1.Remove (2) #6 x 1/2" lg. machine screws and
2.Secure 2" x 4" junction box to jacket front panel with (2) #8 x 3/8" lg. sheet metal screws using pre- punched holes below tridicator or pressure gauge tapping.
3.Complete the field wiring phase of Paragraphs N & O (Beckett), P (Carlin 102CRD), Q (Carlin Elite EZ) or R (Riello) Install end of harness from low water
4.Use wire nuts to connect wires from control or power source to (3) pigtail wires connected to spade terminals on rear of power outlet receptacle. Make the connections as shown in appropriate wiring diagram based on boiler configuration, refer to Figures 19 thru 23F.
5.Secure
6.Insert mating end of burner disconnect harness (power cord) into power outlet receptacle on
7.Install snap bushing into 7/16" diameter hole in upper right corner of burner enclosure back plate on all Beckett burners, see Figure 10. On certain builds, 18/2 wire from L4006A Aquastat Control mounted in rear heater will pass through this snap bushing and connect to
IMPORTANT: Remove (cut) jumper resistor on R7184P Primary Control to activate
Figure 10: Burner Disconnect Junction Box with Power Outlet Receptacle
(Mated to Burners with Disconnect Harness)
25