

a.Oil, greases & sediments which accumulate in a new boiler and piping must be removed in order to prevent an unsteady water line and carry over of the water into the supply main above boiler.

74

Image 74
Contents V8 Series Important Information Read Carefully USA BoilersPage Table of Contents Dimensional Data see Figures 1A Thru 1D V82 thru V89 Water Boiler without Tankless Heater V83 thru V89 Water Boiler with Front Tankless Heater V83 thru V89 Water Boiler with Rear Tankless Heater V83 thru V89 Steam Boiler with or without Tankless Heater Section I PRE-INSTALLATION Page Do not allow any flueway blockage by gasket Section II Knockdown Boiler AssemblyRemoval of Bare Boiler from Skid Boiler Tapping Locations and Usage Knockdown Boilers Only Knockdown Boiler Jacket Assembly Install Boiler JACKET. See FigureOil Burner Installation Beckett Burner Shown Install Beckett OIL BURNER. See FigureSteam Boilers Only Do not install burner without gasketInstall Carlin 102CRD OIL BURNER. See Figure Combustion Head Adjustment Water Boilers OnlyInstall Carlin Elite EZ OIL BURNER. See Figure Installation/Removal of Drawer Assembly Nozzle Replacement Install probe type Low Water Cut-Off Lwco if so equipped Float-Type Low Water Cut-Off Pressure Limit Installation Aquastat bulb must be fully inserted into the wellInstall Trim and Controls with Carlin 102CRD Burner Burners Supplied by Burnham utilize Install Trim and Controls with Carlin Elite EZ BurnerInstall Trim and Controls with Riello Burner Page Remove Boiler from Skid Section III Packaged Boiler AssemblyRemove Crate Do not drop boiler. Do not bump boiler jacket against floorPage Page Steam or Water Boilers Install Safety or Relief Valve in Tapping M Inspect Nozzle and ElectrodesSection IV Water Boiler Piping and Trim Evaluate the Existing Water SystemPage Recommended Water Piping for Circulator Zoned Heating System Page Page Section V Steam Boiler Piping and Trim Evaluate the Existing Steam SystemPage Section VI Tankless and Indirect Water Heater Piping GPM Alliance Water Heater Piping with V8 Boiler Connect Alliance Indirect Water Heater Piping as shown in BDo not exceed maximum allowable air intake length Section VII Venting and AIR Intake PipingGeneral Venting Guidelines Recommended Vent Pipe Arrangement and Chimney Requirements Seal all external joints with weatherproof caulk Section Viii Electrical GeneralBoiler Sequence of Operation with Probe Lwco Page Page Jumper Page Page Boiler Sequence of Operation with Float Lwco Page Page Boiler Sequence of Operation Page Page Boiler Sequence of Operation Page Page Boiler Sequence of Operation Page Page Section IX OIL Piping Single Pipe OIL LinesTWO Pipe OIL Lines SINGLE-STAGE Units 3450 RPM TWO Pipe SystemsFill Heating System with Water Always Inspect Installation Before Starting BurnerSection X System START-UP Carlin 102CRD Burners Adjust OIL Burner Before StartingBeckett Burners Carlin Elite EZ BurnersStart OIL Burner Adjust OIL Burner While OPERATING. flame presentRiello Burners L1 and V1 Head Electrode Check for Clean CUT OFF of Burner Test ControlsCAD Cell Resistance When Sensing Flame Aquastat Switching Action Within L8124C Control Jumper must be removed after this checkAquastat Switching Action Within L8148A Controls Avoid Breathing Fiber Particulates and Dust Section XI Maintenance and Service Instructions Maintenance of LOW Water CUT- OFF DevicesPage Frequent Water Addition Gal/Month V83 V85 V87 V89 V84 V86 V88 14½Page Clean TOP of Boiler Sections if cleaning from the top Section XII Boiler CleaningClean the Flueways See Figure Clean the Combustion ChamberCleaning of Boiler Flueways OIL Primary Control Section Xiii Trouble ShootingCombustion Section XIV Repair Parts Bare Boiler Assembly Bare Boiler Assembly Bare Boiler Assembly Bare Boiler Assembly 1BBJacket Assembly Page V83 Thru V89 Steam Boilers Trim and Controls V83 Thru V89 Steam Boilers Trim and Controls V82 Thru V89 Water Boilers Trim and Controls V82 Thru V89 Water Boilers Trim and Controls Beckett AFG Burner Beckett OIL Burner Part NOS. for V8 Series Boilers Beckett OIL Burner Part NOS. for V8 Series Boilers Carlin OIL Burner Part Numbers for V8 Series Boilers Burner Specifications XV. LOW Water CUT OFF Lwco WhenService Record Limited Warranty For Residential Cast Iron Steam Boilers

V8 Series specifications

The Burnham V8 Series is a prestigious line of oil-fired boilers renowned for their efficiency, reliability, and advanced design features. Tailored for residential and light commercial applications, this series exemplifies the perfect blend of tradition and modern technology, ensuring long-term performance and comfort for users.

One of the hallmark features of the Burnham V8 Series is its exceptional cast iron construction, which provides durability and superior heat retention. This robust design allows for an extended lifespan while ensuring that the boiler can withstand the rigors of daily use. The cast iron sections are engineered to facilitate optimal heat transfer and efficiency.

The V8 Series boasts an impressive fuel efficiency rating, often exceeding 85%. This high efficiency is achieved through a combination of advanced combustion technology and the boiler's thoughtful design, which minimizes heat loss. Users benefit not only from lower energy bills but also from a reduced environmental footprint, making the Burnham V8 Series a sustainable choice for heating solutions.

In terms of technology, the Burnham V8 Series features a standing pilot ignition system or an optional intermittent ignition device that enhances safety and efficiency. The advanced burner design allows for smooth operation and excellent fuel utilization, further contributing to the overall economy of the system.

Another notable characteristic is the versatility of the Burnham V8 Series. It can be easily adapted to work with various heating systems, including hot water heating applications. Its compatibility with different fuels, such as natural gas or oil, gives users the flexibility to choose the best energy source for their needs, providing longevity and value.

The installation process is made straightforward with ample connectivity options for plumbing and flue. Its compact design enables easier placement within homes or commercial spaces without compromising performance. Furthermore, the boiler is backed by extensive warranties, ensuring peace of mind for homeowners and businesses alike.

In conclusion, the Burnham V8 Series stands out as a reliable and efficient heating solution, blending robust construction with advanced technology. Its commitment to performance, versatility, and efficiency makes it an excellent choice for meeting the heating demands of various applications while promoting environmental responsibility. Whether for a single-family home or a light commercial building, the Burnham V8 Series remains a trusted leader in the industry.